This is Construction Bid Addendum No. 2 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for the Chippewa Correctional Facility Sanitary Sewer Upgrade project (File Number 472/26156.MDL). The addendum, issued on October 28, 2026, provides clarifications and modifications to the bidding documents for this sanitary sewer infrastructure project. The bid opening date is November 4, 2026, and the substantial completion date is Friday, January 7, 2028. The professional managing the project is Matrix Consulting Engineers, with Mike Lusk serving as Project Director. Key project elements include installation of a 10-degree bar screen with an 8' x 4' pit opening, a 6-inch force main from the lift station discharge, screening equipment with a channel depth of 13.34 feet from slab to bottom, and a temporary bypass-pumping system connecting to an existing upstream manhole within the secured area.

The addendum contains ten clarification items addressing contractor responsibilities, technical specifications, and construction sequencing. Notable clarifications include: the general contractor's discretion in distributing scope of work among subcontractors; Class 1, Division 1 listing requirements for all control devices in the Bar Screen room; confirmation that a conveyor is not required and a discharge chute will be utilized; specification that only temporary bypass-pumping connection work is anticipated within the secured area; and documentation that the downstream peak flow elevation and average flow depth are identified on the Duperon detail. Re-issued sheets C-002 and C-003 are attached to the addendum. All bidders must acknowledge receipt of this addendum in the Bid Summary and Bid Form, as failure to do so may result in bid rejection. The addendum becomes part of the Contract Documents upon issuance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 2

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

10/28/2026

PROJECT NAME

Chippewa Correctional Facility – Sanitary Sewer Upgrade

FILE NUMBER

472/26156.MDL

PROFESSIONAL

Matrix Consulting Engineers

PROJECT DIRECTOR

Mike Lusk

BID OPENING DATE:

11/4/2026

ADDENDUM ITEMS:

1. Re-issued sheets C-002 and C-003 (attached).

2. Clarification: It is up to the General Contractor on how the scope of work is broken down between subcontractors. It is up to the General Contractor to ensure the entire scope of work is included in the bid package for a completed project.

3. Clarification: All control devices (including sensors, thermostats, switches, actuators, junction boxes and associated fittings) located in the Bar Screen room are to be Class 1, Division 1 listed.

4. Clarification: Pit opening for screening equipment to be 8’ x 4’ as shown on A101.

5. Clarification: Based on current understanding, the only anticipated work within the secured area is the temporary bypass-pumping connection. The plans identify the existing manhole within the secured area as the proposed upstream connection point for the bypass system.

6. Clarification: The plans and specifications identify the contractor’s bypass-pumping and shutdown responsibilities. In general, the anticipated approach is to connect the temporary bypass system to the upstream manhole referenced in Item 2, route the temporary piping across the perimeter road using an appropriate temporary pipe-crossing ramp or protection system, and continue the piping to the existing lift station. This arrangement would allow the existing manual screen to be fully bypassed during the work. Final means, methods, sequencing, and temporary bypass-system design remain the contractor’s responsibility, subject to the requirements of the Contract Documents.

7. Clarification: The construction documents were updated to identify the lift station discharge as a 6-inch force main.

8. Clarification: Bar Screen is to be 10 degrees from vertical.

9. Clarification: Downstream peak flow elevation is shown on Duperon detail on sheet C-003. The average flow is approximately 3” in depth.

10. Clarification: A conveyor is not required; discharge chute to be utilized as shown on construction documents.

11. Clarification: The channel depth is shown on C-003 of the construction docuements, at 13.34’ from slab to bottom of channel.

12. Clarification: Substantial Completion is Friday January 7th, 2028.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Troy Thelen, Matrix DATE: 10/28/2026

APPROVED BY:

PROJECT DIRECTOR: Mike Lusk

DATE: 10/28/2026

BENCHMARK

CAUTION!!

CAUTION!!

CAUTION!!

M-80

E1

E2

PAVING LEGEND

LEGEND

NF

N

Site

Location Map

PROJECT RESTORATION

GPR INVESTIGATION NOTE

SANITARY BY-PASS

SAN. MANHOLE SCHEDULE

1E1

E2 2

N F

E N

G I N

E E

R S

C i v i l

E n g i n e e r s

L a n d

S u r v e y o r s

L a n d

P l a n n e r s

W o o d w a r d A v e n u e

P o n t i a c M

I

T e l (2

F a x (2

N F

E P

R O

J E

C T

N O

N

N

F E

P R

O J E

C T

N O

N

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

IMPROVEMENT

PLANS, DETAILS

AND SESC

C-002

NF

N

EW

S

SCALE 1" = 20'TRENCH DETAIL D

SEWER UNDER ROADBED

OR WITHIN INFLUENCE OF ROADBED SILT FENCE DETAIL

SECTION A-A

FRONT VIEW

PLAN VIEW

SECTION B-B

STANDARD SANITARY MANHOLE DETAIL GUARD POST DETAIL

NOTES

SOIL EROSION NOTE

SOIL CONDITIONS

SOIL EROSION CONTROL

CONCRETE PAVEMENT SECTION

CONSTRUCTION SEQUENCE TIMING CHART

SILT SACK FILTER DETAIL

BAG DETAIL

INSTALLATION DETAIL

ASPHALT PAVEMENT SECTION

PERIMETER ROAD CLOSURE NOTE

EXISTING SHED REMOVAL NOTE

SHORING AND DEWATERING NOTE

N F

E N

G I N

E E

R S

C i v i l

E n g i n e e r s

L a n d

S u r v e y o r s

L a n d

P l a n n e r s

W o o d w a r d A v e n u e

P o n t i a c M

I

T e l (2

F a x (2

N F

E P

R O

J E

C T

N O

N

N

F E

P R

O J E

C T

N O

N

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

CONCRETE PIT /

SCREENING

EQUIPMENT

DETAILS

C-003

File details come from the government source that posted it. Updated .