Addendum 1 to Invitation to Bid No. FPD126-FIREA-6222 Video Laryngoscope and Accessories.pdf
PDF 167 KB Posted
- Attached to
- Video Laryngoscope and Accessories
- Solicitation number
- FPD126-FIREA-6222
- Issued by
- San Bernardino County, California
About this file
This document is Addendum 1 to Invitation to Bid No. FPD126-FIREA-6222 issued by the State of California for Video Laryngoscope and Accessories. The addendum was issued on December 29, 2025, and provides clarifications to the original ITB requirements. The addendum addresses key procedural questions regarding the bid evaluation process and product specifications.
The addendum clarifies that substitutions for proposed products are acceptable, though supporting literature for substitutions is not required but is helpful during the selection process. The award determination will be based on the line items proposed by bidders along with the overall total cost of the requested items, rather than on individual line items alone. This guidance establishes the evaluation methodology for comparing competing bids and selecting the successful vendor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Video Laryngoscope and Accessories - ITB - Final122225.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: December 29, 2025
Addendum # 1 to Invitation to Bid No. FPD126-FIREA-6222 Video Laryngoscope and Accessories
This Addendum is intended to provide additional information and/or to change the requirements in the above referenced ITB. Any information contained herein will be considered part of the RFP and as such will be used in the evaluation of the proposal responses.
Addendum Description:
1. Q&A Portion of the ITB
QUESTION ANSWER
Are substitutions acceptable? Yes, substitutions are acceptable.
Will literature be required for substitutions?
Literature is not a requirement, but helpful in the selection process.
Is the award determined by the individual line items or the overall total cost?
The award will be determined by the line items proposed along with the overall total cost of those line items requested.
File details come from the government source that posted it. Updated .