(Addendum 2) 357-025 WOPS Waukazoo Elementary Improvements.pdf

PDF 5 MB Posted

Attached to
Elementary Improvements
Solicitation number
RFP-WOP-250000003174-4
Issued by
Saginaw County, Michigan

About this file

The document is a comprehensive bid package for the West Ottawa Public Schools Waukazoo Elementary Improvements and Sheldon Woods Elementary Electrical Improvements project, managed by Fritz Wahlfield Construction. The project involves renovations at two elementary school locations in Holland and West Olive, Michigan, with bid documents released on October 16, 2025. The bid encompasses 14 distinct bid categories including sitework, concrete, masonry, metals, general trades, roofing, electrical, mechanical, and fire protection. Key bidding dates include a pre-bid walk-through on October 8, 2025, RFIs due by October 10, 2025, and bids due on October 21, 2025, with mandatory post-bid interviews scheduled for October 27-29, 2025. Construction is set to begin during the Christmas break on December 20, 2025, with substantial completion targeted for August 7, 2026.

The bid package includes detailed specifications for each bid category, outlining specific responsibilities, required documentation, and technical requirements. Contractors must provide comprehensive insurance coverage, performance bonds, and submit detailed shop drawings and close-out documents. The project emphasizes quality standards, regulatory compliance, and coordination among multiple trade contractors. Alternates are included for specific scope modifications, such as replacing accordion doors with high-performing acoustic versions and installing concealed fire protection heads. The construction manager will provide basic site facilities like dumpsters and temporary utilities, while contractors are responsible for their own specific equipment, safety measures, and work area management. The project is funded through the West Ottawa Public Schools system, with specific budget allocations implied but not explicitly detailed in the provided documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 10/16/2025

Owner: West Ottawa Public Schools

Project Name: Waukazoo Elementary Improvements & Sheldon Woods Elementary Electrical Improvements

Location: 1294 W Lakewood Blvd., Holland, MI 49424 15050 Blair St, West Olive, MI 49460

CM No.: 357-025

A/E No.: 5-6255 & 5-6249

ADDENDUM NO. 02

SPECIAL NOTE:

The Notice to Bidders, Instruction to Bidders, General Conditions of the Contract Construction, Supplementary

Conditions of the Contract for Construction, and all modifications and previously issued Contract Documentation are a part of the Addendum.

SCOPE OF WORK:

The following items are changes, additions, deletions, clarifications and/or errors and omissions in the plans and specifications and shall be considered by each Bidder regarding their proposal submitted. This document and all its entirety shall be considered part of the Contract Documents.

NOTICE TO ALL BIDDERS:

It is the responsibility of the Bidder to take note of all items covered in this Addendum. It is the responsibility of the

Bidder to review all documentations in total regarding their scope of work and any work that will interface with their scope of work.

ATTACHMENTS:

Specifications: GMB Addendum 002

Drawings: GMB Addendum 002

Other: Front Ends Pre-Bid RFI #’s 1-5

WEST OTTAWA PUBLIC SCHOOLS

Waukazoo Elementary Improvements & Sheldon Woods Elementary Electrical Improvements

SPECIFICATIONS CLARIFICATIONS / REVISIONS:

(Refer to A/E Remarks)

SHEET CLARIFICATIONS / REVISIONS:

(Refer to A/E Remarks)

OTHER:

ITEM NO. 1: FRONT ENDS (ALL CHANGES NOTED IN RED/YELLOW)

Refer to scope of work changes noted in this Addendum which includes an added alternate for Fire Protection, and other clarifying items to the following Bid Category’s scope of work:

General Trades, Fire Protection

ITEM NO. 2: PRE-BID RFI #’S 1-5

Refer to the Pre-Bid RFI questions and answers included in this Addendum.

*Note: The Deadline has passed for submitting RFI’s

WEST OTTAWA PUBLIC SCHOOLS

Waukazoo Elementary Improvements & Sheldon Woods Elementary Electrical Improvements

ADDENDUM

WEST OTTAWA PUBLIC SCHOOLS ADDENDUM 002

5-6249 WO WAUKAZOO ELEMENTARY IMPROVEMENTS & SHELDON

WOODS ELEMENTARY ELECTRICAL IMPROVEMENTS OCTOBER 16, 2025

A/E PROJECT 5-6249 & 5-6255 PAGE 1 OF3

SECTION 00 91 11.02 - ADDENDUM 002

OWNER WEST OTTAWA PUBLIC SCHOOLS

PROJECT

5-6249 WO WAUKAZOO ELEMENTARY

IMPROVEMENTS & SHELDON WOODS

ELEMENTARY ELECTRICAL IMPROVEMENTS

A/E PROJECT 5-6249 & 5-6255

PURPOSE THIS ADDENDUM SHALL FORM PART OF THE

BIDDING DOCUMENTS. CHANGES, ADDITIONS,

CLARIFICATION OR DELETIONS HEREIN

SUPERSEDE THE DRAWINGS AND

SPECIFICATIONS. BIDDERS SHALL INCLUDE

ON THE PROPOSAL FORM

ACKNOWLEDGEMENT OF THE RECEIPT OF

THIS ADDENDUM.

ATTACHMENTS

NEW SPECIFICATIONS: 12 24 00

REISSUED SPECIFICATIONS: TOC, 07 41 13

REISSUED SHEETS: A1.1A, A1.1B, A1.1C, E5.10

SHEETS TO ISSUE TO THE BCC: NONE

SHEETS TO ISSUE TO THE BFS: NONE

ARCHITECT-ENGINEER GMB

616.796.0200

WWW.GMB.COM

CONSTRUCTION MANAGER FRITZ WAHLFIELD CONSTRUCTION

616.784.5833

WWW.WAHLFIELDCONSTRUCTION.COM

ADDENDUM

WEST OTTAWA PUBLIC SCHOOLS ADDENDUM 002

5-6249 WO WAUKAZOO ELEMENTARY IMPROVEMENTS & SHELDON

WOODS ELEMENTARY ELECTRICAL IMPROVEMENTS OCTOBER 16, 2025

A/E PROJECT 5-6249 & 5-6255 PAGE 3 OF3

SPECIFICATION CLARIFICATIONS / REVISIONS

2.1 SECTION TABLE OF CONTENTS (REISSUED)

A. Reissued to show new specification section.

2.2 SECTION 07 41 13 METAL ROOF PANELS (REISSUED)

A. Metal roof panels are to be double-folded and field seamed. See section 3.1 for updated manufacturer specific product types.

2.3 SECTION 12 24 00 WINDOW SHADES (NEW)

A. New section added to cover roller shades.

SHEET CLARIFICATIONS / REVISIONS

3.1 SHEET A1.1A - UNIT 'A' FIRST FLOOR DEMOLITION PLAN (REISSUED)

A. Note to patch and prepare surface where projector is removed added to Demolition Note #17.

B. See plan for demolition tags noting the removal or projector screens in classrooms.

3.2 SHEET A1.1B - UNIT 'B' FIRST FLOOR DEMOLITION PLAN (REISSUED)

A. Note to patch and prepare surface where projector is removed added to Demolition Note #17.

B. See plan for demolition tags noting the removal or projector screens in classrooms.

3.3 SHEET A1.1C - UNIT 'C' FIRST FLOOR DEMOLITION PLAN (REISSUED)

A. Note to patch and prepare surface where projector is removed added to Demolition Note #17.

B. See plan for demolition tags noting the removal or projector screens in classrooms.

3.4 SHEET E5.10 - LIGHTING FIXTURE SCHEDULE (REISSUED)

A. Revised lighting fixture schedule for fixture equivalents.

END OF SECTION

BID CATEGORIES INDEX

1. Sitework

2. Concrete

3. Masonry

4. Metals

5. General Trades

6. Metal Roofing/Metal Panel Systems

7. Membrane Roofing

8. Aluminum Storefronts/Glazing

9. LPDA

10. Flooring

11. Painting

12. Fire Protection

13. Mechanical

14. Electrical

BID CATEGORY NO. 01 - SITEWORK

INCLUDE:

1. Complete Sitework and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

32.9219 SEEDING

2. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL

CONSTRUCTION DRAWING PAGES AND BECOMING FAMILIAR WITH THE COMPLETE SET TO

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. All Excavating and Earthwork as shown on pages C0.01, C2.01, and C8.10.

4. Compacting any imported soils as required to meet compaction requirements of soils for future footings, foundations, slab on grade, and/or backfill material.

5. Responsibility of the contractor to contact Miss Dig at least 36 hours prior to start of work.

6. The CM will provide a one time staking of grades, building footprint, and misc. locations.

a. Additional staking will be at the cost of the contractor.

7. Furnish and Install as shown:

a. Site demolition and site clearing as shown on C2.01

b. Lift Pump Station Work as shown on C2.01 and C8.10

i. Furnish and Install Pumps and Hatches as shown.

c. Seeding as shown on C2.01.

8. Concrete or asphalt cutting to complete work in this scope.

9. Any dewatering necessary to complete this scope of work.

10. Dust control measures for all work in this Bid Category.

11. Daily clean-up at work areas.

12. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

13. All work must be done in accordance with MIOSHA Regulations.

14. Warranties as specified.

15. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

16. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

BID CATEGORY NO. 02 - CONCRETE

1. Complete Concrete and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

03.3511 CONCRETE FLOOR FINISHES

07.2100 THERMAL INSULATION

07.9200 JOINT SEALANTS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install all reinforcement as shown.

4. Provide Sealer and Vapor Barrier as specified.

5. Furnish and install all interior & exterior concrete MEP pads as shown.

a. Furnish and Install Bollards with Sleeves as shown.

6. Furnish and Install Interior Slab on Grade infills as shown on Pages A1.1A and A1.1B.

a. Finish new concrete for new finishes.

b. Install control joints as needed.

7. Furnish and install joint sealants at all new exterior concrete paving as shown and specified.

8. Dust control measures for all work in this Bid Category.

9. Daily clean-up at work areas.

10. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

11. All work must be done in accordance with MIOSHA Regulations.

12. Warranties as specified.

13. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

14. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 03 - MASONRY

1. Complete Masonry and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

04.0511 MASONRY MORTARING AND GROUTING

04.2000 UNIT MASONRY

07.2100 THERMAL INSULATION

07.2500 WEATHER BARRIERS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. All masonry reinforcement, grout fill, loose fill or cavity wall insulation, etc., as shown and/or specified.

4. Grouting solid of new hollow metal frames in masonry.

5. Clean all new masonry.

6. Furnish and Install complete Masonry as shown and specified.

7. Furnish and Install all reinforcement as shown.

8. Demo and tooth in openings called out on Note 1 on pages A1.1A, A1.1B, A1.1C.

a. Furnish and Install CMU and Brick at new openings as shown.

b. Install Lintel as shown. Furnished by others.

c. Masonry Demo and Tooth-In as shown at Clerestory on page A1.1B

9. Cut in Joist Pockets as shown on S3.1A and S3.1B.

10. Masonry Tooth In at interior window opening in RM A113 for window B201.

11. Furnish and Install Masonry Chases in rooms A116, A119, A127, A130, A131, A134, B117, B142, C131, C137, C162, and C167.

12. Masonry infill at Rm B120 as shown.

13. Masonry infill at bottom of windows as shown on A2.1A.

14. All new masonry units need to be rubbed of debris and/or mortar and ready for paint.

15. Furnish and Install all necessary flashing as shown.

a. Masonry membrane flashing as shown.

16. Flashing and weep holes concealed in masonry work. Includes pre-finished flashings.

17. Cavity wall insulation, this includes all spray insulation at all new exterior walls.

18. Joint Sealants at all CMU wall CJs.

19. Fire safe-ing, fire resistant caulking, sound attenuation blankets and acoustical sealants being an integral part of the all system, where shown. Include fire safe-ing at existing masonry walls where shown. See code compliance plans for locations.

20. Install lintels as provided for new openings.

21. Provided rebar caps for all exposed rebar ends installed by this contractor.

22. This contractor is responsible for the disposal of excess masonry and masonry related items. I.e., rubble, cut blocks, mortar, etc., into concrete dumpster. Coordinate this with Construction Manager. It is the responsibility of this contractor to provide its own dumpsters as necessary.

23. All work must be done in accordance to the new Silica Regulations.

24. Furnish and install masonry toothing as required for all new openings as shown. Openings may include, but not limited to: doors, windows, louvers, chases and masonry openings for new MEP work.

25. Installation of anchor bolts at top of wall for wood blocking.

26. Dust control measures for all work in this Bid Category.

27. Daily clean-up at work areas.

28. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

29. All work must be done in accordance with MIOSHA Regulations.

30. Warranties as specified.

31. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

32. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 04 - METALS

1. Complete Metals and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

05.1200 STRUCTURAL STEEL FRAMING

05.2100 STEEL JOIST FRAMING

05.3100 STEEL DECKING

05.5133 METAL LADDERS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Erect new structural steel as shown on S0.01, S0.02, S0.03, S3.1A, S3.1B, S3.1C and S7.01.

4. Furnish and Erect structural reinforcing as shown on S0.01, S0.02, S0.03, S3.1A, S3.1B, S3.1C and S7.01.

5. Furnish and Erect metal deck patching as shown.

6. Furnish New lintels as shown for new mechanical openings.

7. Furnish and Install any shoring needing to complete the work in this scope.

8. Furnish and Install any Fire protection and weld protection needed to complete the work in this scope.

9. All onsite welding must be done by certified welders.

10. Provide Fire Watch for work completed above.

11. Dust control measures for all work in this Bid Category.

12. Daily clean-up at work areas.

13. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

14. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

15. Warranties as specified.

16. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

17. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 05 - GENERAL TRADES

1. Complete General Trades work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

06.1000 ROUGH CARPENTRY

06.2000 FINISH CARPENTRY

06.6100 CAST POLYMER FABRICATIONS

07.9200 JOINT SEALANTS

08.1113 HOLLOW METAL DOORS AND FRAMES

08.1416 FLUSH WOOD DOORS

08.3513.13 ACCORDION FOLDING DOORS

08.7100 DOOR HARDWARE

10.1100 VISUAL DISPLAY UNITS

10.1419 DIMENSIONAL LETTER SIGNAGE

10.2113.17 PHENOLIC TOILET COMPARTMENTS

10.2800 TOILET, BATH, AND LAUNDRY ACCESSORIES

10.5113 METAL LOCKERS

12.3200 MANUFACTURED WOOD CASEWORK

12.2400 WINDOW SHADES (Addendum 002)

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Schedule, take delivery, inventory, and store and install all items noted as “Install Only” above. Provide a list of material received each day to the Construction Manager’s Superintendent. All items not noted are to be furnished and installed.

4. Furnish and Install Floor Protection in the following Areas;

a. A100, A101, A142, C100, C117, C118, C126, C144, C151

i. Floor protection to be One layer of Water Resistant (WR) Hardboard by Protect in area of coverage. Thickness to be 44 mil.

ii. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.

b. Gymnasium B117

i. Floor Protection to be one layer of ½” O.S.B over 6 mil clear poly plastic in area of coverage.

ii. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.

c. A138, B142, C101, C105, C106, C110, C111, C114, C120, C124, C127, C131, C132, C136, C137, C141, C146, C150, C158, C162, C163, and C167.

i. Floor protection to be a vinyl carpet shield covering the entire room along with (2) Sheets of WR Hardboard.

ii. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.

5. Demo as shown on pages A1.1A, A1.1B, A1.1C

a. Notes 2-5, 7-9, 11-17, 19, and 20.

b. Note 1

i. Remove existing Metal Panels as shown on Page A1.1B Clerestory.

c. Note 5 where hash marks are shown for ceiling to be reinstalled this is to be by LPDA category.

d. Furnish and Install temporary enclosures at all new exterior openings for doors, windows, and MEP openings. Make enclosures secure from outside and shed water.

e. Include Dumpster services for Demo specified under this scope of work.

i. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.

6. Furnish and erect all blocking shown on drawings or as specified in Miscellaneous Carpentry. Include all blocking not shown but incidental to your scope of work. Roof Blocking by others.

a. Casework and furnishings blocking as required.

b. Any doors or window bucks as needed/shown.

7. All lumber to be treated as specified.

8. Joint Sealants at all new door frames, casework, and countertops and any application where drywall meets

CMU walls.

9. Furnish and Install all Hollow Metal Door Frames and Window Frames as shown.

10. Furnish and Install all Hollow Metal and Wood Doors Leafs as shown.

11. Furnish and Install all new Door Hardware as shown.

12. Furnish and Install all new Casework, Millwork, and Countertops as shown.

13. Furnish and Install new marker boards and tack boards as shown.

14. Furnish and Install all new Bath Accessories as specified and shown.

15. Furnish and Install Mirrors as shown.

16. Furnish and Install all new Toilet Partitions as specified and shown.

17. Furnish and Install new metal lockers as shown.

a. Includes wood bases as shown.

18. Furnish and Install new roller shades as shown on pages A9.1A, A9.1B, and A9.1C.

19. Dust control measures for all work in this Bid Category.

20. Daily clean-up at work areas.

21. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

22. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

23. Warranties as specified.

24. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

25. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

26. Alternate No. A-1: Provide All Costs Associated with Replacing the small group room accordion doors, as indicated on the plan, with high performing acoustic accordion doors.

a. Required in this scope of work.

BID CATEGORY NO. 06 - METAL ROOFING/METAL PANEL SYSTEMS

1. Complete Metal Roofing/Metal Panel Systems as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.2100 THERMAL INSULATION

07.2500 WEATHER BARRIERS

07.4113 METAL ROOF PANELS

07.4213 METAL WALL PANELS

07.4213.19 INSULATED METAL WALL PANELS

07.4213.23 METAL COMPOSITE MATERIAL WALL PANELS

07.6200 SHEET METAL FLASHING AND TRIM

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Demolition of Existing Standing Seam roof as shown on pages A2.3A, and A2.3B.

a. Make area water sealed prior to installation of new standing seam roof system.

4. Include Dumpster services for Demo specified under this scope of work.

a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.

5. Furnish and Install all joint sealants for related work in this scope.

6. Furnish and Install complete roofing system as shown.

a. Standing Seam Metal Roofing System.

i. This includes all metal flashing and copings.

7. Furnish and Install ½” Cover Board with (2) layers of 2.6” Rigid Insulation underneath the Metal Roof

System.

a. Include Ice and Water Shield for this new system.

8. Furnish and Install any blocking as needed for this scope of work.

9. Daily clean-up at work areas.

10. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

11. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

12. Warranties as specified.

13. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

14. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 07 - MEMBRANE ROOFING

1. Complete Membrane Roofing as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.2100 THERMAL INSULATION

07.2500 WEATHER BARRIERS

07.5300 ELASTOMERIC MEMBRANE ROOFING

07.6200 SHEET METAL FLASHING & TRIM

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Demolition of existing Membrane roof and insulation as shown on page A2.3A, A2.3B, and A2.3C.

a. Demolition shall be performed so that there is no water damage to existing and new finishes inside the building. All work must remain watertight at the end of the day.

4. Include Dumpster services for Demo specified under this scope of work.

a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.

5. Furnish and install new membrane roof system as shown on page A2.3A, A2.3B, and A2.3C.

a. This includes all metal flashings and copings related to this work.

b. This includes flashing in all existing penetrations along with all new penetrations.

6. Furnish and Install ½” cover board with (2) layers of 2.6” Insulation fastened to the metal deck.

a. This includes the tapered insulation as shown on the drawings.

7. Furnish and Install new wood blocking as shown.

8. Furnish and Install all joint sealants for related work in this scope.

9. Daily clean-up at work areas.

10. Contractor to Meet Project Schedule, this includes weekend work or Daily overtime.

11. Furnish and install complete roofing system as shown.

12. Tie into the existing roofing system as necessary.

13. Provide all warranties as specified.

BID CATEGORY NO. 08 - ALUMINUM STOREFRONTS & GLAZING

1. Complete Aluminum Storefronts & Glazing as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.9200 JOINT SEALANTS

08.4313 ALUMINUM-FRAMED STOREFRONTS

08.7100 DOOR HARDWARE

08.8000 GLAZING

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install all Aluminum Frames and Doors as shown.

a. Including all Door Hardware related to this scope of work.

4. Furnish and Install all Glass and Glazing as shown.

5. Furnish and Install Mirrors as shown.

6. Furnish and Install all joint sealants for related work in this scope.

7. Glass cleaning at substantial completion of the entire project.

8. Furnish and install all storefront systems as shown and specified.

9. Contractor responsible for all field measurements for this scope of work.

10. Provide all hardware specified under this scope.

11. Furnish and install any break metal necessary to complete this scope.

12. Furnish and install egress stickers at all new egress openings.

13. Furnish and install all glazing films as shown.

14. Daily clean-up at work areas.

15. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

16. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

17. Warranties as specified.

18. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

19. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 09 - LPDA

1. Complete LPDA work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

05.4000 COLD-FORMED METAL FRAMING

07.8400 FIRESTOPPING

09.2116 GYPSUM BOARD ASSEMBLIES

09.2216 NON-STRUCTURAL METAL FRAMING

09.5100 ACOUSTICAL CEILINGS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Demo as called out for on Sheets A1.1A and A1.1B, note 5.

a. Areas to be taken down and reinstalled. This scope will be included in this bid category.

4. Furnish and Install all new metal studs as shown.

a. This includes cold form metal framing and non structural metal framing.

5. Engineered drawings required to be provided for cold form metal framing.

6. Furnish and Install all Gypsum boards as shown.

a. All Gypsum board must be finished as specified for painting.

7. Furnish and Install new Ceilings and Grid as shown on the drawings.

8. Furnish and Install new drywall bulkheads as shown.

9. Furnish and Install all batt insulation as shown on interior partitions as well as any exterior metal stud walls as shown.

10. Furnish and Install firestopping at all rated assemblies as shown on the drawing.

11. Coordinate layout and elevations with the Construction Manager prior to install.

12. Dust control measures for all work in this Bid Category.

13. Daily clean-up at work areas.

14. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

15. All work must be done in accordance with MIOSHA Regulations.

16. Warranties as specified.

17. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

18. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 10 - FLOORING

1. Complete Flooring work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.9200 JOINT SEALANTS

09.3000 TILING

09.6500 RESILIENT FLOORING

09.6813 TILE CARPETING

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Demo of Existing flooring and base as shown in note 10 on pages A1.1A, A1.1B, and A1.1C.

4. Include Dumpster services for Demo specified under this scope of work.

a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.

5. Furnish and Install new flooring as shown on the drawings.

a. This includes All Resilient Flooring (including base), Tile Carpeting, and Ceramic Tiling.

b. Responsible for monitoring and procuring methods for humidity control during the installation of the new flooring system.

6. Minor floor prep as needed.

7. Furnish and Install Entrance Floor Mats and Frames as shown.

8. Coordinate layout and elevations with the Construction Manager prior to install.

9. Dust control measures for all work in this Bid Category.

10. Daily clean-up at work areas.

11. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

12. All work must be done in accordance with MIOSHA Regulations.

13. Warranties as specified.

14. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

15. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 11 - PAINTING

1. Complete Painting work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.9200 JOINT SEALANTS

09.9000 PAINTING AND COATING

09.9113 EXTERIOR PAINTING

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install all painting as shown and specified in the Construction Documents for this project.

a. Includes but not limited to, Walls, Ceilings, Structural Steel, Misc. Steel, Door Frames, Doors.

4. Contractor responsible for final touch-up.

5. Fire barrier signage/ stenciling on fire walls within concealed space above ceiling per Barrier Free

Dimensions.

6. Dust control measures for all work in this Bid Category.

7. Daily clean-up at work areas.

8. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

9. All work must be done in accordance with MIOSHA Regulations.

10. Warranties as specified.

11. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

12. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 12 - FIRE PROTECTION

1. Complete Fire Protection work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.8400 FIRESTOPPING

21.0001 FIRE PROTECTION SUMMARY OF WORK

21.0500 COMMON WORK RESULTS FOR FIRE SUPPRESSION

21.1100 FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING (ADDENDUM 001)

21.1300 FIRE-SUPPRESSION SPRINKLER SYSTEMS (ADDENDUM 001)

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Temporary support Fire protection piping and heads in all areas as called out for on FP0.01 and FP0.02.

4. Reinstall into the new ceiling as required.

5. Include all sealed drawings for permitting and approvals.

6. Include all permits required for this scope of work. Provide the CM with a copy of the permit(s).

7. Include Fire Caulking/ Fire rating at all penetrations in fire rated assemblies created by this scope of work.

8. Include all tie ins and draining of the existing system as required to complete work.

9. It is the responsibility of this contractor to cut in all fire protection heads into the acoustical ceiling pads.

10. All work to be completed to meet industry standards.

11. Dust control measures for all work in this Bid Category.

12. Daily clean-up at work areas.

13. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

14. All work must be done in accordance with MIOSHA Regulations.

15. Warranties as specified.

16. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

17. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

18. Alternate No. FP-1: Waukazoo Elementary

a. Contractor shall provide all costs associated with the removal of existing heads and the provision/installation of concealed type heads (cover plate to be white color finish) in all layin and hard lid ceiling areas of the scope of work.

BID CATEGORY NO. 13 - MECHANICAL

1. Complete Mechanical work as shown on the drawings and as specified in the following categories:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.8400 FIRESTOPPING

07.9200 JOINT SEALANTS

22.0500 PLUMBING SUMMARY OF WORK

22.0513 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

22.0517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

22.0519 METERS AND GAUGES FOR PLUMBING PIPING

22.0523 GENERAL DUTY VALVES FOR PLUMBING PIPING

22.0529 HANGERS AND SUPPORTS PLUMBING PIPING AND EQUIPMENT

22.0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

22.0719 PLUMBING PIPING INSULATION

22.1005 PLUMBING PIPING

22.1006 PLUMBING PIPING SPECIALTIES

22.1123 DOMESTIC WATER PUMPS

22.3000 PLUMBING EQUIPMENT

22.4000 PLUMBING FIXTURES

23.0500 HVAC SUMMARY OF WORK

23.0513 COMMON MOTOR REQUIREMENTS FOR HVAC PIPING

23.0517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

23.0519 METERS AND GAGES FOR HVAC PIPING

23.0523 GENERAL-DUTY VALVES FOR HVAC PIPING

23.0529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23.0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23.0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23.0713 DUCT INSULATION

23.0719 HVAC PIPING INSULATION

23.0800 COMMISSIONING OF HVAC

23.0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23.0913.16 REFRIGERANT DETECTION AND ALARM

23.0923 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC

23.0934 VARIABLE-FREQUENCY MOTOR CONTROLLERS FOR HVAC

23.0993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

23.1123 FACILITY NATURAL-GAS PIPING

23.2113 HYDRONIC PIPING

23.2114 HYDRONIC PIPING SPECIALTIES

23.2123 HYDRONIC PUMPS

23.2300 REFRIGERANT PIPING

23.2500 HVAC WATER TREATMENT

23.3100 HVAC DUCTS AND CASINGS

23.3300 AIR DUCT ACCESSORIES

23.3423 HVAC POWER VENTILATORS

23.3700 AIR OUTLETS AND INLETS

23.4000 HVAC AIR CLEANING DEVICES

23.5100 BREECHINGS, CHIMNEYS, AND STACKS

23.6213 PACKAGED AIR-COOLED REFRIGERANT COMPRESSOR AND

CONDENSER UNITS

23.7313 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

23.7416 PACKAGED ROOFTOP AIR-CONDITIONING UNITS

23.8126.13 SMALL-CAPACITY SPLIT-SYSTEM AIR-CONDITIONERS

23.8200 TERMINAL HEATING AND COOLING UNITS

23.8216 AIR COILS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Plumbing and Mechanical Demo as shown on pages P1.1A, P1.1B, P1.1C, M1.1A, M1.1B, M1.1C.

4. Include Dumpster services for Demo specified under this scope of work.

a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.

5. Furnish and Install exterior louvers as shown.

6. Furnish and Install all plumbing and HVAC as specified and shown.

a. All equipment as specified.

b. Testing and Balancing as required.

c. Includes caulking/ joint sealants for the work completed in this bid category.

7. Applicable fees, permits, inspections, etc., as required for the completion of the work in this bid category.

8. Fire caulk any penetrations at rated assemblies.

9. Any coring through masonry or concrete to complete work in this scope must be included.

10. All DDC and Controls must be included as specified and shown.

11. Floor protection for any welding or soldering.

12. Dust control measures for all work in this Bid Category.

13. Daily clean-up at work areas.

14. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

15. All work must be done in accordance with MIOSHA Regulations.

16. Warranties as specified.

17. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

18. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 14 - ELECTRICAL

1. Complete Electrical work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.8400 FIRESTOPPING

26.0500 COMMON RESULTS FOR ELECTRICAL

26.0505 SELECTIVE DEMOLITION FOR ELECTRICAL

26.0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26.0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26.0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26.0533.13 CONDUIT FOR ELECTRICAL SYSTEMS

26.0533.16 BOXES FOR ELECTRICAL SYSTEMS

26.0533.23 SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS

26.0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26.0573 POWER SYSTEM STUDIES

26.0583 WIRING CONNECTIONS

26.0943 NETWORK LIGHTING CONTROLS

26.2200 LOW-VOLTAGE TRANSFORMERS

26.2416 PANELBOARDS

26.2713 POWER AND ENERGY METERS

26.2726 WIRING DEVICES

26.2813 FUSES

26.2816.16 ENCLOSED SWITCHES

26.2913 ENCLOSED CONTROLLERS

26.3213 ENGINE GENERATORS

26.3600 TRANSFER SWITCHES

26.4300 SURGE PROTECTIVE DEVICES

26.5100 INTERIOR LIGHTING

26.5600 EXTERIOR LIGHTING

27.0505 SELECTIVE DEMOLITION FOR COMMUNICATION

27.0526 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

27.0529 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS

27.0533.13 CONDUIT FOR COMMUNICATIONS SYSTEMS

27.1000 STRUCTURED CABLING

27.5116 PUBLIC ADDRESS SYSTEMS

27.5313 CLOCK SYSTEMS

28.0505 SELECTIVE ELECTRONIC SAFETY AND SECURITY DEMOLITION

28.1300 INTEGRATED ACCESS CONTROLS, VIDEO SURVEILLANCE, INTRUSION

AND THREAT LEVEL MANAGEMENT SYSTEM

28.4600 FIRE DETECTION AND ALARM

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Electrical Demo as shown on pages E1.1A, E.1.1B, and E1.1C.