Addendum 2 AP-26-725.pdf

PDF 176 KB Posted

Attached to
Rubber & Paint Removal on Airfield Pavements
Solicitation number
AP-26-725
Issued by
Los Angeles County, California

About this file

This Addendum No. 2 to RFP No. AP-26-725 issued by the City of Long Beach Department of Financial Management on November 3, 2026, addresses questions and answers regarding rubber and paint removal services on airfield pavements. The addendum clarifies licensing requirements, project scope, and operational parameters for an estimated 300,000 square feet of rubber removal work. Key clarifications include acceptance of Class A (General Engineering Contractor) licenses, C-32 (Parking and Highway Improvement Contractor) licenses, and C-61/D-38 Sand and Water Blasting licenses, provided contractors submit documented evidence of relevant experience specific to the scope. The Airport typically allocates two consecutive nighttime runway closures for rubber removal work, permits contractors to propose work schedules based on equipment capabilities, and allows multiple rubber removal units to operate simultaneously to meet production requirements. Contractors may utilize leased equipment provided it meets all applicable specifications and operational requirements.

The addendum further specifies that cleaning heads must be air-operated; hydraulic-fluid-driven cleaning-head mechanisms are prohibited, though hydraulic components elsewhere in the hydroblasting system are permissible if they comply with all other applicable specifications and safety requirements. Proposers must acknowledge receipt of this addendum by signing and submitting it with their proposals, with failure to do so potentially resulting in disqualification. The document emphasizes that only written communication confirmed by the City Contact constitutes official project guidance, and any oral communication or information occurring outside the specified communication process is not binding on the City.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Financial Management 411 West Ocean Boulevard, 6th Floor

Long Beach, CA 90802

(562) 570-6425

November 3, 2026

NOTICE TO PROPOSERS

ADDENDUM NO. 2: Questions & Answers

RFP No. AP-26-725 Rubber & Paint Removal on Airfield Pavements

This addendum changes and supersedes the language in the original RFP.

Please acknowledge receipt of this addendum by signing and submitting with your proposal. Any proposer who fails to submit this addendum may be disqualified.

The City would like to remind Proposers that pursuant to Section 5.2.27 of the RFP, the City will not be responsible for or bound by any oral communication or any other information or contact that occurs outside the official communication process specified herein, unless confirmed in writing by the City Contact.

The questions and answers are as follows:

1. Q: I noticed the license requirement didn’t include an “A” license. We have been doing airfield rubber removal and striping for over 12 years. Do you think there’s a possibility to add an “A” license?

A: Yes, a Class A license (General Engineering Contractor) is acceptable, provided that the contractor provides documented evidence of relevant experience specific to the scope.

2. Q: For the estimated 300,000 square feet of rubber removal, how many consecutive nighttime runway closures are typically allocated to complete each cleaning?

A: Typically, we have two nighttime closures.

3. Q: Does the Airport have a minimum expected production rate per shift, or is the contractor permitted to propose a work schedule based on its equipment capabilities?

A: We typically like to keep rubber removal down to two consecutive nights. If the contractor feels we need additional service, we will need to schedule in advance.

Addendum # 2 RFP AP-26-725

4. Q: Would the Airport permit multiple rubber removal units to operate simultaneously to meet production requirements?

A: Yes, we will allow units to run simultaneously.

5. Q: Are there any restrictions on utilizing leased equipment, provided the equipment meets all applicable specifications and operational requirements?

A: As long as the equipment meets all of the applicable specifications there will be no restrictions.

6. Q: The specifications require a C-61/D-38 Sand and Water Blasting contractor license.

Please confirm whether a contractor holding a C-32 Parking and Highway Improvement Contractor license may bid the specified water-blasting and pavement-marking removal work. C-32 - Parking and Highway Improvement Contractor.

California Code of Regulations

Title 16, Division 8, Article 3. Classifications A parking and highway improvement contractor applies and installs protective coatings, vehicle stops, guard rails and mechanical devices, directional lines, buttons, markers, signs and arrows on the horizontal surface of any game court, parking facility, airport, highway or roadway constructed of concrete, asphalt or similar material. This classification includes the surface preparatory work necessary for the application of protective coatings but does not include the re-paving of these surfaces.

A: Yes, a C-32 (Parking and Highway Improvement Contractor) is acceptable, provided that the contractor provides documented evidence of relevant experience specific to the scope.

7. Q: The specifications state that cleaning heads must be air-operated and hydraulic-fluid-driven heads are not allowed.

Please clarify whether this requirement applies specifically to the rotary cleaning-head drive mechanism or to the entire hydroblasting system.

Would the Airport consider approving an alternative cleaning-head drive system if the equipment provides equivalent performance and includes adequate hydraulic-fluid containment and spill-prevention measures?

A: The requirement that cleaning heads be air-operated and that hydraulic-fluid-driven cleaning heads are not permitted applies specifically to the cleaning-head drive mechanism. It does not prohibit hydraulic components elsewhere in the hydroblasting

Addendum # 2 RFP AP-26-725 system, provided those components comply with all other applicable specifications and safety requirements. All other requirements remain unchanged.

PREPARED BY: Richard Peoples, Assistant Administrative Analyst

ACKNOWLEDGED BY: __________________________________________________

Company Name

Print Name Title

Signature Date