Addendum 2 - 47427 Hangar 6 - Roof and Envelope.pdf
PDF 356 KB Posted
- Solicitation number
- ITB Bryant Airfield - 47427 Hangar Roof and Envelope - 02A7026001
- Issued by
- Alaska
About this file
Summary
This is an Addendum 2 document issued by the Department of Military and Veterans Affairs (DMVA), FMO Design and Construction Section, State of Alaska, modifying the solicitation for the BAAF - 47427 Hangar 6 - Roof and Envelope Replacement Project (Project Number: 02A7026001) located at Bryant Airfield, Joint Base Elmendorf-Richardson, Alaska. The project scope includes removal of roofing, envelope, and siding; replacement of the roof membrane; sealing of all penetrations; and replacement of materials with new construction, utilizing dust control systems to prevent contamination of other building areas. The contractor must supply all labor, equipment, materials, disposal, cleanup, licenses, insurance, and travel expenses. The pre-bid walkthrough is scheduled for September 2, 2026, at 10:00am Alaska Time, with registration required a minimum of two days prior; contractors are limited to two individuals per company. The original project completion date has been changed from December 31, 2027, to September 30, 2027. The bid submission deadline is 1:00pm Alaska Time on September 15, 2026, with late bids rejected and no extensions permitted due to fiscal year constraints.
The addendum addresses four key questions and answers relevant to bidder inquiries. The hangar must maintain a minimum of 50 percent usability throughout construction. Base access requests require only the first and last names of individuals attending the walkthrough, with participants meeting directly at Hangar 6. Base passes will be issued at the Fort Richardson Visitor Center, where registered individuals' names will be placed on a 72-hour log; passes may be picked up beginning Wednesday, September 2, 2026, at 8:00am. The contact for all project inquiries is Gavin M. Fairbanks, Building Management Specialist, at (907) 428-7187 or gavin.fairbanks@alaska.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BAAF - 47427 Hangar Roof and Envelope.pdf | ||
| Addendum 1 - 47427 Hangar 6 - Roof and Envelope.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Military and Veterans Affairs
FMO Design and Construction 57024 Roosevelt Rd
PO Box 5169
JBER, AK 99505
Email: gavin.fairbanks@alaska.gov
Issue Date: August 31, 2026
ATTN: Vendors
RE: Project Name: BAAF – 47427 Hangar 6 – Roof and Envelope Replacement Project Number: 02A7026001 Project Location(s): Bryant Airfield, Joint Base Elmendorf-Richardson, Alaska
Addendum # Two (2)
This addendum forms a part of the contract documents and modifies the original drawings and/or specifications for the subject work. In case of conflicts between this addendum and previously issued documents, this addendum shall take precedence.
The following administrative changes have been made to this ITB:
1. This addendum is being issued to change the project completion date from December 31, 2027, to September 30, 2027.
Questions and Answers:
1. Can we get full access to the hanger during construction?
A. The hangar must have a minimum of 50% usability at all times.
2. Please send the base access request form, or advise what additional information you need, including whether you need vehicle details in advance.
A. Only information that is needed is First and Last name of individuals needing access to attend the walk through.
mailto:gavin.fairbanks@alaska.gov
Department of Military and Veterans Affairs
FMO Design and Construction 57024 Roosevelt Rd
PO Box 5169
JBER, AK 99505
Email: gavin.fairbanks@alaska.gov
3. Please confirm where the group is to meet and at which gate, and whether an escort is provided from the gate to the building. The scope of work states only that the location for initial roof access will be shown on site.
A. Individuals will meet at Hangar 6. See map below for general directions (second shown route is not usable).
4. Please confirm that base passes are issued at the Ft. Richardson Visitor Center and that our names will be placed on the 72-hour log there.
A. Correct. Individuals that requested base access will have their names put on the 72-hour log at the Fort Richardson Visitor Center. Individuals will be able to pick their passes up Wednesday, September 2, 2026 as early as 8:00am.
Please contact me if you have any questions.
Sincerely, Gavin M. Fairbanks Building Management Specialist
(907) 428-7187
End of Addendum 2 mailto:gavin.fairbanks@alaska.gov
Addendum # Two (2)