This is Addendum 1 to a Request for Proposal (RFP) issued by the City of Monroe, Oregon for Water System Modernization and Raw Water Intake Improvements. The addendum modifies the original RFP requirements for the Monroe Water Intake and System Upgrades project. The addendum establishes clarifications, modifications, or additional specifications related to the water system modernization scope of work, which typically encompasses raw water intake infrastructure improvements and associated system upgrades necessary to enhance the city's water supply capabilities and infrastructure resilience. The addendum serves as an official amendment to the procurement documents and must be acknowledged by all prospective bidders as part of their proposal submission to ensure compliance with the updated project requirements and specifications.
The addendum provides essential modifications to the original RFP terms that affect the evaluation criteria, technical specifications, or contractual conditions applicable to interested contractors and consultants. Prospective bidders are required to incorporate the addendum requirements into their proposals and confirm receipt and understanding of all amendments prior to submittal. The specific pricing adjustments, scope modifications, timeline changes, or other substantive alterations outlined in this addendum supersede conflicting provisions in the original RFP documents and represent the current requirements binding all parties to the procurement process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF MONROE, OREGON
REQUEST FOR PROPOSALS
PROFESSIONAL ENGINEERING SERVICES
WATER SYSTEM MODERNIZATION AND RAW WATER INTAKE IMPROVEMENTS
ADDENDUM NO. 1
RFP No.: RFP-2026-01
Issue Date: September 29, 2026
This Addendum modifies and clarifies RFP 2026-01. Except as expressly modified by this Addendum, all requirements, terms, and conditions of the RFP remain in effect.
1. UPDATED SECTION 1135 PROJECT SCHEDULE
Following issuance of the RFP, the City received updated schedule and status of federal funding information from the U.S. Army Corps of Engineers, Portland District (USACE-PD), regarding the Section 1135 Long Tom River Ecosystem Restoration Project.
Additional federal funding authorization is necessary before the Section 1135 Project can advance to construction. USACE-PD has advised the City that the project remains active and in good standing; however, the federal funding process will not be completed in sufficient time to support the previously anticipated 2027 in-water construction window.
For purposes of City planning and this procurement, the City is therefore using the 2028 in-water work window as the current planning target for coordination of the Raw Water Intake Improvements with the Section 1135 Project. This planning assumption does not represent a commitment or construction schedule established by USACE-PD. The timing of the Section 1135 Project remains uncertain and subject to future federal funding decisions and continued coordination between the City and USACE-PD.
Proposers shall consider this updated information when developing their project understanding, approach, sequencing, and preliminary schedule.
2. REVISED PROJECT PHASING AND PRIORITIES
The Water System Modernization and Raw Water Intake Improvements remain within the scope of this procurement. However, the City intends to advance the work on separate implementation schedules in response to the updated Section 1135 schedule.
Water System Modernization – Immediate Priority
The Water System Modernization Project will proceed as the City's immediate priority and is not expected to await implementation of the Section 1135 Project or Raw Water Intake Improvements.
Proposers should develop their approach and preliminary schedule accordingly, including timely evaluation and confirmation of the recommended treatment approach; coordination with Oregon Health Authority Drinking Water Services (OHA-DWS); design; procurement;
construction; startup and commissioning, as applicable; and identification of critical-path decisions, long-lead equipment, and other schedule risks.
Raw Water Intake Improvements – Subsequent Authorization
The Raw Water Intake Improvements remain part of the professional services under this RFP, and the City intends to select a Consultant with the qualifications and capacity necessary to perform this work.
However, the timing and extent of Raw Water Intake Improvements will depend upon continued development of the Section 1135 Project, federal funding decisions, coordination with USACE-PD, and subsequent City direction.
Selection of a Consultant under this RFP does not constitute authorization to proceed with the Raw Water Intake tasks identified in the Scope of Professional Services. The City anticipates authorizing work in phases and will determine the appropriate timing and extent of Raw Water Intake services as additional information becomes available regarding the Section 1135 Project.
The Consultant shall coordinate the Water System Modernization work with anticipated future Raw Water Intake Improvements where necessary to avoid conflicts, preserve appropriate design flexibility, and support the efficient implementation of both projects.
3. REVISED SCHEDULE
The Schedule of Events in Section 1.9 of the RFP is revised as follows:
EVENT DATE
Virtual Pre-Proposal Meeting 10/05/2026 – 4:00 PM
Water Treatment Plant Site Visit 10/12/2026 – 10:00 AM
Deadline for Questions 10/15/2026
Final Addendum/Response to Questions 10/19/2026
Proposals Due 10/23/2026 – 5:00 PM
Proposal Evaluation 10/23-11/6/2026
Interviews (If Conducted) TBD
Notice of Intent to Award TBD
Contract Negotiation Following Selection
City Council Authorization TBD
Contract Award/Notice to Proceed TBD
Note: Schedule is anticipated and subject to change by Addendum 1 Email City Contact to confirm site visit
4. VIRTUAL PRE-PROPOSAL MEETING
The City will conduct a virtual pre-proposal meeting on October 5, 2026, at 4:00 PM Pacific Time.
City staff and project partners will provide updated information regarding the projects, including the revised Section 1135 schedule, Water System Modernization priorities, project coordination, and other information relevant to preparation of Proposals.
Prospective Proposers will also have an opportunity to ask questions.
Attendance is encouraged but not mandatory.
Microsoft Teams Meeting Information:
MEETING LINK | MEETING ID: 253 049 303 938 911 | PASSCODE: DW6yb79C
Statements made during the meeting are informational and do not modify the RFP unless subsequently confirmed by written Addendum issued by the City.
5. WATER TREATMENT PLANT SITE VISIST
The City will conduct an in-person site visit at the Monroe Water Treatment Plant on October 12, 2026, at 10:00 AM.
City staff will discuss the project updates and provide an opportunity for prospective Proposers to observe the existing water treatment facilities, equipment, operations, and site conditions relevant to the Water System Modernization Project.
Attendance is encouraged but not mandatory.
Meeting Location:
24811 Highway 99, Monroe, OR – Adjacent to Monroe City Park
The site visit is primarily intended to observe existing conditions. City staff may provide facts and figures regarding existing facilities and operations; however, statements made during the site visit shall not modify or interpret the requirements of the RFP.
Questions arising from the site visit that may affect interpretation of the RFP, Scope of Professional Services, or preparation of Proposals shall be submitted in writing in accordance with the RFP and the revised solicitation schedule. Any modification or clarification of the RFP will be made only by written Addendum.
6. PROPOSAL PREPARATION
Proposals should demonstrate the firm's ability to advance the Water System Modernization Project expeditiously while maintaining appropriate coordination with the anticipated future Raw Water Intake Improvements and Section 1135 Project. Proposed project approaches and schedules should identify significant dependencies, decision points, regulatory coordination, long-lead items, and other factors that may affect timely implementation.
https://teams.microsoft.com/meet/253049303938911?p=9pjPGQ7qRy9JFWWKu5
7. EFFECT OF ADDENDUM
This Addendum forms part of RFP 2026-01. To the extent that this Addendum conflicts with the original RFP, this Addendum controls.
All other provisions of RFP 2026-01 remain unchanged.