Addendum_2.pdf
PDF 261 KB Posted
- Attached to
- RFP - 75A0581 - Fleet Modernization
- Solicitation number
- 75A0581
- Issued by
- Sacramento County, Sacramento City, California
About this file
The document is an Addendum No. 2 for Request for Proposal (RFP) #75A0581 issued by the California Department of Transportation (Caltrans) for the Fleet Modernization Project. The project aims to completely modernize California's existing intercity fleet in a sustainable and cost-effective manner by renovating the vehicle interiors and exteriors over a 9-month period. The selected design firm is expected to provide a conceptual design study supported by stakeholder surveys, and the project will involve a mock-up vehicle (or scale model) for prototype testing and production before the designs are installed on the rest of the railcar fleet over a 4-year period.
The solicitation document does not have any updates for digital accessibility at this time, and requests for accessible versions can be submitted to ADAdocs@dot.ca.gov or by calling (833) 713-2922. The project will involve the jurisdictions of Sacramento County and Sacramento City, and the Addendum addresses questions related to the potential inclusion of windshields, windows, or interior privacy panels, as well as the status of any additional addendums.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum_1.pdf | ||
| RFP_Solicitation_Package_75A0581.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA------- CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, Governor
DEPARTMENT OF TRANSPORTATION
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30th STREET, MS-65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
FAX (916) 227-6155
TTY 711
INTERNET http://www.dot.ca.gov/dpac
Making Conservation A California Way of Life.
March 26, 2024
Addendum No. 2 Request for Proposal (RFP) #75A0581
Fleet Modernization Project
NOTICE TO ALL PROSPECTIVE PROPOSERS:
Addendum No. 2 is being issued for the above-referenced RFP. Proposals for this work shall be submitted with the full understanding of this Addendum.
THE FOLLOWING REPRESENT QUESTIONS SUBMITTED AND DEPARTMENT OF
TRANSPORTATION ANSWERS:
Question 1: Can you please advise if this modernization project will include any windshields, windows, or interior privacy panels?
Answer 1: It is possible that this project will involve those components, but without the conceptual design, we will not know if those are required yet. As this project is solely for the design work for the contract, it is unlikely that any supplies will be required at this stage.
Question 2: Have there been any additional addendums since addendum 1?
Answer 2: No, this addendum is the second addendum for this project.
NOTE: All other terms and conditions set forth in the RFP remain in full force and effect.
Sincerely, Erik Groen Contract Analyst
File details come from the government source that posted it. Updated .