This document is an Addendum to the bidding documents for the Middle School Ceiling and Lighting Improvements (Phase 1) & Office Renovation project for Berrien Springs Public Schools in Berrien County, Michigan. The addendum includes revisions to the Bid Form, specifications for fire-rated glass, and drawing revisions. Bidders are required to submit the revised Bid Form and include Allowance 1 ($6,000) to repair mechanical pipe hangers and Allowance 2 ($4,000) to replace deteriorated mechanical pipe insulation in their base bids. The project also includes two alternates to replace existing glazing and window frames in the office area. Bids are due on an unspecified date.

The document provides detailed requirements for the fire-rated glass product to be used, including size limitations, labeling, and testing standards. Pricing information is included for the base bid, cost breakouts, and the two alternates. No information is provided about set-asides, incumbents, funding sources, or the contract term.

View the file

Other files

File Type Posted
Addendum #3.pdf PDF
Addendum #1.pdf PDF
Invitation to Bid - CORRECT BID.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 2

Middle School Ceiling and Lighting Improvements (Phase 1) & Office Renovation Berrien Springs Public Schools

February 9, 2024

This addendum forms a part of the Contract Documents and modifies the original Bidding Documents (PROJECT MANUAL dated 24 January 2024). Please acknowledge receipt of this Addendum when submitting your bid. This Addendum has been distributed to the plan holders of record only. It is the bidder’s responsibility to distribute Addendum information to subcontractors and material suppliers. This Addendum reflects modifications from the Owner, Architect, and Bidders.

ATTACHMENTS

• Revised Bid Form

• Spec Section 088813, Fire-Rated Glass

• Drawing Sheet A3.0

• Drawing Sheet A4.2

• Pipe hanger details

GENERAL / CLARIFICATION

1. Bidders are required to submit the revised Bid Form.

2. Keying and lock cores: The Contractor shall provide Stanley Cylinders, but do not include IC cores in sets. The owner will purchase keying and cores direct from Elmers Locksmith of Niles.

The existing keys are Sargent S.

3. Per the schedule: LD-1 should be provided as the specified FL-10 w/ the FBPI plenum. (The detail is symbolic or generic.)

4. Bidders are required to include Allowance 1 in their Base Bid:

Contractor shall carry an allowance of $6,000.00 to repair the improper mechanical pipe hangers discovered in areas of exposed ceilings during the Phase 1 work. Follow the attached hanger detail to prevent condensation from dripping onto new ceilings. A value of $120.00 per occurrence (50 occurrences) was used. Log all occurrences with the Architect and Owner’s Rep as you proceed through the Phase 1 scope of work. Any additional occurrences beyond 50 will also be compensated at $120.00 each.

5. Bidders are required to include Allowance 2 in their Base Bid:

Contractor shall carry an allowance of $4,000.00 to apply toward replacement of mechanical pipe insulation that is worn and deteriorated to the point of needing replacement and considered to be contributing to damage to the ceiling tiles. A value of $12.00/ lineal ft. x 10% the project’s 2,000 lineal ft. may be used. Log all occurrences with the Architect and Owner’s Rep as you proceed

CARMI Design Group, Inc.

210 E Main Street . P.O. Box 487 . Niles, MI 49120

P: 269.663.5073 . E: info@carmi.biz through the Phase 1 scope of work. Additional replacement beyond the allowance will also be compensated at $12.00/ per linear foot.

SPECIFICATIONS

• 088813_Fire-Rated Glass

DRAWING SHEETS

1. A3.0, Finish Schedule, Door Schedule & Elevations: includes elevations of existing windows and frames described in Alternate 1 & 2

2. A4.2, Reflected Ceiling Plan – Phase 1: Added Keynote 6

END OF ADDENDUM NO. 2

Bid Form - 1

BID FORM

PROJECT: Middle School Ceiling and

Lighting Improvements (Phase 1) & Office Renovation

OWNER: Berrien Springs Public Schools 285 Sylvester Avenue Berrien Springs, MI 49103

PROPOSAL FROM: __________________________________________________________________ Company Name

Address

City, State, ZIP

CONTRACT NO. 1 – Middle School Ceiling and Lighting Improvements (Phase 1)

& Office Improvements

Base Bid

___________________________________________________ $______________________ Base Bid Written Amount

Cost Breakout – Middle School Ceiling and Lighting Improvements (Phase 1)

Cost Breakout – Middle School Office Renovation

Allowance 1 – Middle School Ceiling and Lighting Improvements (Phase 1)

Allowance to repair insulation at 50 mechanical pipe hangers: $6,000.00

Include this amount in Base Bid

Allowance 2 – Middle School Ceiling and Lighting Improvements (Phase 1)

Allowance to apply toward replacement of deteriorated mechanical pipe insulation: $4,000.00

Include this amount in Base Bid

Bid Form - 2

Alternate 1 – Middle School Office Renovation

Replace existing glazing in window frames/sidelites indicated on drawing sheet A3.0 with new FireLite 20-minute rated glazing.

____________________________________________________ $___________________ Add

Alternate 2 – Middle School Office Renovation

Replace existing window frames/sidelites indicated on drawing sheet A3.0 with new 20-minute rated frames.

____________________________________________________ $___________________ Add

Voluntary Alternate (if provided)

Description

_________________________________________________ $______________________ (Add/Deduct)

Additional items to be included with Bid Form:

5% BID BOND YES NO

List of warranted projects YES NO

List of subcontractors YES NO

Iran Economic Sanctions Act Certification YES NO

Familial Disclosure Statement YES NO

Written Narrative for Inclusions / Exclusions YES NO

Summary Schedule YES NO

Acknowledge Receipt of

ADDENDUM NO.: ONE TWO THREE

SUBMITTED BY:

_____________________________________________________ Date:________________, 2024 Signature

Printed

Title

Phone Number Email

Berrien Springs Public Schools 088813- 1 Fire-Rated Glass Middle School Ceiling and Lighting Improvements (Phase 1) & Office Renovation

SECTION 08 88 13

FIRE-RATED GLASS – FIRELITE®

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1 Fire-rated glazing materials installed as windows in fire-rated frames.

1.2 REFERENCES

A. American Society for Testing and Materials (ASTM):

1. ASTM E2010-01: Standard Test Method for Positive Pressure Fire Tests of Window

Assemblies.

B. Glass Association of North America (GANA):

1. GANA – Glazing Manual.

2. FGMA – Sealant Manual.

C. National Fire Protection Association (NFPA):

1. NFPA 80: Fire Doors and Windows.

2. NFPA 257 – Fire Tests of Window Assemblies.

D. Underwriters Laboratories, Inc. (UL):

1. UL 9 – Fire Tests of Window Assemblies.

1.3 DEFINITIONS

A. Manufacturer: A firm that produces primary glass, fabricated glass or framing as defined in referenced glazing publications.

1.4 SUBMITTALS

A. Comply with requirements of Section 01 33 00.

B. Product data: Submit manufacturer’s technical data for each glazing material required, including installation and maintenance instructions.

C. Certificates of compliance from glass and glazing materials manufacturers attesting that glass and glazing materials furnished for project comply with requirements. Separate certification will not be required for glazing materials bearing manufacturer’s permanent label designating type and thickness of glass, provided labels represent a quality control program involving a recognized certification agency or independent testing laboratory acceptable to authority having jurisdiction.

D. Product Test Listings: From UL indicating fire-rated glass complies with requirements, based on comprehensive testing of current product.

E. Samples: Submit, for verification purposes, approx. 8-inch by 10-inch sample for each type of glass indicated.

Berrien Springs Public Schools 088813- 2 Fire-Rated Glass

Improvements (Phase 1) & Office Renovation

1.5 QUALITY ASSURANCE

A. Glazing Standards: GAMA Glazing Manual and FGMA Sealant Manual.

B. Fire Protective Rated Glass: Each lite shall bear permanent, nonremovable label of UL certifying it for use in tested and rated fire protective assemblies.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to specified destination in manufacturer or distributor’s packaging, undamaged, complete with installation instructions.

B. Store off ground, under cover, protected from weather and construction activities.

1.7 WARRANTY

A. Provide manufacturer's limited warranty.

PART 2 - PRODUCTS

2.1 MANUFACTURERS-

A. Manufacturer: FireLite® as manufactured by Nippon Electric Glass Company, Ltd., and distributed by Technical Glass Products, 8107 Bracken Place SE, Snoqualmie, WA 98065 Phone: 800.426.0279, Email: tgp.sales@allegion.com, Website: http://www.fireglass.com

2.2 PERFORMANCE REQUIREMENTS

A. Fire-rated glass ceramic clear and wireless glazing material listed for use in non-impact safety-rated locations such as transoms and borrowed lites with fire rating requirements ranging from 20 to 90 minutes with required hose stream test.

B. Passes positive pressure test standards UL 10C.

2.3 MATERIALS-GLASS

A. Properties:

1. Thickness: 3/16 inch.

2. Weight: 2.56 lbs/ft2

3. Approximate Visible Transmission: 88 percent.

4. Approximate Visible Reflection: 9 percent.

5. Hardness (Vicker’s Scale): 700.

6. Fire-rating: 20 minutes to 90 minutes.

7. Impact Safety Resistance: None.

8. Positive Pressure Test: UL 10C; passes.

9. Surface Finish:

a. Standard Grade is polished for a surface quality that is comparable to alternative fire-rated ceramics marketed as having a premium finish.

10. Positive Pressure Test: UL 10C; passes.

B. Maximum sheet sizes based on surface finish:

1. Premium: 48 inches by 96 inches.

2. Standard: 48 inches by 96 inches.

3. Obscure: 36 inches by 96 inches.

Berrien Springs Public Schools 088813- 3 Fire-Rated Glass

Improvements (Phase 1) & Office Renovation

C. Labeling: Permanently label each piece of FireLite® with the FireLite® logo, UL logo and fire rating in sizes up to 3,325 sq. in., and with the FireLite® label only for sizes that exceed the listing (as approved by the local authority having jurisdiction).

D. Fire Rating: Fire rating classified and labeled by UL for fire rating scheduled at opening locations on drawings, when tested in accordance with ASTM E2010-01 NFPA 257 UL 9 and

UL 10B.

E. Substitutions: No substitutions permitted.

2.4 GLAZING COMPOUND FOR FIRE-RATED GLAZING MATERIALS

A. Glazing Tape: Closed cell polyvinyl chloride (PVC) foam, coiled on release paper over adhesive on two sides, maximum water absorption by volume of 2 percent. Glass panels that exceed 1,393 sq. inches for 90-minute ratings must be glazed with fire-rated glazing tape supplied by manufacturer.

B. Glazing Compound: DAP 33 putty.

C. Silicone Sealant: One-part neutral curing silicone, medium modulus sealant, Type S; Grade NS; Class 25 with additional movement capability of 50 percent in both extension and compression (total 100 percent); Use (Exposure) NT; Uses (Substrates) G, A, and O as applicable. Available Products:

1. Dow Corning 795 - Dow Corning Corp.

2. Silglaze-II 2800 - General Electric Co.

3. Spectrem 2 - Tremco Inc.

D. Setting Blocks: Neoprene, EPDM, or silicone; tested for compatibility with glazing compound; of 70 to 90 Shore A hardness.

E. Cleaners, Primers, and Sealers: Type recommended by manufacturer of glass and gaskets.

2.5 FABRICATION

A. Fabricate glass and other glazing products in sizes required to glaze openings indicated for Project, with edge and face clearances, edge and surface conditions, and bite complying with recommendations of product manufacturer and referenced glazing standard as required to comply with system performance requirements.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine glass framing, with glazier present, for compliance with the following:

1. Manufacturing and installation tolerances, including those for size, squareness, offsets at corners.

2. Minimum required face or edge clearances.

3. Observable edge damage or face imperfections.

B. Do not proceed with glazing until unsatisfactory conditions have been corrected.

C. Clean glazing channels and other framing members receiving glass immediately before glazing.

Remove coatings that are not firmly bonded to substrates.

Berrien Springs Public Schools 088813- 4 Fire-Rated Glass

Improvements (Phase 1) & Office Renovation

3.2 INSTALLATION (GLAZING)

A. Comply with referenced FGMA standards and instructions of manufacturers of glass, glazing sealants, and glazing compounds.

B. Protect glass from edge damage during handling and installation. Inspect glass during installation and discard pieces with edge damage that could affect glass performance.

C. Set units of glass in each series with uniformity of pattern, draw, bow, and similar characteristics.

D. Cut glazing tape to length and set against permanent stops, flush with sight lines to fit openings exactly, with stretch allowance during installation.

E. Place setting blocks located at quarter points of glass with edge block no more than 6 inches from corners.

F. Glaze vertically into labeled fire-rated metal frames or partition walls with same fire rating as glass and push against tape for full contact at perimeter of pane or unit.

G. Place glazing tape on free perimeter of glazing in same manner described above.

H. Install removable stop and secure without displacement of tape.

I. [Use specified glazing compound, without adulteration; bed glazing material in glazing compound; entirely fill all recess and spaces. Provide visible glazing compound with smooth and straight edges.]

J. Install so that appropriate UL markings remain permanently visible.

3.3 PROTECTION AND CLEANING

A. Protect glass from contact with contaminating substances resulting from construction operations. Remove any such substances by method approved by glass manufacturer.

B. Wash glass on both faces not more than four days prior to date scheduled for inspections intended to establish date of substantial completion. Wash glass by method recommended by glass manufacturer.

3.4 GLAZING SCHEDULE

Rating

Assembly

Max. Exposed Area (Sq. In.)

Max. Width Of Exposed Glazing (In.)

OR

Max. Height Of Exposed Glazing (In.)

Stop

Height

20 to 60 min.

Other than doors HMS or wood* Fireframes® D.S.

3,325 3,325

5/8” 3/4"

* HMS indicates hollow metal steel framing. Fireframes® D.S. indicates Designer Series narrow profile framing available from TGP. For wood frames, check with manufacturer for maximum tested glass sizes.

END OF SECTION

T H

R U

1/

1/

/2

7 6

9 8

10 9

11 10

W E

L D

N O

M

IN

A L

P

IP

E S

IZ

E in

M A

X

IM

U M

P

IP

E

T U

B

IN

G S

U P

P O

R T

S P

A C

IN

G

3 12 11

P

IP

E ft

T U

B

IN

G ft

N O

T E

: F O

R T

R A

P E

Z E

T A

K E

S P

A C

IN

G

O F

S M

A L

L E

S T

S

IZ

E O

N T

P R

A P

E Z

E

7 5

4 14 12

5 16 13

6 17 14

8 19 16

10 2

12 2

14 2

16 2

18 2

S A

D D

L E

P R

O V

ID

E

H

IG

H C

O M

P R

E S

S

IV

E

S

R E

N G

T H

IN

S

U L

A T

IO

N

P

F

M

IN

. D E

N S

IT

Y

U

N D

R

IN

U

L A

T

IO

N S

H

IE

L D

IN

S

U L

A T

IO

N

V

A P

O R

B A

R R

IE

Y P

E

IS

R E

Q U

IR

E

D F

O R

L O

W

M P

E R

A T

U R

E P

IP

IN

G

H A

N G

E R

R O

D

IN

S

U L

A T

IO

N

S H

IE

L

D A

T H

A N

G E

R

P R

O V

ID

E

I N

S U

L A

T

IO

N

H

IE

L

D

I N

S E

R T

F

A L

L P

IP

IN

G

M

IN

1/

D

IA

. H

A N

G E

R R

O D

S W

IT

H

M

A X

. S P

A C

IN

G

O N

E A

C H

C H

A N

N E

L

/8

G

A U

G E

C H

A N

N

L x x

1/

A

N G

L E

1" MAX.

B A

N D

A D

J U

S T

A B

L E

C L

E V

IS

H

A N

G

D

J S

U T

A B

L E

C L

E V

IS

H

A N

G

ID

E V

IE

W

T R

A P

IZ

E

H A

N G

E R

F

U P

T O

L B

. U N

IF

O

R M

L O

D

HANGER ROD ATTACHED TO

STRUCTURE ABOVE

NON-

INSULATED

PIPE

PIPE INSULATION AS

REQUIRED

TYPE 40 & 41 INSULATION PROTECTION

SHIELD (FIGURE 167)

NOTES:

1. SIZE RODS, SPRING CUSHION, AND HORIZONTAL MEMBER APPROVED TO SATISFY LOAD

REQUIREMENT WITH SAFETY FACTOR OF 5.

2. FIGURE NUMBERS ARE TYPICAL TO GRINNELL SUPPORT NUMBERS.

EQUAL LEG ANGLE

ASSEMBLY (FIG. 50 CHANNEL

ASSEMBLY (FIG. 45), OR

UNIVERSAL TRAPEZE

ASSEMBLY (FIG. 46)

ROOM FINISH LEGEND

FINISH TAG MANUFACTURER STYLE NAME COLOR NAME COLOR NO.

SHERWIN-WILLIAMSP-1 ALABASTER SW 7008PAINT

SHERWIN-WILLIAMSP-2 SANDBAR SW 7547

SHERWIN-WILLIAMSP-3

INTERIOR WALLS

ACCENT WALLS

REMARKS

ELEPHANT EAR SW 9168 HM DOOR/WINDOW FRAMESPRO INDUSTRIAL PRE-CAT WATERBASED EPOXY

PRO INDUSTRIAL PRE-CAT WATERBASED EPOXY

PRO INDUSTRIAL PRE-CAT WATERBASED EPOXY

INPRORVP-1 DROP WVN-05RIGID VINYL PANEL 48" H., RESTROOM WALLSPALLADIUM PATTERNS - WOVEN

CARPET CPT-1 INTERFACE CUBIC HORIZONTAL 6386

LUXURY VINYL TILE LVT-1 J + J FLOORING GROUP TIMELESS NOTABLE 1000

LAY-IN CLG. GRID G-1 ARMSTRONG PRELUDE ML 15/16"

WHITE -ACP-1 ARMSTRONG CIRRUS ML 15/16" ANGLED TEGULAR (584)

WHITE -

VINYL WALL BASE VB-1 TARKETT 6" TRADITIONAL COVE BASE WELSH CASTLE TA8

9" x 48" PLANK, 5MM THICK

2'x2'x3/4"ACOUSTIC CLG. PANEL

ROOM FINISH LEGEND GENERAL NOTES:

1. WALLS: EG-SHEL FINISH; DOOR FRAMES, SEMI-GLOSS FINISH

2. NO SUBSTITUTIONS ALLOWED FOR SHERWIN-WILLIAMS PAINT (SCHOOL DISTRICT STANDARD)

PLAS. LAMINATE PL-1 WILSONART HPL NATURAL COTTON 4946-38 COUNTERTOPS

PL-2 WILSONART HPL SKYLINE WALNUT 7964K-12 CABINETS

24" x 24" TILE

CERAMIC TILE CT-1 VITL CONTRACT RIFT GREIGE 12" x 24" TILE--

INPROVCG-1 FEATHER 0238VINYL CORNER GUARD SEE LOCATIONS ON FINISH PLAN48" H., 1-1/2" WING, TAPE ON WITHOUT TAPE

SHERWIN-WILLIAMSP-4 RYEGRASS SW 6423 ACCENT WALLSPRO INDUSTRIAL PRE-CAT WATERBASED EPOXY

F

S E

E S

C H

E D

SEE SCHED.

NL

S E

E S

C H

E D

SEE SCHED.

7" 6"

M A

X

I

2" SEE

SCHED.

2"

S E

E S

C H

E D

RECEPT.

HALL

NURSE

106 BREAK RM.

CA WORK RM.

HALL

CONF. RM.

SOC. WORKER

COUNSELOR

118MTG.

MTG.

HALL

HALL

STOR.

FOOD SERV.

ASST.

PRINCIPAL

PRINCIPAL

PBIS

HALL

FILES

TLT.

TLT.

VEST.

101LEGEND

CARPET TILE, CPT-1; NON-DIRECTIONAL

VINYL PLANK, LVT-1; INSTALL IN

DIRECTION SHOWN ON PLAN; 1/3 DROP

CERAMIC TILE, CT-1; INSTALL IN

1/3 OFFSET PATTERN

PAINT WALL P-2 (SANDBAR)

PAINT WALL P-4 (RYEGRASS)

VCG-1; CORNER GUARD

GLAZING = 1248 S.I.

GLAZING =

1242 S.I.

GLAZING =

1242 S.I.

(7) WINDOW UNITS, RECEPT. 102

(1) WINDOW UNIT, C.A. WORK RM 110

GLAZING =

540 S.I.

GLAZING =

260 S.I.

2" 23" 2" 23" 2"

52" 14"

2" 10" 2"

(2) SIDELITE UNITS, RECEPT. 102

(1) SIDELITE UNIT, HALL 105

DATE

210 E. MAIN STREET; P.O. BOX 487

NILES, MICHIGAN 49120

P: 269.663.5073

THE INFORMATION ON THIS SHEET IS

THE PROPERTY OF CARMI design group inc. AND MAY NOT BE REPRODUCED

WITHOUT WRITTEN CONSENT FROM

CARMI design group inc.

Copyright 2023 ©

PROJECT #

DRAWN BY

ISSUEDNO. DATE

CHECKED BY

CDG TCL

FOR CONSTRUCTION

C U s e rs \C a rm i\ D o c u m e n ts \B

S P

S M

S O ff ic e R e n o v a ti o n C e n tr a l_ s u s a n

P U

N W

.r v t

/9

/2

:3

:2

P

M

CEILING AND LIGHTING

IMPROVEMENTS

(PHASE 1) & OFFICE

RENOVATION

1-26-2024

BERRIEN SPRINGS

PUBLIC SCHOOLS

BERRIEN SPRINGS, MICHIGAN

2023.037

FINISH SCHED.,

DOOR SCHED.

& ELEVATIONS

A3.0

MIDDLE SCHOOL

1-26-2024

ROOM FINISH SCHEDULE

ROOM

NO. ROOM NAME FLOOR FINISH WALL BASE

WALLS CEILINGS DOORS

NOTESNORTH EAST SOUTH WEST FINISH DOOR MATL. FRAME MATL.

101 VEST. EXIST. TO REMAIN VB-1 P-1 P-4 P-1 P-1 EXIST. TO REMAIN -- --

102 RECEPT. CPT-1 VB-1 E-BRICK CMU / P-1 CMU / P-1 E-BRICK G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3 1, 3

103 HALL CPT-1 VB-1 -- P-1 P-1 P-1 G-1, ACP-1 -- --

104 HALL CPT-1 VB-1 P-1 P-1 P-4 P-1 G-1, ACP-1 -- --

105 HALL CPT-1 VB-1 P-1 P-1 P-1 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3 1

106 NURSE LVT-1 VB-1 P-1 P-1 P-1 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

107 TLT. CT-1 VB-1 P-1, RVP-1 P-1, RVP-1 P-1, RVP-1 P-1, RVP-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3 2

108 TLT. CT-1 VB-1 P-1, RVP-1 P-1, RVP-1 P-1, RVP-1 P-1, RVP-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3 2

109 BREAK RM. LVT-1 VB-1 P-4 P-1 P-1 P-1 G-1, ACP-1 -- --

110 CA WORK RM. CPT-1 VB-1 P-1 P-4 P-1 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3 1

111 FILES CPT-1 VB-1 P-1 P-1 P-1 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

112 HALL CPT-1 VB-1 P-1 P-1 P-1 P-1 G-1, ACP-1 -- --

113 CONF. RM. CPT-1 VB-1 P-1 P-2 P-1 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

114 PBIS CPT-1 VB-1 P-1 P-2 P-1 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

115 HALL CPT-1 VB-1 P-1 P-1 P-1 P-1 G-1, ACP-1 -- --

116 PRINCIPAL CPT-1 VB-1 P-1 P-1 P-2 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

117 SOC. WORKER CPT-1 VB-1 P-2 P-1 P-1 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

118 COUNSELOR CPT-1 VB-1 P-2 P-1 P-1 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

119 ASST. PRINCIPAL CPT-1 VB-1 P-1 P-1 P-2 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

120 FOOD SERV. CPT-1 VB-1 P-1 P-1 P-2 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

121 STOR. CPT-1 VB-1 P-1 P-1 P-1 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

122 MTG. CPT-1 VB-1 P-1 P-1 P-1 P-2 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

123 MTG. CPT-1 VB-1 P-1 P-1 P-2 P-1 G-1, ACP-1 WOOD / MFR. FIN. HMTL / P-3

ROOM FINISH SCHEDULE NOTES:

1. PAINT BOTH SIDES OF HMTL WINDOW AND/OR DOOR FRAMES P-3.

2. INSTALL CERAMIC TILE CT-1 COVE BASE ON ALL WALLS

3. DO NOT PAINT EXISTING BRICK

3/8" = 1'-0"

DOOR ELEVATIONS

3/8" = 1'-0"

FRAME ELEVATION

DOOR & FRAME SCHEDULE

MARK TYPE

DOOR

GLAZING

DOOR FRAME FIRE

RATING

HARDWARE

SET NO. NOTESWIDTH HGT THK MATL FINISH MATL. EL.

102A NL 3' - 0" 7' - 1 1/2" 1 3/4" 1/4" FG WD PRE-FIN. E-HMTL - 20 MIN. 09 1, 2, 3

102B NL 3' - 0" 7' - 1 1/2" 1 3/4" 1/4" FG WD PRE-FIN. E-HMTL - 20 MIN. 10 1, 2, 3

105 NL 3' - 0" 7' - 1 1/2" 1 3/4" 1/4" FG WD PRE-FIN. E-HMTL - 20 MIN. 08 1, 2, 3

106 F 3' - 0" 7' - 0" 1 3/4" - WD PRE-FIN. HMTL 1 - 06

107 F 3' - 0" 7' - 0" 1 3/4" - WD PRE-FIN. HMTL 1 - 04

108 F 3' - 0" 7' - 0" 1 3/4" - WD PRE-FIN. HMTL 1 - 05

110 NL 3' - 0" 7' - 0" 1 3/4" 1/4" TEMP. WD PRE-FIN. HMTL 1 - 06

111 F 3' - 0" 7' - 0" 1 3/4" - WD PRE-FIN. HMTL 1 - 07

113 NL 3' - 0" 7' - 0" 1 3/4" 1/4" TEMP. WD PRE-FIN. HMTL 1 - 01

114 NL 3' - 0" 7' - 0" 1 3/4" 1/4" TEMP. WD PRE-FIN. HMTL 1 - 03

116 NL 3' - 0" 7' - 0" 1 3/4" 1/4" TEMP. WD PRE-FIN. HMTL 1 - 03

117 NL 3' - 0" 7' - 0" 1 3/4" 1/4" TEMP. WD PRE-FIN. HMTL 1 - 03

118 NL 3' - 0" 7' - 0" 1 3/4" 1/4" TEMP. WD PRE-FIN. HMTL 1 - 03

119 NL 3' - 0" 7' - 0" 1 3/4" 1/4" TEMP. WD PRE-FIN. HMTL 1 - 03

120 NL 3' - 0" 7' - 0" 1 3/4" 1/4" TEMP. WD PRE-FIN. HMTL 1 - 03

121 F 3' - 0" 7' - 0" 1 3/4" - WD PRE-FIN. HMTL 1 - 06

122 NL 3' - 0" 7' - 0" 1 3/4" 1/4" TEMP. WD PRE-FIN. HMTL 1 - 01

123 NL 3' - 0" 7' - 1 1/2" 1 3/4" 1/4" TEMP. WD PRE-FIN. E-HMTL 1 - 02 1, 2

DOOR & FRAME NOTES

1. E-HMTL DENOTES AN EXISTING DOOR FRAME TO REMAIN. NOTE THAT

THE EXISTING HMTL FRAME DOES NOT HAVE A 4" HEAD, RESULTING IN A

NON-STANDARD DOOR SIZE

2. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXISTING

DOOR AND FRAME HEIGHTS AND ENSURING THAT THE NEW DOORS FIT

IN THE EXISTING HMTL FRAMES

3. REPLACE EXISTING GLAZING IN EXISTING FRAME WITH FIRE GLASS; SEE

SPECIFICATIONS SECTION 088000

1/8" = 1'-0"1

ROOM FINISH PLAN

N

GENERAL NOTE

1. REFER TO PROJECT MANUAL FOR DOOR HARDWARE SETS

2 ADDENDUM 2 2-9-24

1/2" = 1'-0"

OFFICE RENOVATION ALTERNATES 1 & 2

ALTERNATE 1: REPLACE ALL EXISTING GLAZING IN WINDOWS AND SIDELITES WITH

20-MIN. FIRE-RATED GLAZING; REFER TO SPEC SECTION 088813; EXISTING HMTL.

FRAMES TO REMAIN. BASE BID: EXISTING GLAZING TO REMAIN.

ALTERNATE 2: REPLACE EXISTING HM WINDOW FRAMES/SIDELITES WITH NEW 20-

MINUTE RATED HM FRAMES. BASE BID: EXISTING GLAZING TO REMAIN.

SO

S

O

O

S

S

O

O

O

S O

O

S

O

O

O

S

S

O

O

S

O

O

S S

SS

S S

O

O

O

S

S

S

O

SO

O

O

O

O

O

S

S

S

S

O

SEE OFFICE PLANS FOR

WORK IN THIS AREA

N.I.C.

N.I.C. N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

12' - 0"

8' - 8"

8' - 8"

8' - 8"

8' - 8"

8' - 8"

8' - 8"

8' - 8" 8' - 8"

8' - 8"

8' - 8"

8' - 8"

8' - 8"

8' - 8"

8' - 8"

LIGHTING

EXISTING

8' - 8"

8' - 8"

1 3

A5.0

8' - 8"

8' - 8"

4 5

N.I.C.

A5.0

A5.0

KEY PLAN

N.T.S.

N

PHASE 1 WORK

OFFICE WORK

A. CONTRACTOR SHALL FOLLOW CEILING GRID PATTERN ESTABLISHED ON THE

REFLECTED CEILING PLAN. ANY VARIATIONS SHALL BE APPROVED BY THE

ARCHITECT.

B. MOUNT SPEAKERS AND SUPPLY AIR DIFFUSERS IN THE CENTER OF WHOLE

CEILING PANELS.

C. WIRE CEILING FROM STRUCTURE ABOVE AND WIRE FOR ADDITIONAL LOAD AT

LIGHTS AND CEILING DIFFUSERS.

D. CONFIRM AND COORDINATE QUANTITY AND LOCATIONS OFOCCUPANCY

SENSORS WITH VENDOR AND SUBMIT FOR APPROVAL.

E. LIGHTING CIRCUITRY IN EACH ROOM WILL REMAIN COMMON WITH EXISTING

CONDITIONS.

F. EXIT SIGNS AND EMERGENCY FIXTURES TO BE CONNECTED TO LOCAL

LIGHTING CIRCUIT WITH POWER LOSS SENSING LEAD CONNECTED AHEAD OF

LOCAL CONTROLS.

G. SUPPORT EXISTING AND NEW DATA CABLES ABOVE ALL NEW CEILINGS WITH

J-HOOKS; nVENT CADDY CAT HP J-HOOK SYSTEM, CAT64HP, OR EQUAL.

FASTEN J-HOOKS TO ROOF JOISTS. SPACING NOT TO EXCEED 5'-0".

GENERAL NOTES

1. EXISTING CEILING HVAC UNIT - TO REMAIN

2. NEW DRYWALL BULKHEADS/SOFFITS; 3-5/8" MTL. STUDS WITH 5/8"

DRYWALL, ALL EXPOSED SIDES PAINTED; 8'-6" A.F.F. ; REFER TO

DETAIL

3. EXISTING CEILING MOUNTED PROJECTOR; OWNER WILL REMOVE AND

REINSTALL. LEAVE SUPPORT BRACKET IN PLACE.

4. REMOVE EXISTING FRP CEILING AT SOFFIT ON WEST SIDE OF

CAFETERIA; REPLACE WITH NEW 4' X 12' FRP PANELS AND TRIM,

MOUNTED ON EXISTING STRUCTURE; REFER TO DETAIL

5. REMOVE EXISTING FRP CEILING AT SOFFIT ON EAST SIDE OF

CAFETERIA; REPLACE WITH NEW 5/8" GYPSUM BOARD, MOUNTED ON

EXISTING STRUCTURE; REFER TO DETAIL

6. IN CLASSROOMS, CLASSROOM OFFICES, AND BREAK ROOMS THE

BATT INSULATION ABOVE THE CEILING IS TO BE REMOVED/ DEMOED.

THIS INSULATION SERVES NO USE, AS THE INSULATION ABOVE THE

ROOF DECK HAD BEEN IMPROVED IN A PREVIOUS RENOVATION OF

ROOFING WORK. ALL INSULATION LAYING ON THE CEILING GRID TO BE

REMOVED.

REFLECTED CEILING

KEYNOTES

/3 A5.0

/4 A5.0

/5 A5.0

REFLECTED CEILING

PLAN LEGEND

NEW 2'X2' SUSPENDED ACOUSTICAL CEILING SYSTEM

SUSPENSION: ARMSTRONG PRELUDE ML 15/16"

EXPOSED TEE SYSTEM; WHITE

CEILING PANELS: ARMSTRONG CIRRUS ML 15/16"

ANGLED TEGULAR (584); 2 x 2 x 3/4" WHITE

REFER TO PLAN FOR HEIGHT A.F.F.

NEW GYPSUM BOARD SOFFITS/BULKHEAD;

PAINT UNDERSIDE AND VERTICAL SURFACES

SHERWIN WILLIAMS (SW 6734, ESPALIER)

REFER TO DETAIL

NEW SUPPLY DIFFUSER

NEW RETURN DIFFUSER

NEW EXIT SIGN

REFER TO LIGHTING PLANS

CEILING MOUNTED PROJECTOR (EXISTING)

CEILING MTD. OCCUPANCY SENSOR

REFER TO LIGHTING PLANS

O

NEW 2x2 LIGHT FIXTURE

REFER TO LIGHTING PLANS

CEILING MTD. SPEAKER (RELOCATED)

REFER TO LIGHTING PLANS

S

8' - 0"

NEW 4" LINEAR DOWNLIGHT, INTEGRATED INTO

CEILING GRID; REFER TO LIGHTING PLANS

CEILING HEIGHT

NEW 4'-0" X 12'-0" SURFACE-MOUNTED TRUSSCORE PVC

PANELS CEILING SYSTEM (WEST SIDE OF CAFETERIA);

REFER TO SPECIFICATIONS SECTION 066000

NEW RECESSED DOWNLIGHT; REFER TO

LIGHTING PLANS

NEW SURFACE-MOUNTED GYPSUM BOARD CEILING

(EAST SIDE OF CAFETERIA)

/3 A5.0

NEW 72" SURFACE MOUNT LINEAR

DIFFUSER (IN CAFETERIA)

SHOP

CORRIDOR

BOOKS

STORAGE

BREAK

139A

CORRIDOR

DRAFTING

STO.

STO.

STO.

146A

STO.

146B

TOOLS

146C

OFFICE

146D

BOYS

CAFETERIA

CORR.

CORRIDOR

LOBBY

LOBBY

GIRLS

CLASSROOM

CLO.

105A

DATE

THE INFORMATION ON THIS SHEET IS

THE PROPERTY OF CARMI design group inc. AND MAY NOT BE REPRODUCED

WITHOUT WRITTEN CONSENT FROM

CARMI design group inc.

Copyright 2023 ©

PROJECT #

CAD FILE #

DRAWN BY

ISSUEDNO. DATE

CHECKED BY

210 E. MAIN STREET; P.O. BOX 487

NILES, MICHIGAN 49120

P: 269.663.5073

CDG TCL

FOR CONSTRUCTION

C U s e rs

\C a rm i\ D o c u m e n ts

\2

.0

B S

P S

M id d le

S c h o o l C e ili n g

L ig h ti n g C e n tr a l s te v e

J Y

S

.r v t

/9

/2

:4

:3 A

M

CEILING AND

LIGHTING

IMPROVEMENTS

(PHASE 1) &

OFFICE

RENOVATION

1-26-2024

BERRIEN

SPRINGS

PUBLIC

SCHOOLS

BERRIEN SPRINGS,

MICHIGAN

2022.027

REFLECTED

CEILING PLAN -

PHASE 1

A4.2

MIDDLE SCHOOL

1-26-2024

N

1/8" = 1'-0"1

REFLECTED CEILING PLAN - PHASE 1

P H

A S

E

P H

A S

E

P H

A S

E

P H

A S

E

1 ADDENDUM 1 2-9-24

File details come from the government source that posted it. Updated .