Addendum #2 8-7-2024.pdf
PDF 1 MB Posted
- Attached to
- Grafton New Public Access Site & Boat Dock
- Solicitation number
- CRFQ-0310-DNR2500000001-3
- Issued by
- Kanawha County, Charleston City, West Virginia
About this file
This document is an Addendum #2 issued by the West Virginia Purchasing Division on behalf of the West Virginia Division of Natural Resources for a centralized request for quote related to the construction of a new public access site and boat dock in Grafton, WV. The addendum publishes responses to vendor questions, a pre-bid sign-in sheet, and clarifies specifications such as the limits of disturbance, clearing limits, construction stakeout, survey control, asbestos abatement, and lighting details. The solicitation closes on August 22, 2024 at 1:30 PM. The contractor will be responsible for marine construction services, with the project located within the City of Grafton and thus subject to any applicable local taxes or fees. The addendum also provides details on the sanitary sewer line, epoxy coated rebar, and areas requiring seed and mulch outside the paved surfaces.
The contract will be awarded to the lowest qualified bidder. Funding for this project is provided by the West Virginia Division of Natural Resources. Contractors are required to comply with all terms and conditions outlined in the solicitation documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Printed: Aug 7, 2024 Page: 1 FORM ID: WV-PRC-CRFQ-002 2020/05
Department of Administration Purchasing Division 2019 Washington Street East Post Office Box 50130 Charleston, WV 25305-0130
State of West Virginia Centralized Request for Quote
Construction
Proc Folder: 1459674 Reason for Modification:
Doc Description: Grafton New Public Access Site & Boat Dock Addendum #2 issued to publish agency responses to all vendor questions, publish pre-bid sign in sheet. See attached.
Proc Type: Central Purchase Order
Date Issued Solicitation Closes Solicitation No Version
2024-08-07 2024-08-22 13:30 CRFQ 0310 DNR2500000001 3
BID RECEIVING LOCATION
BID CLERK
DEPARTMENT OF ADMINISTRATION
PURCHASING DIVISION
2019 WASHINGTON ST E
CHARLESTON WV 25305
US
VENDOR
Vendor Customer Code:
Vendor Name :
Address :
Street :
City :
State : Country : Zip :
Principal Contact :
Vendor Contact Phone: Extension:
FOR INFORMATION CONTACT THE BUYER
Joseph E Hager III
(304) 558-2306 joseph.e.hageriii@wv.gov
Vendor Signature X FEIN# DATE
All offers subject to all terms and conditions contained in this solicitation
Date Printed: Aug 7, 2024 Page: 2 FORM ID: WV-PRC-CRFQ-002 2020/05
ADDITIONAL INFORMATION
The West Virginia Purchasing Division is soliciting bids on behalf of the West Virginia Division of Natural Resources to establish a contract for the construction of a new public access site in Grafton, WV per the attached specifications and terms and conditions.
INVOICE TO SHIP TO
DIVISION OF NATURAL
RESOURCES
STATE OF WEST VIRGINIA
PARKS & RECREATION-PEM
SECTION
JOBSITE - SEE
SPECIFICATIONS
324 4TH AVE
SOUTH CHARLESTON WV No City WV
US US
Line Comm Ln Desc Qty Unit Issue Unit Price Total Price 1 Marine construction services
Comm Code Manufacturer Specification Model #
72000000
Extended Description:
Grafton PAS
SCHEDULE OF EVENTS
Line Event Event Date
Revised 6/8/2012
SOLICITATION NUMBER: [Insert RFQ, RFP No.] Addendum Number: [Insert Number]
The purpose of this addendum is to modify the solicitation identified as [insert RFQ, RFP No.] (“Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specifications of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.
Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Attachment A
RFI: Vendor Questions for CRFQ DNR 25*01 Grafton Boat Ramp Public Access
Q.1. Will a limits of disturbance be given?
A. The LOD is 0.994 acres and is shown on the attached file.
Q.2. Will a clearing limits be given?
A. All trees, brush or other organic material within the Limit of Disturbance shall be cleared.
Q.3. Will the contractor be responsible for layout?
A. Contractor is responsible for all construction stakeout services.
Q.4. Will survey control be given to awarded contractor?
A. Survey control will be provided to the awarded contractor.
Q.5. Has all asbestos/abatement been completed?
A. From best available information, the existing structures do not contain any asbestos containing materials. If the contractor encounters any material he/she believes may contain asbestos, the contractor shall notify the owner immediately before proceeding.
Q.6. The area of HMA overlay on the Sycamore Street has a lot of vegetation and base failures in the current pavement. How will these areas be delt with or approved for the 1” overlay? Several areas will require scratch to level existing asphalt.
A. No additional asphalt work will be done in the area of overlay. Contractor shall include scratch course if he/she feels it is necessary.
Q.7. The new lights do not show if they are to be powered by above ground wire or below ground, can you provide further information on how these lights and poles are to be provided with power?
A. All new lighting shall be powered by below ground conductors from nearby electrical sources in coordination with Mon Power and in accordance with current National Electric Code.
Q.8. Can additional information be provided for the light pole, light fixture, light pole base if needed?
A. Lights shall be a standard dusk/dawn type fixture, mounted on a 16’ wooden pole.
Q.9. Will a casing or other protection be required for the sanitary line under the ramp? The cover over the line to finished grade is only 2.71’ and elevations do not allow the full plan compacted subgrade and stone section above the line.
A. The sanitary sewer line was designed with input from Grafton Public Works and no protection or sleeve is required. The top of the sewer pipe will lie within the 6” compacted soil subgrade beneath the ramp. Contractor to take necessary precautions during installation of the sanitary sewer line and ramp in this area.
Q.10. Is this project in city limits? Will this project be subject to B&O tax?
A. This project is within the City of Grafton. This project shall be subject to B&O tax or other fees imposed by the City of Grafton.
Q.11. Some of the areas outside of the HMA parking lot have gravel that will remain, does this area need to be stripped and seeded or left as is?
A. All areas outside of the asphalt paving, within the limit of disturbance, shall be stripped and receive seed and mulch.
Q.12. I am just verifying that the rebar for the concrete ramp is to be epoxy coated as that is what looks like is specified, but it is not called out on the drawings as epoxy coated bar?
A. Per the specifications, it is epoxy coated.
S Y
C
A M
O
R
E
S
T R
E E
T
R
O
W
R O
B E
R T
D
E L
A N
I E
L
F
A R
A N
C E
L I S
A
M
I C
H E
L L
E
F
A R
A N
C E
B
P
G
A L
L
O
F
L
O T
S
A
C
T H
E
S
T A
O A
D
C
O M
M I S
S I O
N
F
W
S
T
V
I R
G I N
I A
P
G
F U
T U x
S T
O R
A G
E
B
U I L
D I N
G
B O
A
M
P
W
E S
T P
IK
E
S T
R
E E
T
N E
W
A
S P
H A
L
P
R
K I N
G
N
E
Z g p s n s i n a s p h a l t
B M n s s t a t i c n s n s n s n s n s
I G
N A
L
W
W
S T
R E
G
N
S P
E E
D
S
I G
N
S T
G
N
P P
G
H T
S T
M
G
R A
C
O N
C
Z
I N
V
C
M P
Z
X
X
X
X
X
X
X
X
X
X
N
W
E
S S
S M
H
R
M
I N
V
C
M
I N
I N
V
C
M
I N n s
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
O B
S C
U R
E
A
R E
A
U N
A B
T
O P
O
M
E
O
F
S
U R
V E
Y
X
X
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
D
I
T
C
H
N
E
I N
V
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
K I N
G
L
L C
P
G
P
A
C
W I L
L I A
M
E
M E
S
U R
V
P
G
P
A
C
R
R
A S
P H
A
V E
R L A
Y
M A
T C
H
E
X I S
T
B
C
E D
W
A T
E R
U
N
N
A
M
I
B
U
T
A
G
A
L
L
V
E
R
M A
T C
H
T
O
V E
R L A
Y
M A
T C
H
T
O
V E
R L
A Y
M H
M H
.0
.0
S
P A
C E
S
A
D A
S P
A C
E
S
P A
C E
S
.0
.0
B E
G
IN
B
O
A T
R A
M
P S
T A
.3
E N
D B
O
A T
R A
M
P
S T
A
.5
M A
T C
H
T
O
E X
I S
T I N
G
A
S P
H A
L T
S I L
T
F
E N
C E
S E
E
D
E T
A
E
E T
N E
W
L
I G
H T
C O
O R
D I N
A T
E
W
O R
K
W I T
H
M
W
E R
S I L
T
F
E N
C E
S E
E
D
E T
A I L
S
H E
E T
N E
W
L I G
H T
C O
O R
D I N
A T
E
W
O R
K
W I T
H
M
W
E R
R
I P
R A
P
F
I L L
P
R O
T E
C T
I O
N
M
I N
I M
U
P
T H
R E
M O
W
T
H
L
I G
H T
P R
O P
O S
D
N
H O
L E
M A
N H
O L
E
R
I N
V
I N
V
O
P R
O P
O S
D
N
H O
L E
M A
N H
O
R
I N
V
I N
V
O
E
X
I S
T
I
S
A
N
I T
A
R
Y
S
E
W
N
E
E
X
I S
T
I
S
A
N
I T
A
R
Y
S
E
W
N
E
O
P
O
S
E
D
S
A
N
I T
A
W
N
E
D
P
E
I
C
L A
U
A R
D R
A I L
W
B
U F
F E
R E
D
E
N D
S
C
H
E
N D
N E
W
L I G
H T
C O
O R
D I N
A T
E
W
O R
K
W I T
H
M
W
E R
N E
W
L I G
H T
C O
O R
D I N
A T
E
W
O R
K
W I T
H
M
W
E R
N O
T E
C
O N
T R
A C
T O
R
S
H A
L L
B
E
R
E S
P O
N S
I B
L E
F O
R
M
A I N
T A
I N
I N
G
S
A N
I T
A R
Y
S
E W
O P
E R
A T
I N
G
C
O N
D I T
I
R
O U
G H
O U
T
T
H E
D U
R A
T I O
N
O
F
T
N
S T
R U
C T
I O
N
P
R O
J E
C T
C O
O R
D I N
A T
E
A
L L
W
O R
K
W
I T
H
P
U B
L I C
W O
R K
S
D
E P
A R
T M
E N
T
N O
T E
A
L L
S
L O
P E
S
N
C
E I V
I N
G
R I P
R A
P
P
R O
T E
C T
I O
N
S
H A
L L
B
E
L I N
E D
W I T
H
T
E M
P O
R A
O
S I O
N
C
O N
T R
O L
M A
T T
I N
G
C O
N T
R O
L
J O
I N
T
T
Y P
C
O N
C
P
A R
K I N
G
B L O
C K
T
Y P
C
O N
C
P
A R
K I N
G
B L O
C K
T
Y P
L
F
D
P
E
I
C
L A
U
A R
D R
A I L
W
B
U F
F E
R E
D
E
N D
S
C
H
E
N D
AL
PH
A
AS
SO
C
IA
TE
S, IN
C
PR
AI
RI
E
AV
EN
UE
M
O
RG
AN
TO
W N, W V
PH
O
NE
/F
AX
: 3
-2
-8
TO
LL
FR
EE
: 8
-6
-8 w w w .th in kA
LP
HA
fir st.
co m
AR
C
HI
TE
TS
EN
IN
EE
RS
AutoCAD SHX Text
EXISTING EDGE OF WATER 8-11-2022
AutoCAD SHX Text
EXISTING EDGE OF WATER 8-17-2023
AutoCAD SHX Text
EXISTING EDGE OF WATER 8-11-2022
AutoCAD SHX Text
EXISTING EDGE OF WATER 8-17-2023
AutoCAD SHX Text
POWER POLE
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
NO.
AutoCAD SHX Text
AutoCAD SHX Text
YEAR
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
TAYLOR
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
DIVISION OF NATURAL RESOURCES
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
THE STATE OF WEST VIRGINIA
AutoCAD SHX Text
SUBMITTED:
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
GRAFTON BOAT DOCK
AutoCAD SHX Text
AutoCAD SHX Text Z:\Projects\2022_Jobs\220607100\Drawings\Civil\Current\Construction\5.dwg
AutoCAD SHX Text
GRAFTON, WV - SYCAMORE STREET
AutoCAD SHX Text
MAY 3, 2024
AutoCAD SHX Text
AutoCAD SHX Text
NEW ASPHALT PARKING
AutoCAD SHX Text
ASPHALT OVERLAY
AutoCAD SHX Text
NOTE: ALL ELECTRICAL WORK TO BE COMPLIANT WITH CURRENT NATIONAL ELECTRIC CODE
Revised 6/8/2012
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.:_____________
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.
Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
[ ] Addendum No. 1 [ ] Addendum No. 6
[ ] Addendum No. 2 [ ] Addendum No. 7
[ ] Addendum No. 3 [ ] Addendum No. 8
[ ] Addendum No. 4 [ ] Addendum No. 9
[ ] Addendum No. 5 [ ] Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.
| Draft_CRFQ_0310_DNR2500000001_3_WV_CRFQ_FORM |
| DRAFT Addendum #2 8-7-2024 |
| AddendumStandardFormat |
| Text1: CRFQ 0313 DNR2500000001 |
| Text2: No.02 |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Yes |
| Check Box7: Yes |
| Check Box8: Off |
| Check Box9: Yes |
| Text3: Addendum issued to publish and distribute the attached documentation to the vendor community. |
1. Vendor Q&A.
2. LOD Drawing
3. Pre-bid Sign-in Sheets.
Text4: CRFQ DNR25*01
File details come from the government source that posted it. Updated .