This Addendum 1 to IFB BA-2026-01 pertains to the New York State Department of Corrections and Community Supervision's solicitation for on-line partial discharge testing of medium voltage primary cables, terminations, splices, and connected equipment at Bare Hill Correctional Facility using a Doble Online PD Testing System. Bidders must attend a mandatory site visit scheduled for September 1, 2026 at 12:00 p.m. (RSVP required by August 28, 2026), with written questions due by September 9, 2026 at 1:00 p.m. and responses to be issued on or about September 16, 2026. Sealed bids are due September 30, 2026 at 1:00 p.m. The contract will commence October 15, 2026 and run through October 15, 2027, with potential renewal for additional periods not to exceed five years in total. The contractor must deliver two copies of an engineered report with risk category evaluation for all equipment tested.

Award will be made on a Grand Total basis to the lowest responsive and responsible bidder. Pricing must include a comprehensive annual base bid covering all labor, materials, equipment, and ancillary costs for inspection, testing, maintenance, and corrective repairs, plus time-and-materials pricing for out-of-scope work structured as an hourly labor rate and a percentage markup over contractor costs for parts and materials. Prevailing wage rates apply under New York State Labor Law (PRC# 2026004581). A Service-Disabled Veteran-Owned Business participation goal of 6 percent applies; MBE and WBE goals are 0 percent. Contractor obligations include New York State standard clauses addressing non-discrimination, workers' compensation, record retention for the contract duration plus six years, equal employment opportunity policies, and Iran Divestment Act compliance. Contracts exceeding $50,000 require State Comptroller approval before effectiveness. For contracts exceeding $1 million, contractors must demonstrate reasonable efforts to engage New York State Business Enterprises and MWBEs as subcontractors and suppliers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KATHY HOCHUL

Governor

DANIEL F. MARTUSCELLO III

Commissioner

Addendum #1 to IFB BA-2026-01

Addendum #1

September 16, 2026 IFB # BA-2026-01 – Partial Discharge Testing at Bare Hill Correctional Facility

QUESTIONS & ANSWERS

IFB BA-2026-01

PARTIAL DISCHARGE TESTING AT BARE HILL CORRECTIONAL FACILITY

1. Respectfully request to be provided with a Project One Line Diagram in support of proposal development?

Answer: A one-line diagram was provided for viewing at the site visit. A one-line diagram will only be provided to the winning bidder.

2. Why is this scope inclusive of the Generator Battery System (24V), which is not the case for other sites?

Answer: Showing equipment we have, not part of the scope.

3. Why is the Generator Battery System (24V) scope not conducted with the Generator Maintenance and

Testing?

Answer: It was included in our 3yr switchgear maintenance in Sept. 2025 and generator PM with Milton Cat.

4. Why is this site not inclusive (comprehensive) of all scopes listed?

• ARC FLASH SAFETY AWARENESS TRAINING

• PORTABLE GENERATOR CONNECTION TRAINING

• SERVICE AND TESTING OF MEDIUM VOLTAGE SWITCHGEAR & TRANSFER SWITCHES

• SERVICE AND TESTING OF AUTOMATIC TRANSFER SWITCHES

• SERVICE AND TESTING OF MEDIUM VOLTAGE VACUUM CIRCUIT BREAKERS

• SERVICE AND TESTING OF BATTERY SYSTEMS, SERVICE AND TESTING OF MOTOR

CONTROL CENTERS

• SERVICE AND TESTING OF OIL FILLED TRANSFORMERS

• SERVICE AND TESTING OF DRY TYPE TRANSFORMERS

• SERVICE AND TESTING OF LOW VOLTAGE AIR SWITCHES

• TESTING AND CALIBRATION OF PROTECTIVE RELAYS

• PARTIAL DISCHARGE TESTING

• INSTALLATION OF UL LISTED INFRA-RED WINDOWS TO BE INSTALLED

Answer: Because we already did our 3yr switchgear maintenance. This scope is just for partial discharge testing. Next IFB will be 3yr switchgear maintenance and partial discharge together.

5. Has the Arc Flash Study been conducted?

Answer: Last arc flash study was done in 2017. A new IFB will be going on contract reporter once it’s ready for the next arc flash study.

6. What is the intent of inclusion of the below statement in the IFB when no Power Systems Study is to be conducted as part of the scope?

The Contractor shall have the study prepared by qualified engineers of an independent consultant.

The consultant shall be a Registered Professional Electrical Engineer licensed in NY State who has at least ten (10) years of experience and specializes in performing power system studies.

Answer: The scope is for Doble online partial discharge testing.

7. Is the contractor or consultant required to meet this qualification if not performing Power System Studies?

This bid template is for electrical switchgear testing / partial discharge testing only.

QUALIFICATIONS: The Contractor shall have the study prepared by qualified engineers of an independent consultant. The consultant shall be a Registered Professional Electrical Engineer licensed in NY State who has at least ten (10) years of experience and specializes in performing power system studies.

Answer: Yes, they are required to meet the qualifications because partial discharge training will be done online.

8. What is the age of the 130v System?

Answer: 2016

9. What is the age of the 24v System?

Answer: 2016

10. Please clarify and quantify the quantity of the following that are part of the scope.

• Load breaker switches

• Oil filled transformers

• Dry Type Transformers

• Pole Mounted transformers

Answer: 30 Oil filled transformers / 30 Load breaker switches / 4 dry type transformers.

11. Please clarify and quantify the locations of the following that are part of the scope.

• Load breaker switches

• Oil filled transformers

• Dry Type Transformers

• Pole Mounted transformers

Answer: 30 oil filled transformer & 30 Load breaker switches – located behind each building 4 dry type transformer – located in electrical rooms in the Admin Bldg., Activity Building, Annex Yard electrical building, and the Generator Bldg.

12. Is it the expectation of the consultant/contractor to provide a single generator for temporary power as needed?

Answer: N/A – Testing will be done online.

13. What size generators are to be provided for critical buildings?

Answer: N/A

14. How many generators are required?

15. Who is responsible for fueling the generators once onsite?

16. Will a separate Automatic Transfer Switch (ATS) arrangement be required for Temp Power

Installations?

Answer: N/A

17. Who will be the responsible party and approver of temporary installations of contractor equipment?

18. Request to be provided allowable locations for placement of temporary installations (Generators or ATS

Equipment)?

19. Will any permits be required for temporary Generators?

20. Request to be provided allowable connection locations for Temporary installations (Generator or ATS

Equipment)?

21. Request to be provided each connection location Amp rating for Temporary installations (Generator or

ATS)

22. Request to be provided each locations cable size to be powered by Generator and or ATS?

23. Are the spare breakers part of the project scope?

Answer: No, they were part of the 3yr switchgear maintenance.

24. What is the date of the last testing completed under this scope control house breakers?

Answer: Not in scope, but last tested in 3yr switchgear maintenance, 9/2025.

25. What is the date of the last testing completed under this scope for control house relays?

26. What is the date of the last testing completed under this scope for Generator control house breakers?

27. What is the date of the last testing completed under this scope for Generator control relays?

28. What is the date of the last testing completed under this scope for Oil filled transformers?

29. What is the date of the last testing completed under this scope for air magnetic circuit breakers?

30. What is the date of the last testing completed under this scope for dry type transformers?

31. Request to be provided Vendor information for each Oil Type Transformer within scope?

Answer: Not part of the scope

32. How are Safety Deficiencies to be addressed?

Answer: Notify our facility and we will advise.

33. Is conductor cable testing in scope and required?

Answer: Yes

34. What are the delineation points for cable testing?

Answer: Partial discharge of medium voltage primary cables, terminations, splices, and connected equipment.

35. What are the cable conductor sizes?

Answer: 2AWG – copper – 15KW rated

36. What material are the cable conductors made of (Copper or Aluminum)?

Answer: Copper

37. How will materials be handled for immediate repair deficiencies identified?

Answer: Proposed major corrective modifications will be taken under advisement by the facility.

38. Who is responsible for Vegetation Management to support work scope?

Answer: The facility has a contractor come in annually. Last done 8/2026.

39. What are the total number of manholes on the outside perimeter?

Answer: Approx. 16

40. What are the total manholes inside the protected area or interior perimeter?

Answer: Approx. 26

41. Who is responsible for background investigations/checks?

Answer: The facility will send forms out for the awarded bidder; the company will fill out forms and submit back to us. We will advise once approved.

42. When are background investigations required to be submitted?

Answer: Once you’re granted as the awarded bidder.

43. Will fingerprinting be conducted?

Answer: No

44. When will fingerprinting be conducted?

45. Does any equipment contain asbestos?

46. Does any equipment contain lead?

47. Does any equipment contain PCB’s?

48. Will NYS OGS be providing Relays Settings?

Answer: Not needed for this scope of work.

49. What specific type of cable testing type is to be performed?

Answer: Partial discharge of medium voltage primary cables, terminations, splices, and connected equipment using Doble online partial discharge testing.

50. Are any breaker installation or racking devices part of the scope?

51. What is the protocol for coming in and out of the facility?

Answer: We will have workers here to assist/escort you in and out of the facility.

52. If the facility has no incarcerated individuals, is there a need to use a generator to keep the facility power going?

Answer: No need, because all testing should be done online.

53. Is this site single source fed?

Answer: Yes.

54. Are all pad mounts the same manufacturer?

Answer: Some may have changed over the years, but all are similar.

55. Are there any dry type transformers?

Answer: There are 4 dry type transformers in the electrical rooms of Admin Building, Act. Building, Annex Yard Building, and Generator Building.

56. Are the transformers delta or y?

Answer: It varies.

57. How often does the generator run?

Answer: At least once a month for 2 hours at a time.

All other terms and conditions remain the same.

IMPORTANT NOTE: This addendum must be signed and returned with bid.

Signature

Print Name and Title

Date

Applicants should monitor the following web site for posted updates or information:

NYS Contract Reporter: http://www.nyscr.ny.gov http://www.nyscr.ny.gov/

File details come from the government source that posted it. Updated .