This is Addendum No. 1 to Request for Qualifications RFQ2026012 issued by a Florida government entity for Construction Engineering and Inspection (CEI) services for the Shingle Creek North Ph 2C Countyline Connector project. The addendum provides clarifications to the original RFQ document through eight questions and answers addressing certification requirements, staffing, and project scope. Key clarifications include confirmation that SSPC C-3 Supervisor/Competent Person Training for deleading is not required, that a Resident Compliance Specialist is mandatory and must complete required computer-based training, and that staff hour estimates are not required with the proposal submission. The addendum confirms that construction plans are preliminary and currently being updated, with finalized design anticipated by year-end 2026; consultants should note that final design documents may differ from the attached preliminary plans. The solicitation seeks one FDOT pre-qualified consulting firm under work type 10.0 to provide comprehensive CEI services in accordance with Rule Chapter 14-75, Florida Administrative Code.
The estimated CEI contract value is $1,109,830 based on an estimated construction cost of $9,583,015. Funding will be provided through federal and local agency funds. The contract will support construction administration, inspection, materials sampling and testing, and contract compliance activities. Proposers must acknowledge receipt of the addendum with their submission. Detailed staff hour estimates and fee proposals will be requested during contract negotiations with the selected consultant rather than as part of the initial RFQ response. Qualified proposers are responsible for identifying any language or requirements that may restrict competition or constitute single-source procurement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 23, 2026 Page 1 of 2
Addendum No. 1
Project: Shingle Creek North Ph 2C Countyline Connector - CEI Services Bid No: RFQ2026012
TO ALL PROPOSERS:
The following items are clarifications, corrections, additions, deletions and / or revisions, which shall take precedence over the original documents.
Question 1: SSPC Course: C-3 Supervisor/Competent Person Training for Leading of Industrial Structures (if applicable) is listed as a certification for both the Project Administrator and Senior Inspector. Can you confirm whether this certification applies to this project?
Answer: SSPC C-3 Supervisor/Competent Person Training for Deleading of Industrial Structures is not required for this project. Based on the current scope of work, no lead-paint removal or deleading activities are anticipated. Therefore, this certification is not required for the Project Administrator or Senior Inspector.
Question 2: Is this Contract Support Specialist required for this contract?
Answer: A Resident Compliance Specialist (RCS) is required for this contract. The RCS shall meet the minimum qualifications and training requirements identified in the Scope of Services, including the required Resident Compliance Specialist Computer-Based Training
(CBT).
Question 3: Should the consultant submit a staff hour estimate as part of their response?
Answer: No. A staff hour estimate is not required as part of the RFQ response.
Consultants should provide the information requested in Section 3.1 Qualification Content. Detailed staff hour estimates and fee proposals will be requested during contract negotiations with the selected consultant.
Question 4: What is the estimated CEI contract value?
Answer: $1,109,830
Question 5: What is the estimated construction cost?
Answer: $9,583,015
Question 6: What is the funding source?
Answer: Federal and local agency funds.
Question 7: Are the construction plans available?
Answer: The initial design for this project was completed in 2021. The city is currently updating the construction plans, and the updated design is anticipated to be finalized by the end of this year.
For reference purposes, the current set of construction plans is attached to this Addendum. Please note that these plans are preliminary and are subject to revision.
Consultants should be aware that the final design documents may differ from the attached plans.
Question 8: Can you clarify the meaning of “a detailed statement that explains how the consultant will provide services to design and prepare a completed set of construction contract documents in consistency w/the Scope of Services and other document requirements as reference in the said scope.”
Answer: The referenced statement is not applicable to this CEI contract. Consultants shall provide a detailed statement describing their approach to performing the Construction Engineering and Inspection (CEI) services identified in the Scope of Services, including construction administration, inspection, materials sampling and testing, and contract compliance activities. Consultants are not required to provide design services or prepare construction contract documents as part of this contract.
A. ACKNOWLEDGMENT OF ADDENDA:
1. The proposer shall acknowledge receipt of this addendum by completing the applicable section in the RFQ. The Proposer shall submit said Form with the proposal.
2. All other terms and conditions of the RFQ remain unchanged.
Brandon Durango Procurement Manager
ACKNOWLEDGMENT OF ADDENDA NO.(S) _________ (IF APPLICABLE)
(Signature)
COMPANY NAME _______________________________________
COMPANY ADDRESS _______________________________________
BY: _________________________ DATE:________________________
(signature)
_____________________________ EMAIL:_______________________
(typed name/title of signer)
File details come from the government source that posted it. Updated .