This document is an Addendum (Addendum No. 001) for a construction project by West Ottawa Public Schools involving improvements at Waukazoo Elementary and electrical improvements at Sheldon Woods Elementary. The project is located in Holland and West Olive, Michigan, with a pre-bid walk-through scheduled for October 8, 2025 at 4:15 P.M. Bids are due on October 21, 2025 at 10:00 A.M., with mandatory post-bid interviews from October 27-29, 2025. The construction is planned to begin on December 20, 2025 during Christmas Break, with substantial completion targeted for August 7, 2026. The project will involve multiple bid categories including sitework, concrete, masonry, metals, general trades, roofing, aluminum storefronts, fire protection, mechanical, and electrical improvements.
The addendum includes two specific alternates: Alternate A-1 involves replacing small group room accordion doors with high-performing acoustic accordion doors, and Alternate FP-1 involves removing existing sprinkler heads and installing concealed type heads with white cover plates in lay-in and hard lid ceiling areas. The project is not a prevailing wage project and requires bidders to submit a 5% bid bond, sworn familial disclosure, and Iran disclosure act documentation. Bidders must have at least 10 years of experience, be licensed and insured in Michigan, and have financial resources to complete the work. The construction manager is Fritz Wahlfield Construction, and the architect/engineer is GMB Architecture + Engineering.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Invite_Front_Ends.pdf | ||
| Waukazoo Drawings.pdf | ||
| Waukazoo Project Schedule Gantt Chart.pdf | ||
| Sheldon Woods Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 10/10/2025
Owner: West Ottawa Public Schools
Project Name: Waukazoo Elementary Improvements & Sheldon Woods Elementary Electrical Improvements
Location: 1294 W Lakewood Blvd., Holland, MI 49424 15050 Blair St, West Olive, MI 49460
CM No.: 357-025
A/E No.: 5-6255 & 5-6249
ADDENDUM NO. 01
SPECIAL NOTE:
The Notice to Bidders, Instruction to Bidders, General Conditions of the Contract Construction, Supplementary
Conditions of the Contract for Construction, and all modifications and previously issued Contract Documentation are a part of the Addendum.
SCOPE OF WORK:
The following items are changes, additions, deletions, clarifications and/or errors and omissions in the plans and specifications and shall be considered by each Bidder regarding their proposal submitted. This document and all its entirety shall be considered part of the Contract Documents.
NOTICE TO ALL BIDDERS:
It is the responsibility of the Bidder to take note of all items covered in this Addendum. It is the responsibility of the
Bidder to review all documentations in total regarding their scope of work and any work that will interface with their scope of work.
ATTACHMENTS:
Specifications: GMB Addendum 001
Drawings: GMB Addendum 001
Other: Front Ends Pre-Bid Walk-Thru Minutes & Attendance
WEST OTTAWA PUBLIC SCHOOLS
Waukazoo Elementary Improvements & Sheldon Woods Elementary Electrical Improvements
ADDENDUM
WEST OTTAWA PUBLIC SCHOOLS ADDENDUM 001
5-6249 WO WAUKAZOO ELEMENTARY IMPROVEMENTS & SHELDON
WOODS ELEMENTARY ELECTRICAL IMPROVEMENTS OCTOBER 09, 2025
A/E PROJECT 5-6249 & 5-6255 PAGE 1 OF4
SECTION 00 91 11.01 - ADDENDUM 001
OWNER WEST OTTAWA PUBLIC SCHOOLS
PROJECT
5-6249 WO WAUKAZOO ELEMENTARY
IMPROVEMENTS & SHELDON WOODS
ELEMENTARY ELECTRICAL IMPROVEMENTS
A/E PROJECT 5-6249 & 5-6255
PURPOSE THIS ADDENDUM SHALL FORM PART OF THE
BIDDING DOCUMENTS. CHANGES, ADDITIONS,
CLARIFICATION OR DELETIONS HEREIN
SUPERSEDE THE DRAWINGS AND
SPECIFICATIONS. BIDDERS SHALL INCLUDE
ON THE PROPOSAL FORM
ACKNOWLEDGEMENT OF THE RECEIPT OF
THIS ADDENDUM.
ATTACHMENTS
NEW SPECIFICATIONS: 21 11 00, 21 13 00
REISSUED SPECIFICATIONS: TOC, 06 10 00, 01
23 00, 21 00 01
NEW SHEETS: 5-6249: G1.01
NEW SHEETS: 5-6255
REISSUED SHEETS 5-6249: G0.00, G0.01,
FP0.01, P2.1C, E2.1B, E3.1C, E5.10
REISSUED SHEETS 5-6255: G0.00, E2.1A
SHEETS TO ISSUE TO THE BFS 5-6249: FP0.01
SHEETS TO ISSUE TO THE BFS 5-6255:
ARCHITECT-ENGINEER GMB
616.796.0200
WWW.GMB.COM
5-6249 WO WAUKAZOO ELEMENTARY IMPROVEMENTS & SHELDON
WOODS ELEMENTARY ELECTRICAL IMPROVEMENTS OCTOBER 09, 2025
A/E PROJECT 5-6249 & 5-6255 PAGE 2 OF4
CONSTRUCTION MANAGER FRITZ WAHLFIELD CONSTRUCTION
616.784.5833
WWW.WAHLFIELDCONSTRUCTION.COM
5-6249 WO WAUKAZOO ELEMENTARY IMPROVEMENTS & SHELDON
WOODS ELEMENTARY ELECTRICAL IMPROVEMENTS OCTOBER 09, 2025
A/E PROJECT 5-6249 & 5-6255 PAGE 3 OF4
SPECIFICATION CLARIFICATIONS / REVISIONS
1.1 TABLE OF CONTENTS - TOC (REISSUED)
A. Revised Table of Contents for added sections.
1.2 SECTION 01 23 00 - ALTERNATES (REISSUED)
A. Refer to Paragraph 1.3.B: Alternate FP-1 shall be added to the scope of work as noted in reissued section.
1.3 SECTION 06 10 00 - ROUGH CARPENTRY (REISSUED)
A. See General Requirements in Part 2 for Fire Retardant Treated sheathing requirements.
1.4 SECTION 21 00 01 - FIRE PROTECTION SUMMARY OF WORK (REISSUED)
A. Refer to Paragraph 3.1.B.1: Alternate FP-1 shall be added to the scope of work as noted in reissued section.
1.5 SECTION 21 11 00 - FACILITY FIRE SUPPRESSION WATER SERVICE PIPING (NEW)
A. Section 21 11 00 shall be be added to the scope of work in its entirety.
1.6 SECTION 21 13 00 - FIRE SUPPRESSION SPRINKER SYSTEM (NEW)
A. Section 21 13 00 shall be be added to the scope of work in its entirety.
SHEET CLARIFICATIONS / REVISIONS (5-6249 WAUKAZOO ELEMENTARY IMPROVEMENTS)
2.1 SHEET G0.01 - GENERAL NOTES DIMENSIONS AND LEGENDS (REISSUED)
A. See General Floor Plan Note #11 for revised Michigan Building Code year.
2.2 SHEET FP0.01 - OVERALL FIRE PROTECTION PLAN GENERAL INFORMATION AND
DETAILS (REISSUED)
A. Alternate FP-1: Contractor shall provide all costs associated with the removal of existing heads and the provision/installation of concealed type heads (cover plate to be white color finish) in all layin and hard lid ceiling areas of the scope of work.
B. Contractor shall revise existing riser as required for the provision and installation of double check detector assembly as noted in Keynote 01 as shown on reissued sheet.
2.3 SHEET P2.1C - UNIT 'C' PLUMBING PLAN (REISSUED)
A. Fixture tag shall be added to water closet, WC-1E locations as shown on reissued sheet.
2.4 SHEET E2.1B - UNIT 'B' FIRST FLOOR POWER & COMMUNICATIONS PLAN (REISSUED)
A. Added additional plumbing fixture power supply connection in Kitchen B133.
2.5 SHEET E3.1C - UNIT 'C' FIRST FLOOR LIGHTING PLAN (REISSUED)
A. Revised circuiting for existing light fixuture outside Vestibule C117.
B. Revised location of light fixture in Corridor C151.
2.6 SHEET E5.10 - LIGHTING FIXTURE SCHEDULE (REISSUED)
A. Revised lighting fixture schedule for inclusion of additional fixture equivalents.
SHEET CLARIFICATIONS / REVISIONS (5-6255 SHELDON WOODS ELECTRICAL IMPROVEMENTS)
3.1 SHEET G0.00 - COVER SHEET (REISSUED)
A. See new General Information sheet list.
5-6249 WO WAUKAZOO ELEMENTARY IMPROVEMENTS & SHELDON
WOODS ELEMENTARY ELECTRICAL IMPROVEMENTS OCTOBER 09, 2025
A/E PROJECT 5-6249 & 5-6255 PAGE 4 OF4
B. See new Code References Legend.
3.2 SHEET G1.01 - CODE PLAN - LIFE SAFETY PLAN (NEW)
A. New sheet.
3.3 SHEET E2.1A - UNIT 'A' ELECTRICAL PLANS (REISSUED)
A. Revised lighting fixture schedule for inclusion of additional fixture equivalents.
SPECIFICATIONS CLARIFICATIONS / REVISIONS:
(Refer to A/E Remarks)
SHEET CLARIFICATIONS / REVISIONS:
(Refer to A/E Remarks)
OTHER:
ITEM NO. 1: FRONT ENDS (ALL CHANGES NOTED IN RED/YELLOW)
Refer to scope of work changes noted in this Addendum which includes an added alternate for Fire Protection, and other clarifying items to the following Bid Category’s scope of work:
General Trades, Fire Protection
ITEM NO. 2: PRE-BID WALK-THRU MINUTES & ATTENDANCE
Pre-Bid walk through minutes and attendance are included in this Addendum.
Looks Good
Waukazoo Elementary Improvements & Sheldon Woods Elementary Electrical Improvements
00 11 13 ADVERTISEMENT FOR BIDS
BID PROPOSAL
Sealed bids, in triplicate, for West Ottawa Public Schools, Waukazoo Elementary Improvements & Sheldon Woods
Elementary Electrical Improvements, will be received at West Ottawa Public Schools Administration Office, 1138 th Ave., Holland, MI 49424 on October 21, 2025 at 10:00 A.M. Any bids received after this date and time will not be accepted or considered. All bids will be opened and read publicly. FAXED OR EMAILED BIDS WILL NOT BE
ACCEPTED.
This project is not a prevailing wage project.
All bids must be accompanied by the following;
1. 5% Bid Bond/ Security
2. Sworn and Notarized Familial Disclosure
3. Iran Disclosure Act
SITE INSPECTION
A Pre-bid meeting will be Wednesday, October 8 @ 4:15 P.M. This meeting will take place at Waukazoo Elementary
School located at 1294 W Lakewood Blvd, Holland, MI 49424. This pre-bid walk thru is highly recommended. There will be no other time available to view the site.
BID DOCUMENTS
Bidding documents may be viewed and/or requested via the following:
GMB Architecture + Engineering 85 East Eighth St., Suite 200 Holland, MI 49423 Ph: (616) 796-0200
West Michigan Builders Exchange
678 Front St. NW, Grand Rapids, MI 49504
(616) 949-8650
Please note that vendors are responsible to review information on all drawings and specifications.
BIDDER QUALIFICATIONS
Bidders submitting a proposal for this project shall have the following qualifications:
1. At least (10) years’ experience under the current company’s name.
2. Licensed and insured to perform work in the State of Michigan.
3. Shall have financial resources to complete work under this scope
BID SECURITY
All bids are required to have a bid security or bid bond in the amount of 5% of the bid being submitted. This shall secure the Owner from loss or damage by reason in the occurrence a bid is withdrawn or failure of the successful bidder not entering into Contract with the Owner if the Bid is accepted by the Owner.
The Successful bidder will be asked to secure a Performance, Labor, and Material bond for all work under contract.
Please keep this cost separate on the bid form provided. All bonds shall be from a surety company with an ‘A’ rating.
00 41 00 BID FORM
SUBMIT IN TRIPLICATE
BID TO: West Ottawa Public Schools 1138 136 th Ave.
Holland, MI 49424
ATTENTION: Mr. Chris LaHaie, Assistant Superintendent of Business Services
BID FROM: _______________________________________________________
PROJECT: Waukazoo Elementary Improvements & Sheldon Woods Elementary Electrical Improvements
The undersigned has familiarized themselves with the local conditions with the cost of the work by having examined the site conditions, and Bidding Documents prepared by GMB Architecture & Engineering (85 East Eighth St. (Suite
200), Holland, MI 49423), and hereby proposes to furnish all labor, materials, taxes, equipment, and services needed for the completion of the work category submitted. All Addendums that have been issued for this project have been recognized and included. The cost for performing work is:
Bid Category Number: _________________
Bid Category Description: ____________________________________________________________
Base Bid Amount: ____________________________________________________________ Dollars
ALLOWANCES: Base Bid includes all allowance cost(s) set forth in Section 01.2100 of the General Requirements and identified in the Instruction to Bidders.
TAXES: Base Bid includes all applicable taxes, including Michigan Sales Tax.
COST OF BONDS: Bond Cost for Performance, Labor, and Material Bond Cost. This cost must be included in the
Base Bid. Please list the cost of the bond below.
Waukazoo Elementary Improvements & Sheldon Woods Elementary Electrical Improvements:
PLM Bond Amount ____________________________________________________________ Dollars
ACKNOWLEDGEMENT OF ADDENDA
The following addenda have been received and acknowledged with their execution is included in the base bid cost:
Addendum No. _____ Dated __________ Addendum No. _____ Dated __________
Addendum No. _____ Dated __________ Addendum No. _____ Dated __________
ALTERNATES (MANDATORY TO PROVIDE PRICING AS NEEDED WITH BASE BID)
The following alternates are an add to the Base Bid Cost.
Alternate No. A-1: Waukazoo Elementary
1. Provide all costs associated with replacing the small group room accordion doors, as indicated on plan, with high performing acoustic accordion doors.
Cost: Add/ Delete $___________________________________
Alternate No. FP-1: Waukazoo Elementary
1. Contractor shall provide all costs associated with the removal of existing heads and the provision/installation of concealed type heads (cover plate to be white color finish) in all layin and hard lid ceiling areas of the scope of work.
VOLUNTARY ALTERNATES
The following is a list of Voluntary Alternates. The owner reserves the right to accept or reject and voluntary alternates.
1. ______________________________________________________________________________
2. ______________________________________________________________________________
UNIT PRICE
1. Unit Price No. 1: NA
BID BOND
Accompanying this bid as required by the instructions to Bidders, is a bid security if the form of (Certified Check, Cashier’s Check, or Bid Bond) in the amount of:
Bid Bond Amount ____________________________________________________________ Dollars
CONSTRUCTION SCHEDULE
The undersigned acknowledges the construction schedule set in the bid documents and that they must be met.
ADDITIONAL WORK
1. There will be a fee of 10% applied to the total cost of materials purchased and work completed by a contractor's own forces. This includes both overhead and profit.
2. There will be a fee of 5% applied to the total cost of work completed by a subcontractor. This includes both overhead and profit.
CREDIT FOR WORK DELETED FROM CONTRACT
All work deleted from this contract by the Owner should be credited 100% back to the Owner.
AGREEMENT
In submitting this bid, it is understood that the Owner reserves the right to accept or reject any/all bids for any reason.
This bid is valid 60 days from the date of the opening.
Firm: _______________________________________________________________
Date: __________________
By: _____________________________________________________
Signature: ________________________________________________________
Title: ______________________________
Phone: (_______) _____________________
Email: ______________________________________________________
CONTACT INFORMATION
Please list contact information for the person(s) that should receive communication regarding THIS submitted bid, including Post-Bid Invites. (If Additional contacts should also receive communication, please attach a separate sheet listing a Name, Title, Email and Phone Number for each contact)
Name: ___________________________________________________
Title: ____________________________________________________
Email: ___________________________________________________
Phone: (________) ____________________________
FAMILIAL DISCLOSURE STATEMENT
In accordance with Section 1267 of the Revised School Code this bid must be accompanied by a sworn and notarized statement disclosing the familial relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West Ottawa Public Schools.
(_____) No, there is no relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West Ottawa Public Schools.
(_____) Yes, there is a relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West Ottawa Public Schools. Please list the relationship below.
BIDDER BOARD OF EDUCATION MEMBER OR SUPERINTENDENT
Subscribed and sworn this _______________________ day of ___________________________________, 2025.
In the County of ______________________________ In the State of ___________________________________.
By ___________________________________________________________________________
Notary Public Signature
My Commission Expires on: ________________________________ Seal or Stamp:
AFFIDAVIT OF COMPLIANCE IRAN ECONOMICS SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner, or authorized officer of the below-named company (the “Contractor”), pursuant to the compliance certification requirement provided in West Ottawa Public Schools Request for Proposal (the “RFP”), hereby certifies, represents, and warrants that the Contractor (which includes its officers, directors and employees) is not an “Iran Linked Business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of
2012 (the “Act”), and that in the event the Contractor is awarded a contract by the West Ottawa Public Schools as a result of the aforementioned RFP, the Contractor is not and will not become an “Iran Linked Business” at any time during the course of performing any services under the Contract.
The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or two (2) times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School Districts investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date that it is determined that the person has submitted the false certification.
Contractor: _____________________________________________________
By: _______________________________________________ Title: ____________________________________
Date: __________________________________________________________
This instrument was acknowledged before me on the __________________ day of _____________________, 2025
In the County of ______________________________ In the State of ___________________________________.
By ___________________________________________________________________________
Notary Public Signature
My Commission Expires on: ________________________________ Seal or Stamp:
REQUEST FOR INFORMATION (RFI) DURING BIDDING PHASE
Requests For Information (RFI’s) will ONLY be accepted through a completed RFI form provided on page 9 in the front ends of this project.
Pre-Bid RFI’s deadline to submit: OCTOBER 10, 2025 BY 4:00 P.M.
Please email the completed RFI form to both:
amanda@wahlfieldconstruction.com f3@wahlfieldconstruction.com
The CM will review the RFI before submitting to the AE firm.
Any questions not submitted following this process prior to the deadline will not be answered.
REQUEST FOR INFORMATION (RFI) FORM
Project: Waukazoo Elementary Improvements Date: ________________ Sheldon Woods Elementary Electrical Improvements
Deadline: OCTOBER 10, 2025 BY 4:00 P.M. Action Requested:
______ Clarification
Attn: Fritz Wahlfield III, Fritz Wahlfield Construction (CM) ______ Direction
______ Approval
Company: __________________________________________________ ______ Alternate
Contact: ___________________________________________________ ______ Other
Email: _____________________________________________________
Phone No:__________________________________________________
Reference Drawing No: __________________________ Detail No: ___________ Spec. Section: ___________
Request Information:
RFI #: _________
CM Recommendation:
By: _______________________________ Date: ________________
AE Recommendation:
By: _______________________________ Date: ________________
BID CATEGORIES INDEX
1. Sitework
2. Concrete
3. Masonry
4. Metals
5. General Trades
6. Metal Roofing/Metal Panel Systems
7. Membrane Roofing
8. Aluminum Storefronts/Glazing
9. LPDA
10. Flooring
11. Painting
12. Fire Protection
13. Mechanical
14. Electrical
BID CATEGORY NO. 01 - SITEWORK
INCLUDE:
1. Complete Sitework and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
32.9219 SEEDING
2. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL
CONSTRUCTION DRAWING PAGES AND BECOMING FAMILIAR WITH THE COMPLETE SET TO
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. All Excavating and Earthwork as shown on pages C0.01, C2.01, and C8.10.
4. Compacting any imported soils as required to meet compaction requirements of soils for future footings, foundations, slab on grade, and/or backfill material.
5. Responsibility of the contractor to contact Miss Dig at least 36 hours prior to start of work.
6. The CM will provide a one time staking of grades, building footprint, and misc. locations.
a. Additional staking will be at the cost of the contractor.
7. Furnish and Install as shown:
a. Site demolition and site clearing as shown on C2.01
b. Lift Pump Station Work as shown on C2.01 and C8.10
i. Furnish and Install Pumps and Hatches as shown.
c. Seeding as shown on C2.01.
8. Concrete or asphalt cutting to complete work in this scope.
9. Any dewatering necessary to complete this scope of work.
10. Dust control measures for all work in this Bid Category.
11. Daily clean-up at work areas.
12. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
13. All work must be done in accordance with MIOSHA Regulations.
14. Warranties as specified.
15. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
16. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
BID CATEGORY NO. 02 - CONCRETE
1. Complete Concrete and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
03.3511 CONCRETE FLOOR FINISHES
07.2100 THERMAL INSULATION
07.9200 JOINT SEALANTS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Install all reinforcement as shown.
4. Provide Sealer and Vapor Barrier as specified.
5. Furnish and install all interior & exterior concrete MEP pads as shown.
a. Furnish and Install Bollards with Sleeves as shown.
6. Furnish and Install Interior Slab on Grade infills as shown on Pages A1.1A and A1.1B.
a. Finish new concrete for new finishes.
b. Install control joints as needed.
7. Furnish and install joint sealants at all new exterior concrete paving as shown and specified.
8. Dust control measures for all work in this Bid Category.
9. Daily clean-up at work areas.
10. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
11. All work must be done in accordance with MIOSHA Regulations.
12. Warranties as specified.
13. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
14. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 03 - MASONRY
1. Complete Masonry and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
04.0511 MASONTRY MORTARING AND GROUTING
04.2000 UNIT MASONRY
07.2100 THERMAL INSULATION
07.2500 WEATHER BARRIERS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. All masonry reinforcement, grout fill, loose fill or cavity wall insulation, etc., as shown and/or specified.
4. Grouting solid of new hollow metal frames in masonry.
5. Clean all new masonry.
6. Furnish and Install complete Masonry as shown and specified.
7. Furnish and Install all reinforcement as shown.
8. Demo and tooth in openings called out on Note 1 on pages A1.1A, A1.1B, A1.1C.
a. Furnish and Install CMU and Brick at new openings as shown.
b. Install Lintel as shown. Furnished by others.
c. Masonry Demo and Tooth-In as shown at Clerestory on page A1.1B
9. Cut in Joist Pockets as shown on S3.1A and S3.1B.
10. Masonry Tooth In at interior window opening in RM A113 for window B201.
11. Furnish and Install Masonry Chases in rooms A116, A119, A127, A130, A131, A134, B117, B142, C131, C137, C162, and C167.
12. Masonry infill at Rm B120 as shown.
13. Masonry infill at bottom of windows as shown on A2.1A.
14. All new masonry units need to be rubbed of debris and/or mortar and ready for paint.
15. Furnish and Install all necessary flashing as shown.
a. Masonry membrane flashing as shown.
16. Flashing and weep holes concealed in masonry work. Includes pre-finished flashings.
17. Cavity wall insulation, this includes all spray insulation at all new exterior walls.
18. Joint Sealants at all CMU wall CJs.
19. Fire safe-ing, fire resistant caulking, sound attenuation blankets and acoustical sealants being an integral part of the all system, where shown. Include fire safe-ing at existing masonry walls where shown. See code compliance plans for locations.
20. Install lintels as provided for new openings.
21. Provided rebar caps for all exposed rebar ends installed by this contractor.
22. This contractor is responsible for the disposal of excess masonry and masonry related items. I.e., rubble, cut blocks, mortar, etc., into concrete dumpster. Coordinate this with Construction Manager. It is the responsibility of this contractor to provide its own dumpsters as necessary.
23. All work must be done in accordance to the new Silica Regulations.
24. Furnish and install masonry toothing as required for all new openings as shown. Openings may include, but not limited to: doors, windows, louvers, chases and masonry openings for new MEP work.
25. Installation of anchor bolts at top of wall for wood blocking.
26. Dust control measures for all work in this Bid Category.
27. Daily clean-up at work areas.
28. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
29. All work must be done in accordance with MIOSHA Regulations.
30. Warranties as specified.
31. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
32. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 04 - METALS
1. Complete Metals and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
05.1200 STRUCTURAL STEEL FRAMING
05.2100 STEEL JOIST FRAMING
05.3100 STEEL DECKING
05.5133 METAL LADDERS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Erect new structural steel as shown on S0.01, S0.02, S0.03, S3.1A, S3.1B, S3.1C and S7.01.
4. Furnish and Erect structural re-inforcing as shown on S0.01, S0.02, S0.03, S3.1A, S3.1B, S3.1C and S7.01.
5. Furnish and Erect metal deck patching as shown.
6. Furnish New lintels as shown for new mechanical openings.
7. Furnish and Install any shoring needing to complete the work in this scope.
8. Furnish and Install any Fire protection and weld protection needed to complete the work in this scope.
9. All onsite welding must be done by certified welders.
10. Provide Fire Watch for work completed above.
11. Dust control measures for all work in this Bid Category.
12. Daily clean-up at work areas.
13. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
14. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
15. Warranties as specified.
16. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
17. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 05 - GENERAL TRADES
1. Complete General Trades work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
06.1000 ROUGH CARPENTRY
06.2000 FINISH CARPENTRY
06.6100 CAST POLYMER FABRICATIONS
07.9200 JOINT SEALANTS
08.1113 HOLLOW METAL DOORS AND FRAMES
08.1416 FLUSH WOOD DOORS
08.3513.13 ACCORDION FOLDING DOORS
08.7100 DOOR HARDWARE
10.1100 VISUAL DISPLAY UNITS
10.1419 DIMENSIONAL LETTER SIGNAGE
10.2113.17 PHENOLIC TOILET COMPARTMENTS
10.2800 TOILET, BATH, AND LAUNDRY ACCESSORIES
10.5113 METAL LOCKERS
12.3200 MANUFACTURED WOOD CASEWORK
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Schedule, take delivery, inventory, and store and install all items noted as “Install Only” above. Provide a list of material received each day to the Construction Manager’s Superintendent. All items not noted are to be furnished and installed.
4. Furnish and Install Floor Protection in the following Areas;
a. A100, A101, A142, C100, C117, C118, C126, C144, C151
i. Floor protection to be One layer of Water Resistant (WR) Hardboard by Protect in area of coverage. Thickness to be 44mil.
ii. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.
b. Gymnasium B117
i. Floor Protection to be one layer of ½” O.S.B over 6 mil clear poly plastic in area of coverage.
ii. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.
c. A138, B142, C101, C105, C106, C110, C111, C114, C120, C124, C127, C131, C132, C136, C137, C141, C146, C150, C158, C162, C163, and C167.
i. Floor protection to be a vinyl carpet shield covering the entire room along with (2) Sheets of WR Hardboard.
ii. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.
5. Demo as shown on pages A1.1A, A1.1B, A1.1C
a. Notes 2-5, 7-9, 11-17, 19, and 20.
b. Note 1
i. Remove existing Metal Panels as shown on Page A1.1B Clerestory.
c. Note 5 where hash marks are shown for ceiling to be reinstalled this is to be by LPDA category.
d. Furnish and Install temporary enclosures at all new exterior openings for doors, windows, and MEP openings. Make enclosures secure from outside and shed water.
e. Include Dumpster services for Demo specified under this scope of work.
i. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.
6. Furnish and erect all blocking shown on drawings or as specified in Miscellaneous Carpentry. Include all blocking not shown but incidental to your scope of work. Roof Blocking by others.
a. Casework and furnishings blocking as required.
b. Any doors or window bucks as needed/shown.
7. All lumber to be treated as specified.
8. Joint Sealants at all new door frames, casework, and countertops and any application where drywall meets
CMU walls.
9. Furnish and Install all Hollow Metal Door Frames and Window Frames as shown.
10. Furnish and Install all Hollow Metal and Wood Doors Leafs as shown.
11. Furnish and Install all new Door Hardware as shown.
12. Furnish and Install all new Casework, Millwork, and Countertops as shown.
13. Furnish and Install new marker boards and tack boards as shown.
14. Furnish and Install all new Bath Accessories as specified and shown.
15. Furnish and Install all new Toilet Partitions as specified and shown.
16. Furnish and Install new metal lockers as shown.
a. Includes wood bases as shown.
17. Furnish and Install new roller shades as shown on pages A9.1A, A9.1B, and A9.1C.
18. Dust control measures for all work in this Bid Category.
19. Daily clean-up at work areas.
20. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
21. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
22. Warranties as specified.
23. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
24. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
25. Alternate No. A-1: Provide All Costs Associated with Replacing the small group room accordion doors, as indicated on the plan, with high performing acoustic accordion doors.
a. Required in this scope of work.
BID CATEGORY NO. 06 - METAL ROOFING/METAL PANEL SYSTEMS
1. Complete Metal Roofing/Metal Panel Systems as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
07.2100 THERMAL INSULATION
07.2500 WEATHER BARRIERS
07.4113 METAL ROOF PANELS
07.4213 METAL WALL PANELS
07.4213.19 INSULATED METAL WALL PANELS
07.4213.23 METAL COMPOSITE MATERIAL WALL PANELS
07.6200 SHEET METAL FLASHING AND TRIM
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Demolition of Existing Standing Seam roof as shown on pages A2.3A, and A2.3B.
a. Make area water sealed prior to installation of new standing seam roof system.
4. Include Dumpster services for Demo specified under this scope of work.
a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.
5. Furnish and Install all joint sealants for related work in this scope.
6. Furnish and Install complete roofing system as shown.
a. Standing Seam Metal Roofing System.
i. This includes all metal flashing and copings.
7. Furnish and Install ½” Coverboard with (2) layers of 2.6” Rigid Insulation underneath the Metal Roof System.
a. Include Ice and Water Shield for this new system.
8. Furnish and Install any blocking as needed for this scope of work.
9. Daily clean-up at work areas.
10. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
11. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
12. Warranties as specified.
13. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
14. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 07 - MEMBRANE ROOFING
1. Complete Membrane Roofing as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
07.2100 THERMAL INSULATION
07.2500 WEATHER BARRIERS
07.5300 ELASTOMERIC MEMBRANE ROOFING
07.6200 SHEET METAL FLASHING & TRIM
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Demolition of existing Membrane roof and insulation as shown on page A2.3A, A2.3B, and A2.3C.
a. Demolition shall be performed so that there is no water damage to existing and new finishes inside the building. All work must remain water tight at the end of the day.
4. Include Dumpster services for Demo specified under this scope of work.
a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.
5. Furnish and install new membrane roof system as shown on page A2.3A, A2.3B, and A2.3C.
a. This includes all metal flashings and copings related to this work.
b. This includes flashing in all existing penetrations along with all new penetrations.
6. Furnish and Install ½” coverboard with (2) layers of 2.6” Insulation fastened to the metal deck.
a. This includes the tapered insulation as shown on the drawings.
7. Furnish and Install new wood blocking as shown.
8. Furnish and Install all joint sealants for related work in this scope.
9. Daily clean-up at work areas.
10. Contractor to Meet Project Schedule, this includes weekend work or Daily overtime.
11. Furnish and install complete roofing system as shown.
12. Tie into the existing roofing system as necessary.
13. Provide all warranties as specified.
BID CATEGORY NO. 08 - ALUMINUM STOREFRONTS & GLAZING
1. Complete Aluminum Storefronts & Glazing as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
07.9200 JOINT SEALANTS
08.4313 ALUMINUM-FRAMED STOREFRONTS
08.7100 DOOR HARDWARE
08.8000 GLAZING
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Install all Aluminum Frames and Doors as shown.
a. Including all Door Hardware related to this scope of work.
4. Furnish and Install all Glass and Glazing as shown.
5. Furnish and Install Mirrors as shown.
6. Furnish and Install all joint sealants for related work in this scope.
7. Glass cleaning at substantial completion of the entire project.
8. Furnish and install all storefront systems as shown and specified.
9. Contractor responsible for all field measurements for this scope of work.
10. Provide all hardware specified under this scope.
11. Furnish and install any break metal necessary to complete this scope.
12. Furnish and install egress stickers at all new egress openings.
13. Furnish and install all glazing films as shown.
14. Daily clean-up at work areas.
15. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
16. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
17. Warranties as specified.
18. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
19. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 09 - LPDA
1. Complete LPDA work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
05.4000 COLD-FORMED METAL FRAMING
07.8400 FIRESTOPPING
09.2116 GYPSUM BOARD ASSEMBLIES
09.2216 NON-STRUCTURAL METAL FRAMING
09.5100 ACOUSTICAL CEILINGS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Demo as called out for on Sheets A1.1A and A1.1B, note 5.
a. Areas to be taken down and reinstalled. This scope will be included in this bid category.
4. Furnish and Install all new metal studs as shown.
a. This includes cold form metal framing and non structural metal framing.
5. Engineered drawings required to be provided for cold form metal framing.
6. Furnish and Install all Gypsum boards as shown.
a. All Gypsum board must be finished as specified for painting.
7. Furnish and Install new Ceilings and Grid as shown on the drawings.
8. Furnish and Install new drywall bulkheads as shown.
9. Furnish and Install all batt insulation as shown on interior partitions as well as any exterior metal stud walls as shown.
10. Furnish and Install firestopping at all rated assemblies as shown on the drawing.
11. Coordinate layout and elevations with the Construction Manager prior to install.
12. Dust control measures for all work in this Bid Category.
13. Daily clean-up at work areas.
14. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
15. All work must be done in accordance with MIOSHA Regulations.
16. Warranties as specified.
17. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
18. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 10 - FLOORING
1. Complete Flooring work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
07.9200 JOINT SEALANTS
09.3000 TILING
09.6500 RESILIENT FLOORING
09.6813 TILE CARPETING
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Demo of Existing flooring and base as shown in note 10 on pages A1.1A, A1.1B, and A1.1C.
4. Include Dumpster services for Demo specified under this scope of work.
a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.
5. Furnish and Install new flooring as shown on the drawings.
a. This includes All Resilient Flooring (including base), Tile Carpeting, and Ceramic Tiling.
b. Responsible for monitoring and procuring methods for humidity control during the installation of the new flooring system.
6. Minor floor prep as needed.
7. Furnish and Install Entrance Floor Mats and Frames as shown.
8. Coordinate layout and elevations with the Construction Manager prior to install.
9. Dust control measures for all work in this Bid Category.
10. Daily clean-up at work areas.
11. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
12. All work must be…