This document is Addendum 1 for the Town of Telluride's 2024 Street Mill & Overlay Program, dated March 1, 2024. The addendum extends the bid submittal deadline to Friday, March 15, 2024, at 3:00 PM local time and provides clarifications for the project. The project encompasses seven work items involving street milling, asphalt overlay, and road surface improvements across multiple locations in Telluride, including East Columbia Avenue, West Colorado Avenue, Pandora Avenue, Town Park, North Maple Street, and North Willow Street. Work items include traffic control, construction stormwater management, sawcutting existing asphalt, milling, road surface removal, roadbase placement, and hot bituminous pavement overlay and placement, with varying depths of asphalt (2-7 inches) depending on the specific work item.
The addendum clarifies that while a State Stormwater Permit is not required, each work item includes a Construction Stormwater Management pay item requiring a written erosion and sediment control plan with specific components. A new bid tab is included with corrections to bid quantities, units, and an over-excavation line item. Bidders are allowed to submit proposals via hand delivery to the Public Works Facility, overnight mail, or email to Karen Guglielmone, with a request to confirm receipt. The bid alternates include new pavement work for the 400 Block Pandora East Half and widening the 600 Block West Colorado Avenue travelway by 4 feet. Contractors have flexibility in road surface removal methods and are advised that subgrade preparation is subsidiary to existing bid items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024 Street Mill and Overlay Program Bid Packet FNL 2024Feb14.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Box 397 Telluride, CO 81435
(970) 728-2177
REQUEST FOR BIDS
2024 Street Mill & Overlay Program
Addendum 1
• Extension of the Submittal Deadline to Friday, March 15, 2024, 3 pm
• Questions:
1. Will this contract require a State Stormwater Permit?
Answer
This project does not require a State Stormwater Permit (required on 5 acres of disturbance);
however, there is a pay item for Construction Stormwater Management for each of the seven (7) Work Items. Each pay item will require the submittal of a written erosion and sediment control plan.
Required components of the submittal are:
a. wattles/sediment socks set up down gradient from the excavation
b. wattles/sediment socks set up around stormwater inlets
c. identifying locations of any stored materials, asphalt, or aggregate
d. identifying locations of any porta potties if applicable
e. noting your daily clean up plan; for example, street sweeping and trash clean up
f. dust control
• Clarifications:
1. New Bid Tab included with Addendum No. 1. The new bid tab includes corrections to bid quantities and units, and includes an over-excavation line item (if needed).
2. For new pavement Work Items (Bid Alternates for Pandora Ave. and Colorado Ave. shoulder) the contractor shall dictate the means and methods for existing road surface removal whether that be by use of a mill machine, excavator, or both.
3. Subgrade preparation as described in Town ROW Specifications is considered subsidiary to existing Bid Items.
4. Emailed proposals are allowed. Proposals shall be received prior to 3:00 PM local time, Friday, March 8th, 2024, via hand to the Town of Telluride Public Works Facility: 1370 Black Bear Road, Telluride, or mailed overnight to PO Box 397, Telluride, CO 81435, or emailed directly to Karen Guglielmone:
kguglielmone@telluride-co.gov.
If emailed, please confirm receipt by requesting a delivery receipt and read receipt.
5. Addenda posted to BidNet.
mailto:kguglielmone@telluride-co.gov.
Mobilization (Spring and Fall) 2 EA
Work Item #1 500 Block East Columbia [Maple to Hemlock] East Columbia Avenue (Maple to Hemlock) Area = 910 SY
Description Qty Unit
1. Traffic Control 1 LS
2. Construction Stormwater Management 1 LS
3. Sawcut existing asphalt 66 LF
4. Mill 2 inches of asphalt 910 SY
5. Remove millings to in-town location (TBD) 51 CY
6. Furnish and install 2.5-inches hot bituminous asphalt overlay, complete in place 123 TON
7. Hot Bituminous Pavement Patching (Granding S or SX asphalt) 16 TON
8. Class 6 Compacted Roadbase 35 TON
9. Over-Excavation (if needed) 30 CY
E Columbia Avenue 500 Blk SUBTOTAL - -
Work Item #2 500 Block West Colorado (Davis to Townsend) W Colorado 500 Blk (Davis to Townsend) Area = 3,430 SY
Description Qty Unit
1. Traffic Control 1 LS
2. Construction Stormwater Management 1 LS
3. Sawcut existing asphalt 130 LF
4. Mill 2 inches of asphalt 3,430 SY
5. Remove millings to in-town location (TBD) 191 CY
6. Furnish and install 2-inches hot bituminous asphalt overlay, complete in place 372 TON
7. Hot Bituminous Pavement Patching (Granding S or SX asphalt) 74 TON
8. Class 6 Compacted Roadbase 185 TON
9. Over-Excavation (if needed) 100 CY
W Colorado 500 Blk SUBTOTAL - -
Work Item #3 East Colorado (Pine to Alder) ‐ Fall Season E Colorado (Pine to Alder) Area = 5,500 SY
Description Qty Unit
1. Traffic Control 1 LS
2. Construction Stormwater Management 1 LS
3. Sawcut existing asphalt 130 LF
4. Mill 2 inches of asphalt 5,500 SY
5. Remove millings to in-town location (TBD) 300 CY
6. Furnish and install 2.5-inches hot bituminous asphalt overlay, complete in place 733 TON
7. Hot Bituminous Pavement Patching (Granding S or SX asphalt) 147 TON
8. Class 6 Compacted Roadbase 300 TON
9. Over-Excavation (if needed) 100 CY
E Colorado Pine to Alder SUBTOTAL - -
2024 Street Mill and Overlay Program Bid Schedule
Updated Bid Tab - Addendum No. 1 - 3.1.24
Work Item #4a 400 Block Pandora East Half (Bid Alternate 1 ‐ New Pavement) 400 Block Pandora East Half (Area = 500 SY)
Description Qty Unit
1. Traffic Control 1 LS
2. Construction Stormwater Management 1 LS
3. Sawcut existing asphalt 60 LF
4. Remove Existing Road Surface Materials and Haul Away for Disposal 153 CY
5. Class 6 Compacted Roadbase 138 TON
6. Furnish and Install 5 inches Hot Bituminous Pavement Placement (Granding S or SX asphalt)
136 TON
7. Over-Excavation (if needed) 30 CY
Pandora 400 Blk East half SUBTOTAL - -
Description Qty Unit
1. Traffic Control 1 LS
2. Construction Stormwater Management 1 LS
3. Sawcut existing asphalt 325 LF
4. Remove Existing Road Surface Materials and Haul Away for Disposal 58 CY
5. Class 6 Compacted Roadbase 44 TON
6. Furnish and Install 7 inches Hot Bituminous Pavement Placement (Granding S or SX asphalt)
63 TON
7. Over-Excavation (if needed) 10 CY
600 Block W Colorado Avenue - Widen Travelway by 4 Feet SUBTOTAL - -
Work Item #5 Town Park Town Park (Area = 22 + 2,056 = 2,078 SY)
Description Qty Unit
1. Traffic Control 1 LS
2. Construction Stormwater Management along south ditch 1 LS
3. Sawcut existing asphalt 20 LF
4. For 10 feet west of valley-pan, remove existing asphalt and haul away for Disposal 4 CY
5. For this area furnish and install 6 inches of Hot Bituminous Pavement Placement (Granding S or SX asphalt)
7.0 TON
6. East of valley-pan: remove existing road surface, scarify, and prepare subgrade 571 CY
7. Class 6 Compacted Roadbase 571 TON
8. Furnish and Install 4 inches Hot Bituminous Pavement Placement (Granding S or SX asphalt)
444 TON
9. Over-Excavation (if needed) 350 CY
Town Park SUBTOTAL
Work Item #4b 600 Block W Colorado Avenue ‐ Widen Travelway by 4 Feet (Bid
Alternate 2 ‐ New Pavement on Shoulder) 600 Block W Colorado Avenue ‐ Widen Travelway by 4 Feet (Area = 160 SY)
Work Item #6 100 Blk N Maple 100 Blk N Maple (Area = 570 SY)
Description Qty Unit
1. Traffic Control 1 LS
2. Construction Stormwater Management 1 LS
3. Sawcut existing asphalt 66 LF
4. Mill 2 inches of asphalt 570 SY
5. Remove millings to in-town location (TBD) 32 CY
6. Furnish and install 2-inches hot bituminous asphalt overlay, complete in place 63 TON
7. Hot Bituminous Pavement Patching (Granding S or SX asphalt) 8 TON
8. Class 6 Compacted Roadbase 22 TON
9. Over-Excavation (if needed) 30 CY
N Maple Street 100 Blk SUBTOTAL
Work Item #7 100 Blk N Willow ‐ Fall Season 100 Blk N Willow (Area = 1,016 SY)
Description Qty Unit
1. Traffic Control 1 LS
2. Construction Stormwater Management 1 LS
3. Remove Existing Road Surface Materials and Haul Away for Disposal 310 CY
4. Class 6 Compacted Roadbase 279 TON
5. Furnish and Install 5 inches Hot Bituminous Pavement Placement (Granding S or SX asphalt)
277 TON
6. Over-Excavation (if needed) 169 CY
N Willow Street 100 Blk SUBTOTAL
Mobilization SUBTOTAL =
Work Item #1 E Columbia Avenue 500 Blk SUBTOTAL =
Work Item #2 W Colorado 500 Blk SUBTOTAL =
Work Item #3 E Colorado Pine to Alder SUBTOTAL =
Work Item #4 Pandora 400 Blk East half SUBTOTAL =
Work Item #5 600 Block W Colorado Avenue - Widen Travelway SUBTOTAL =
Work Item #5 Town Park SUBTOTAL =
Work Item #6 N Maple Street 100 Blk SUBTOTAL =
Work Item #7 N Willow Street 100 Blk SUBTOTAL =
TOTAL =