Addendum 1~1.pdf
PDF 171 KB Posted
- Attached to
- Sole Source - Bio-Mark Pit Tags
- Solicitation number
- S-63500-00001315
- Issued by
- Deschutes County, Oregon
About this file
This is Addendum #1 to an Invitation to Bid (ITB) issued by Rogue Community College District for construction services related to Building K Renovation at the Redwood Campus. The addendum provides clarifications and answers to contractor questions regarding finish materials and specifications that were not included in the original bid documents. The bid deadline was Wednesday, December 15, 2021, at 2:00 pm PST, with sealed bids to be opened publicly at the Contract and Procurement Office located at 3345 Redwood Hwy, Grants Pass, Oregon. All contractors were required to acknowledge receipt of this addendum on the Proposers Certification and Offer Form in Section 00380. The contact for the procurement was Jodie L Fulton, Contract and Procurement Manager, at 541-956-7200 or jfulton@roguecc.edu.
The addendum included specific finish selections for the Building K renovation project, prepared by KSW Architects as Information Bulletin No. 1, dated December 10, 2021. The finish specifications detailed in the bulletin included cabinet casework using Formica Graystone plastic laminate with matte finish, Forbo Marmoleum Concrete resilient flooring in Liquid Clay color, Roppe Pinnacle rubber base in Creekbed color, Formica countertops in Graystone with matte finish, Sherwin Williams wall and trim paint in Snowfall color, and Sherwin Williams ceiling paint in Highly Reflective White. These specifications covered all locations within the renovation project and referenced specific CSI sections (064100, 096500, 123600, and 09913) for material applications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sole Source Determination_Biomark_PIT_Tags.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #1
RFP P17926-2021-12-15 – Construction Services –Building K Renovation
Invitation to Bid (ITB) No. P17926-2021-12-15
Construction Services – Rogue Community College District, Building K Renovation Redwood Campus
Bid Due: Not later than Wednesday December 15, 2021 at 2:00 pm PST, in the Contract and Procurement Office of Rogue Community College located at 3345 Redwood Hwy, Grants Pass, Oregon, at which time they will be publically opened.
Remember to acknowledge all addenda on the Proposers Certification and Offer Form (Section 00380)
Issuing Office: Rogue Community College Contact Name: Jodie L Fulton Contract and Procurement Office Title: Contract and Procurement Manager Josephine Building Phone: 541-956-7200 3345 Redwood Hwy Grants Pass, Oregon 97527 Email: jfulton@roguecc.edu file://mars/AdminSvcs/Purchasing%20-%20Jodie%20and%20Sheri/Jodie%20Fulton/RFP-RFQ/2016%20Capital%20Projects%20(Bond)/High%20Technology%20Center/Contractor%20RFQ-RFP/RFP/Working%20file/jfulton@roguecc.edu
RFP P17926-2021-12-15 – Construction Services –Building K Renovation
1. This addendum is prepared to provide clarifications and answers to the following questions:
a. The finish schedule on A11.1 and the casework spec does not include anything about the casework finishes and the spec 090000 Finish Material Schedule is not included.
Can that be provided?
Please reference the attached INFORMATION BULLETIN NO.1 as provided by KSW Architects.
Date: 12/10/2021 Project Title: Building K Owner: Rogue Community College KSW Project No: 20-024
INFORMATION BULLETIN NO. 1
Finish Selections:
1. Cabinet Exposed Open Plastic Laminate Casework Section 064100– All locations
a. Product; Formica
b. Color; 464-58 Graystone
c. Finish; Matte
2. Resilient Flooring Section 096500– All locations.
a. Product; Forbo Marmoleum Concrete
b. Color; 3702 Liquid Clay
3. Rubber Base Section 096500 – All locations.
a. Product; Roppe Pinnacle
b. Color; 640 Creekbed
4. Countertops Section 123600 – All locations.
a. Product; Formica
b. Color; 464-58 Graystone
c. Finish; Matte
5. Wall and Trim Paint Section 09913 – All locations.
a. Product; Sherwin Williams; approved substitute for specified manufacturers
b. Color; SW 6000 Snowfall
c. Sheen; As specified
6. Ceiling Paint Section 09913 – All locations.
a. Product; Sherwin Williams; approved substitute for specified manufacturers
b. Color; SW 7756 Highly Reflective White
c. Sheen; As specified
| Addendum 1 |
| Addendum 1 Attachment |
File details come from the government source that posted it. Updated .