About this file
Addendum No. 2 is issued by the Madison Metropolitan Sewerage District (MMSD) for the Effluent Cabinet Analyzer System project, supplementing the original Request for Bid. The addendum, dated July 14th, 2025, provides revisions to the project background and scope, including clarifications on the intended location for the analyzer system on the UV mezzanine and modifications to the requirements for component and accessory listings. The bid opening is scheduled for 11 am on July 18th, 2025, with bidders required to acknowledge receipt and acceptance of the addendum by signing and submitting it with their bid. Failure to include the signed addendum may result in the bid being considered nonresponsive.
The addendum introduces additional flexibility for vendors by allowing multiple equipment options to be listed with associated costs, enabling district staff to choose from various mounting equipment alternatives. Vendors are also encouraged to include optional ancillary equipment that may provide additional benefits. The changes aim to provide more comprehensive information about initial installation costs, recurring operational expenses, and potential supplementary equipment. No specific pricing details or budget constraints are mentioned in this addendum, but it aligns with the broader RFP's goal of selecting a vendor based on qualifications, product quality, budget, schedule, and system complexity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Competitive Proposals - Effluent Cabinet Analyzer System.docx | DOCX document | |
| Addendum 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
Effluent Cabinet Analyzer System
Madison Metropolitan Sewerage District 1610 Moorland Road Madison, WI 53713 July 14th, 2025 All Potential Bidders:
The attached changes, additions, and/or deletions to the above contract documents are hereby made as fully and completely as if the same were fully set forth therein.
All bidders shall acknowledge receipt and acceptance of the Addendum by signing in the space provided below and submitting the signed Addendum with the bid. Bids submitted without this Addendum may be considered nonresponsive. Comment by Matt Leitzen: Addendum must align with your advertised specification.
Example:
May – change that wouldn’t prejudice the bidders.
Shall – change that could prejudice a bidder.
MADISON METROPOLITAN SEWERAGE DISTRICT
Any questions may be directed to:
Carly Amstadt Process and Research Engineer
RECEIPT ACKNOWLEDGED AND CONDITIONS AGREED TO THIS DAY OF
, 2020
BY BIDDER
ADDENDUM NO. 2
To the Bidding Documents Effluent Cabinet Analyzer System For the Madison Metropolitan Sewerage District Date: July 14th, 2025 Bid Opening: 11 am July 18th, 2025
TO: ALL BIDDERS BIDDING ON THE ABOVE PROJECT:
This Addendum consists of 5 pages.
The following are revisions to the REQUEST FOR BID:
A. Background
The following paragraph and associated images shall be added to the background section:
The following images show the intended location for the effluent cabinet analyzer system on the UV mezzanine. The effluent analyzer system is planned to be placed in the back corner of the mezzanine on the concrete flooring. Discharge from the effluent sampler pumps and/or the cabinet analyzers can go into the grating over the effluent cannel to the left.
B. Section (4.) in Project Scope and Deliverables
The following paragraph shall be deleted in its entirety:
4. Provide an itemized list of components and accessories for each such as reagents, filtering modules, self-cleaning components, sensor cabling and connectors, rail mounting accessories capable of supporting the analyzer and controller (stainless steel, max 2” diameter), etc.
a. This list must include itemized costs, and information on expected/recommended replacement intervals. The intention is to understand the initial installation cost as well as recurring operational costs for the system.
And shall be replaced with:
4. Provide an itemized list of components and accessories for each such as reagents, filtering modules, self-cleaning components, sensor cabling and connectors, rail mounting accessories capable of supporting the analyzer and controller (stainless steel, max 2” diameter), etc.
a. This list must include itemized costs, and information on expected/recommended replacement intervals. The intention is to understand the initial installation cost as well as recurring operational costs for the system.
b. If multiple acceptable options exist for a piece of equipment (such as mounting equipment) the Vendor may list the various options separately with their associated costs for District staff to choose from.
c. Any other ancillary equipment, which although not necessary for the system, may provide an additional benefit or use can be included in this itemized list with its cost as an optional add on.
image2.jpeg image3.jpeg image4.jpeg image1.png
File details come from the government source that posted it. Updated .