This is Addendum 2 to an Invitation to Bid (ITB) issued by Columbia County Public Works in Oregon for a Transfer Station Tipping Floor project (S-C00055-00000947). The addendum, dated October 14, 2021, modifies the original ITB issued October 8, 2021, and addresses four primary changes: correction of the Table of Contents within the ITB, modification of project timelines, addition of as-built drawings to the contract documents, and acceptance of equal materials. The Notice to Proceed and Project Start Date have been revised to "TBD" based on material availability. The addendum adds architectural, structural, electrical, and mechanical drawings (C04-C17, S09-S15, E01-E10, E13, and M04-M07) to Attachment C. Section 4.5 of the original ITB regarding Liquidated Damages has been moved to the Work to be Done section, while the original Section 4.6 has been marked as Not Used.
The addendum permits the use of equal materials in Specification 02002 Concrete Topping, specifically authorizing "EucoFloor 404" as an equivalent product. All other sections and requirements of the original ITB remain unchanged. Michael Whitfield, Assistant Director of Columbia County Public Works, is identified as the issuing officer and primary contact for questions regarding this addendum.
Text of this file
ADDENDUM 2
REQUEST FOR PROPOSALS
S-C00055-00000947 for Transfer Station Tipping Floor for Public Works
Date of Addendum: October 14, 2021
| Issuing Office: | Columbia County Public Works | |
| Michael Whitfield, Assistant Director | ||
| 1054 Oregon Street | ||
| St. Helens, OR 97051 | ||
| Phone: (503) 367-5090 | ||
| Fax: (503) 397-7215 | ||
| E-mail: michael.whitfield@columbiacountyor.gov |
This addendum is being issued for the following purposes:
1. Correction of TOC within the ITB.
2. Modify Project Timelines
3. Addition of as-built drawings to Attachment B
4. Acceptance of equal material All other sections of the original ITB issued October 8, 2021 remain unchanged.
1. Table of Contents – 4.5 Liquidated Damages, change to Work to be Done.
2. Table of Contents – 4.6 Work to be Done, change to Not Used.
3. Section 3. PROPOSED PROJECT TIMELINE – Notice to Proceed and Project Start Date TBD, based on material availability.
4. Attachment C: Drawings – add drawings C04-C17, S09-S15, E01-E10, E13 and M04-M07.
5. Specification 02002 Concrete Topping – add equal material “EucoFloor 404”.
End of Addendum 2
ITB # S-C00055-00000947
image1.jpg image2.jpg
Other files
| File | Type | Posted |
|---|---|---|
| Exh1_SS-642-18_OSP_Spec.doc | DOC document | |
| Exh2_Rider_to_SMA.pdf | ||
| Exh_3_OSP_Spec_SS_10-5-2021.pdf | ||
| REQ-DASOBO-00019403_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .