About this file
This is Addendum #2 issued by the California Department of Parks and Recreation for the John Marsh House Stabilization Phase B project at Marsh Creek State Park (Bid Number C24863033). The addendum, issued February 5, 2025, provides clarifications regarding wooden window frame removal at 4-5 interior locations where existing frames remain in stone openings, noting these must be carefully removed for state storage and future restoration. The bid due date is March 5, 2025 at 2 PM, and a second building viewing is scheduled for February 17, 2025 from 1-2 PM, though contractors who did not attend the original job showing are ineligible to bid.
The addendum addresses several contractor questions, clarifying that special inspections details can be found in Section 050519 'Post Installed Anchors' subsection 3.3A, confirming the State's Representative will handle final sign-off for the existing State Fire Marshall permit with no additional permits or fees required, and noting there is no spray foam work involved in the project despite the presence of Section 072800 in the specifications. The State will also arrange for removal of stored materials on the 1st floor near the south wall if requested by the winning bidder prior to construction start.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Forms_C24863033.pdf | ||
| JMH_Phase_B_Drawings_24x36.pdf | ||
| Addendum_1_C24863033.pdf | ||
| Project_Manual_C24863033.pdf | ||
| Drawings_C24863033.pdf | ||
| Job_Showing_Sign-in_C24863033.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of California Natural Resources Agency Gavin Newsom, Governor
DEPARTMENT OF PARKS AND RECREATION Armando Quintero, Director 2241 Harvard Street, Suite 200 Sacramento, CA 95815
ADDENDUM #2
Issued: February 5, 2025
MARSH CREEK STATE PARK
John Marsh House Stabilization Phase B
Bid Number: C24863033
Bid Date: March 5th, 2025, 2 PM
The changes in this addendum shall be included in the Project and this addendum shall be part of the Project documents. All conditions not affected by this addendum shall remain unchanged.
1. Clarifications:
1) Along the interior of the building there are 4-5 locations where the existing wooden window frame remains in the stone window opening. This will likely impede installation of steel framing at these locations. The contractor base bid shall include the careful removal of these wooden window frame and casings for State storage and eventual restoration.
2) If prior to commencement of construction, the winning bidder requests that the stored materials on the 1st floor near the south wall be removed, the State shall arrange for this area to be cleared.
2. Questions (Q) and Answers (A):
3) Q: Who will pay for special inspections (pull test, epoxy anchors installation observation etc.)?
A: The bidders attention is directed to Section 050519 ‘Post Installed Anchors’, subsection 3.3A
4) Q: Specification Section. 000810/B requires contractor to receive all necessary environmental documents and permits from the State. Please clarify what permits, who pays etc.
A: The State’s Representative will coordinate final sign off for the existing State Fire Marshall permit. There are no additional permit or fees.
Addendum #2 Bid Number: C24863033 Issued: February 5, 2025
5) Q: There is Section 072800 – Spray Foam System. Do we have any scope of work covered by Section 072800?
A: There is no spray foam work.
6) Q: Will be second job showing scheduled?
A: The building will be open for a second viewing Monday February 17th, 1pm to 2pm. A prime contractor that did not attend the original job showing would be ineligible to bid.
END OF ADDENDUM #2