This document is an Addendum to the Bidding Documents for the North Higgins Lake State Park - TS Building project, issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division. The Addendum provides clarifications and responses to bidder questions, including confirming that there is no camper pad deductive alternate, that the roof shall be 24-gauge steel pre-clad snap seam roofing, and that #5 - 5/8" rebar is required in the footings. The Addendum also indicates that the Owner will pay for special inspections, and that Firestone Standing Seam roofing may be allowed if it meets the specification requirements. The bid opening date is April 6, 2022.
The related state and local contract opportunity is for the North Higgins Lake State Park Toilet Shower Building project, located in Roscommon County, Michigan. The bid attachments must be uploaded to the SIGMA VSS system, and questions should be emailed to the Project Director. COVID-19 precautions may be required, such as wearing masks, and bidders should check for any updated guidance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
3/30/2022
PROJECT NAME
N. Higgins Lake State Park – TS Building
FILE NUMBER
19104.BDW
PROFESSIONAL
NFE Engineers
PROJECT DIRECTOR
Bruce Watkins
BID OPENING DATE:
4/6/2022
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Alternate clarification: Plan sheet C3 notes a camper pad deductive alternate. This note should be considered void. There is no camper pad alternate.
2. Bidder Questions are attached with responses
• Who pays for special inspections on S401?
Ans) Owner will pay for these inspections
• Does the project include a aluminum roof?
Ans) Roof shall be 24-guage steel – pre-clad snap seam roofing
• What size rebar in footings?
• Ans) #5 – 5/8” rebar require
• Can Firestone Standing Seam be used for the roof panels?
Ans) Design team is not familiar with Firestone, but if they provide a snap seam metal roofing that meets the requirements in the specifications they would be allowed for use
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
Steve Sutton
PROFESSIONAL: DATE: 3/30/2022
APPROVED BY:
PROJECT DIRECTOR: Bruce Watkins DATE: 3/30/2022