This is Addendum #2 to a Locker Replacement RFP issued by Pellston Schools in Michigan. The addendum clarifies that the bid deadline remains unchanged at Tuesday, October 20, 2026 at 2:30 pm in the Office of the Superintendent. Prospective bidders must review all drawings and specifications included in RFP section #4 Scope of Services and this addendum. Requests for information (RFIs) must be submitted no later than October 16, 2026 by 5:00 pm. Any questions arising after this date require bidders to clarify their bid submission or provide a voluntary alternate to enable equal review by the owner.
The addendum provides critical clarifications regarding locker quantities and specifications. Contractors should base their bids on 413 lockers as the base bid, with pricing provided for any additional lockers that may be required beyond this quantity. ADA-accessible lockers must be included within the 413 base lockers and scattered throughout the facility layout in compliance with state building accessibility requirements, with final layout to be reviewed with the district representative. Bidders should reference Addendum #1 regarding locker locking specifications and are instructed to provide separate pricing for new base trim as an alternate bid item. Lockers Manufacturing is identified as an approved vendor. The architect of record is dlp designs, located in Pinconning, Michigan, and can be contacted by phone, cell, or email for additional project information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum #1 (2).pdf | ||
| Pellston Locker RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #2:
Bid date and time remains unchanged Bids are due on Tuesday, Oc-tober 20, 2026 at 2:30 pm in the Office of the Superintendent.
Prospective bidders are required to review ALL drawings and specifi-cations and include all work as designated in your work scope. Spe-cial attention to RFP section #4 Scope of Services and this adden-dum.
RFI’s must be submitted no later than October 16, 2026 by the end of the business day (5:00 PM). If questions arise after this date, you must clarify your bid and/or supply a voluntary alternate so the owner can equally review and address all bids received.
Clarifications:
1) Addendum #1 specified that contractors were to figure 413 lockers. A further walk through indicated 416. Please use 413 in your base bid and provide an extra for any additional lockers that may be required. Include ADA/Accessibility lock-ers in the 413 originally required.
ADA accessible lockers shall be included per the state build-ing accessibility requirements and should be scattered throughout the locker layout. This layout should be reviewed with the the district representative. Locker locking shall be as specified.
Please provide pricing for new base trim as an alternate.
Lockers Manufacturing are an approved vendor.
A D D E N D U M # 2
Project:
Pellston Schools 2026 Locker Replacement Project dlp designs 4521 n. saginaw bay shore drive pinconning, michigan 48650
Phone: 989.598.1390 Cell: 989.598.5035 Email: dlpdesignsaia@gmail.com
Daniel J La Pan, AIA