Addendum 1 Summary_McClave Drive.pdf
PDF 97 KB Posted
- Attached to
- MCCLAVE DRIVE DRAINAGE IMPROVEMENT
- Solicitation number
- PE-64452-NONST-2024-000000011
- Issued by
- Dekalb County, Georgia
About this file
This document is an Addendum 1 for the McClave Drive Drainage Improvements project, issued by the City of Doraville, Georgia, Department of Public Works. The addendum provides clarifications and revisions to the original bid schedule, including the addition of line items for curb and gutter, asphalt, and granite curbing, as well as the removal of trees 6 inches or greater in diameter. The project involves drainage improvements in accordance with Georgia Department of Transportation standards and specifications.
The bid schedule has been revised, and bidders must use the Addendum 1 Bid Schedule. The project is located in Dekalb County, Georgia, and the contractor must self-perform a minimum of 50% of the contract value. Pricing terms, set-asides, funding sources, and other salient information are not provided in the addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1 McClave Drive Drainage Improvements June 14, 2024
Questions and responses.
1. How will testing be performed and will the owner be paying this under contingency? Third party testing (when needed) will be performed by others and will not be a contractor responsibility.
2. How will subgrade be handled if poor soil is encountered for headwall footing? It would need to be undercut and replaced with 57 stone. Line item has been adjusted.
3. Please confirm if stone bedding is required for RCP. Confirmed. Pipe needs to be bedded to the spring line.
4. Is the 57 Stone for bedding of the pipe? Yes. Pipe and headwall footing.
5. There appears to be no pay item for curb and gutter nor asphalt. With proposed alignment of
36” RCP this will force removal of curb and gutter and most likely 2-3 ft of travel lane. Can line items be added for these for clarity for all bidders? Curb and gutter has been added as a line item on the bid schedule. Asphalt has been added as a line item on the bid schedule. Granite curbing has also been added as a line item. Depending on pricing, the City may elect to install granite curbing.
6. There are trees that border the LOD at the headwall. For clarity can you call out trees that need to be removed as the root zones could be impacted to get proper safe excavation for working area. Removal of trees that are 6” or greater in diameter has been added to bid schedule.
Clarifications and revision Summary
-The Bid Schedule has been revised to add and/or delete pay items. Bidder must use the Addendum 1 Bid Schedule