This document is Addendum #1 to a Request for Proposals (RFP) issued by Coos County, Oregon for the construction of a fire training tower. The project involves permitting, site preparation, and the construction of a modular designed fire training tower. The vendor is responsible for providing stamped drawings by an Illinois licensed Professional Engineer, a recommended foundation design, and an estimate of the time required for on-site assembly and construction. The RFP requests a completion timeframe of 150-180 days once the contract is finalized. The vendor must also provide an 8-10 hour training program for up to 12 college personnel and have a service facility and technicians within 250 miles of the proposed facility.

The RFP has a proposed schedule with key dates including the deadline for questions, the posting of addendum Q&A, the proposal due date, tentative interviews or software demonstrations, and the tentative announcement of the intent to award.

View the file

Other files

File Type Posted
Addendum 2 SOCC RFP Fire Tower.pdf PDF
RFP Fire Tower.pdf PDF
Intent to Award~23.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS

Fire Tower

Addendum #1

Addendum #1 Issue Date: March 13, 2023

RFP Issue Date: March 6, 2023

RFP Closing Date and Time: April 6, 2023 at 3:00 PM

This Solicitation Addendum is issued to the above referenced RFP and forms a part of the contract documents and modifies the original scope of work, specifications and drawings, requirements and deadlines. Except as changed by this Addendum, all terms, conditions, scope of work, plans, specification, requirements and deadlines in the original RFP and previous addenda remain unchanged.

PLEASE NOTE THE FOLLOWING CLARIFICATIONS, ADDITIONS, CORRECTIONS OR REVISIONS TO THE ABOVE

REFERENCED RFP HIGHLIGHTED BELOW:

Proposed Schedule

RFP Release:…………………………………………………………………………………………… ( March 6, 2023) Deadline for questions and requests for clarification: ………………………………..(March 27, 2023) Addendum Q & A posted on Oregon Buys:…………………………………………………. ( April 3, 2023) Proposals Due: ………………………………………………………………………………………... (April 6, 2023) Tentative interviews and/or software demonstrations (if required): ………… (April 10, 2023) Tentative Announcement of intent to award: ……………………………………………. (April 17, 2023)

1) GENERAL INFORMATION AND INSTRUCTIONS

a) Background

The project will involve

1) permitting – not part of vendor responsibility

2) site plan and site preparation: removal of a 40-year-old outdated, wood-framed tower structure; removal of a small metal storage building; site re-paving. – not part of vendor responsibility

3) tower construction – vendor clarification to fully assemble, assist a contractor to fully assemble, or clearly define vendor participation in assembling of the tower.

3) SCOPE OF WORK

Nature of Services Required

b) Scope of Services:

v.) Vendor shall submit stamped drawings by IL licensed PE and rendering of drawing/plans.

vi.) Vendor to provide recommended foundation design and site requirements.

viii.) Vendor shall provide an estimate of the time to be spent on site assembling/constructing structure. Vendor time versus contractor time.

x.) The vendor shall state time to completion. (Delivered and erected) Preferred is 150–180-day completion time frame once contract is finalized.

xii.) Vendor must provide an 8- to 10-hour training program for up to 12 college provided personnel. Alternate fire training program activities are acceptable.

xiii.) Manufacturer must have service facility and technicians within two hundred (250) miles of proposed facility. This would be the College preference or propose alternate service support.

Questions posed are in red and answers are in blue.

1 Clarification Q: Have there been any A&E drawings done for this project, these would show information concerning the build of this tower, elevation, tower width, loading and usage?

A: No A&E drawings have been done for this project. The College is looking for a vendor to provide a modular designed fire training tower as outlined in 3.

Scope of Work; C) Training Tower Components.

End of Addendum #1