Addendum 2 26148.pdf

PDF 124 KB Posted

Attached to
751/26148. KMM - Holly SRA - Thread Creek Dam Study
Solicitation number
RFP 171 260000001797 3
Issued by
Oakland County, Michigan

About this file

This is Addendum No. 2 to a Request for Proposal issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Holly State Recreation Area Thread Creek Dam Study (Project File Number 751/26148.KMM). The addendum, issued on May 8, 2026, provides clarifications and additional information to the original RFP. In response to a proposer inquiry regarding as-built drawings of the dam, the Project Director confirmed that only limited information, sketches, and drawings are available, which are provided as attachments (identified as "2497 Info"). The proposal due date remains unchanged at May 21, 2026. Project Director Kurt Maiberger approved the addendum on May 8, 2026.

No pricing terms, set asides, contract duration, or funding information is specified in this addendum document. The addendum serves primarily as a clarification mechanism to address proposer questions and distribute supplementary project documentation through the SIGMA Vendor VSS system. Interested proposers should reference the original RFP and all previous addenda, along with the attached supporting materials, when preparing their responses.

View the file

Other files

File Type Posted
2497 Info.pdf PDF
SAMPLE Billable Rate Contract (Rev 04-25).pdf PDF
2024 Inspection Report 2497.pdf PDF
Billable Rate 26148.pdf PDF
Addendum 1 26148.pdf PDF
Project Statement 26148.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 2/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL

ADDENDUM NO. 2

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.

Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

5/8/2026

PROJECT NAME

Holly State Recreation Area Thread Creek Dam Study

FILE NUMBER

751/26148.KMM

PROJECT DIRECTOR

Kurt Maiberger

PROPOSAL DUE DATE:

5/21/2026

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

Please note the following RFI answers:

Q1) Are there any as-built drawings of the dam?

A1) All that can be found are some info/sketches/drawings that are attached separately.

Please note the following additional files attached separately:

- 2497 Info

The proposal due date remains unchanged.

APPROVED BY:

PROJECT DIRECTOR Kurt Maiberger DATE: 5/8/2026 http://www.buy4michigan.com/

File details come from the government source that posted it. Updated .