Addendum 2 is issued by Brevard County Purchasing Services for the Mims Wells 12 & 13 project (Bid #B-7-25-52). The addendum provides clarifications to five technical questions regarding submersible well pumps, including acceptance of Integrity Pump & Motor as an equivalent manufacturer, confirmation of motor type, specification of surface plate design, clarification on stainless steel material requirements, and details about marker balls. The bid opening date remains Tuesday, July 15, 2025, at 10:00 AM, with all other terms and conditions unchanged.
The addendum specifies that 4" marker balls are to be furnished by the contractor and must be color-coded for the utility being installed. Approved marker ball manufacturers are limited to specific 3M models (1404-XR and 1424-XR/iD), with Omni Marker II explicitly deemed unacceptable. An additional attachment (Attachment E - Section 11209) is referenced for further technical details. The document maintains the original procurement framework, providing critical technical clarifications to potential bidders while preserving the fundamental structure of the original bid solicitation.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Services 2725 Judge Fran Jamieson Way
Building C, Room 303 Viera, Florida 32940
Mims Wells 12 & 13 Bid#B-7-25-52 July 03, 2025
ADDENDUM 2
TO ALL PROSPECTIVE BIDDERS
This is an Addendum to and shall be considered as part of the original bid package for the above-mentioned bid. Please acknowledge receipt of Addendum 2 in space provided on Price Sheet. Bidders are requested to acknowledge receipt of this addendum with their bid.
CLARIFICATION TO QUESTIONS RECEIVED:
Question 1: 11209-1.02.B: Integrity Pump & Motor can meet the criteria specified for the submersible well pumps. Please consider adding Integrity Pump & Motor as an equivalent manufacturer. Attached is the pump curve.
Answer: Integrity Pump & Motor is accepted as an equivalent manufacturer for the submersible well pumps, provided the submitted pump meets the specified performance criteria.
Question 2: 11209-2.02.B.1: This sub section mentions a vertical solid shaft motor. This type of motor is typically used on a vertical turbine line shaft pump. Please confirm that the motor shall be a submersible motor.
Answer: The motor shall be suitable for use with a submersible well pump, and not a vertical solid shaft motor.
Question 3: 11209-2.02.G.3: This sub section mentions a long radius discharge elbow which is typical for a submersible well pump. However, plan sheet D-501 shows a tee/L shaped surface plate. Please confirm surface plate shall be per the specifications.
Answer: A long radius discharge elbow is not acceptable for this application. The surface plate shall be a tee, per sheet D-501 in the contract drawings.
Question 4: 11209-Table 11209-B: This table mentions pump, impeller and motor materials shall be stainless steel. Please confirm super duplex stainless steel is required as stated throughout the rest of the specifications.
Answer: The pump, impeller and motor shall be 304 stainless steel. Super duplex stainless steel is not necessary for this application. See Attachment E for further clarification.
Question 5: Are marker balls going to be used? If so will the city provide them?
Answer: 4” marker balls are required and furnished by the contractor; color coded for the utility to be installed. Approved manufacturers are listed in Table 1.
Table 1 – Approved Marker Ball Manufacturers
Manufacturer Model or Specification 3M 1404-XR (ball)
1424-XR/iD(ball)
Question 6: Are Omni Marker II an acceptable marker ball to use?
Answer: Omni Marker II is not an acceptable product. See Table 1 for further information.
Additional Attachments:
Attachment E – Section 11209
Please note that the bid opening date and time remains Tuesday, July 15, 2025 @ 10:00 AM.
All other terms and conditions remain unchanged.
Sincerely, Mary Bowers Purchasing Manager