Addendum 2 26148.pdf
PDF 124 KB Posted
- Solicitation number
- RFP 171 260000001797 3
- Issued by
- Oakland County, Michigan
About this file
This is Addendum No. 2 to a Request for Proposal issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Holly State Recreation Area Thread Creek Dam Study (Project File Number 751/26148.KMM). The addendum, issued on May 8, 2026, provides clarifications and additional information to the original RFP. In response to a proposer inquiry regarding as-built drawings of the dam, the Project Director confirmed that only limited information, sketches, and drawings are available, which are provided as attachments (identified as "2497 Info"). The proposal due date remains unchanged at May 21, 2026. Project Director Kurt Maiberger approved the addendum on May 8, 2026.
No pricing terms, set asides, contract duration, or funding information is specified in this addendum document. The addendum serves primarily as a clarification mechanism to address proposer questions and distribute supplementary project documentation through the SIGMA Vendor VSS system. Interested proposers should reference the original RFP and all previous addenda, along with the attached supporting materials, when preparing their responses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2497 Info.pdf | ||
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| 2024 Inspection Report 2497.pdf | ||
| Billable Rate 26148.pdf | ||
| Addendum 1 26148.pdf | ||
| Project Statement 26148.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 2
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
5/8/2026
PROJECT NAME
Holly State Recreation Area Thread Creek Dam Study
FILE NUMBER
751/26148.KMM
PROJECT DIRECTOR
Kurt Maiberger
PROPOSAL DUE DATE:
5/21/2026
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Please note the following RFI answers:
Q1) Are there any as-built drawings of the dam?
A1) All that can be found are some info/sketches/drawings that are attached separately.
Please note the following additional files attached separately:
- 2497 Info
The proposal due date remains unchanged.
APPROVED BY:
PROJECT DIRECTOR Kurt Maiberger DATE: 5/8/2026 http://www.buy4michigan.com/
File details come from the government source that posted it. Updated .