Addendum 1 - QA - Final.pdf
PDF 117 KB Posted
- Attached to
- Engineering Automation Work Order Services
- Solicitation number
- 18-40110-8102
- Issued by
- Dauphin County, Masontown Borough, Pennsylvania
About this file
This document is Addendum No. 1 to RFP #18-40110-8102 for Engineering Automation Work Order Services issued by the Pennsylvania Turnpike Commission (PTC). The RFP requests services for the development of 2D and 3D CAD components, installation and configuration of Autodesk AEC Collection software, integration between CAD and GIS systems, development and maintenance of BIM/CIM and CAD standards, training on design applications, PDF plan review, and GIS data conversion. The RFP includes details on liquidated damages, with the maximum liquidated damages period being 30 calendar days.
The RFP provides responses to 13 proposer questions, covering topics such as the specific CAD and GIS software to be used, the number of user licenses, the intent to develop and maintain standards, the purpose of visualizations, and the anticipated scope of data collection and 3D modeling efforts. The responses indicate the PTC is a Microsoft-based environment using the 2018 version of the Autodesk AEC Collection, with plans to transition to network licensing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP8102 - Engineering_Automation_WOS_Final 2-27-18 + Appendix A to H.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1
RFP # 18-40110-8102
Engineering Automation Work Order Services
Prospective Respondents: You are hereby notified of the following information in regard to the referenced RFP:
REVISION
1. Replace the Liquidated Damages Section on page 4 of 9 of Appendix A – Standard Agreement (24-25 of 48 in the original RFP PDF
File) in its entirety with the following:
Liquidated Damages
(a) By accepting this Contract, the Contractor agrees to the delivery and acceptance requirements of this Contract and its Work
Orders. If a Contract or Work Order schedule is not met, the delay will interfere with the Commission’s program. In the event of any such delay, it would be impractical and extremely difficult to establish the actual damage for which the Contractor is the material cause. The Commission and the Contractor therefore agree that, in the event of any such delay the amount of damage shall be the amount set forth in the Work Order under the Section “Liquidated Damages” and agree that the Contractor shall pay such amount as liquidated damages, not as a penalty. Such liquidated damages are in lieu of all other damages arising from such delay.
(b) The Commission and Contractor agree that the Deliverables identified in the Payment Schedule set forth in the Work Order as “Major Deliverables” (the “Major Deliverables”) shall be those for which liquidated damages shall be applicable in the event of delay of their completion beyond the delivery date specified in the Work Order. If Major Deliverables are not identified in the Work Order, liquidated damages shall apply to the total value of the Work Order.
(c) The amount of liquidated damages for any such Major Deliverable not completed by the deliverable schedule shall be set out in the applicable Work Order. Liquidated damages shall be assessed each calendar day until the date on which the
Contractor completes such Major Deliverable, up to a maximum of thirty (30) calendar days. Contractor may recoup the total amount of liquidated damages assessed against previous Major Deliverables if the Contractor accelerates progress towards future Major Deliverables and meets the final project completion date set out in the Work Order.
(d) If, at the end of the thirty (30) day period specified in “Liquidated Damages - (c)” above, the Contractor has not met the schedule for completion of the Major Deliverable, then the Commission, at no additional expense and at its option, may either:
(1) immediately terminate the Contract and all software, documentation, reports, Developed Materials and any other materials provided for or created for the Commission as a result of this Contract shall be given to the Commission, and the Commission shall be entitled to its remedies under “Termination”; or
(2) order the Contractor to continue with no decrease in effort until the work is completed in accordance with the Contract and accepted by the Commission or until the Commission terminates the Contract. If the Contract is continued, any liquidated damages will also continue until the work is completed.
(e) At the end of the Contract term, or at such other time(s) as identified in the Contract, liquidated damages shall be paid by the Contractor and collected by the Commission by deducting them from the invoices submitted under this Contract or any other contract Contractor has with the Commission, by collecting them through the performance security, if any, or by billing the Contractor as a separate item.
(f) To the extent that the delay is caused by the Commission, no liquidated damages will be applied.
(g) If the delays are caused by the default of a Subcontractor, and if such default arises out of causes beyond the control of both the Contractor and Subcontractor, and without their fault or negligence, the Contractor shall not be liable for liquidated damages for delays, unless the supplies or services to be furnished by the Subcontractor were obtainable from other sources in sufficient time to permit the Contractor to meet the required performance schedule.
QUESTIONS AND ANSWERS
Following are the answers to questions submitted in response to the above referenced RFP as of March 14, 2018. All the questions have been listed verbatim, as received by the Pennsylvania Turnpike Commission.
Proposer Questions
Pennsylvania Turnpike Commission (PTC) RFP #: 18-40110-8102
# Page Section Section Description Proposer Question Commission Response
1. 16 IV 4
Section C
Development of 2D and 3D parts, components, Specifically interested in the types and numbers of subassemblies, sanitary, storm and water parts needed (including structures, pipe types and sizes). Detail specifications for custom parts (shape, dimensions, etc.) what software platform will this be in?
The Level of Effort to determine the types and quantiles of sub-assemblies, stormwater drainage components, etc. will be included in the individual Work Orders issued.
AutoCAD Civil 3D and Revit are the primary design software’s the Commission uses.
2. 16 IV 4
Section C
Development of 2D and 3D parts, components, Can the standards which are to be used for the development of the environment be shared?
Commission Standards are provided only to consultants and contractors on active Commission projects at this time.
# Page Section Section Description Proposer Question Commission Response
3. 17 IV 4
Section D Installation configuration of software
What version of the AEC Collection/Civil 3D? License type (networks/named user)? Data management system for Civil 3D (Autodesk Vault, Data shortcuts, etc.)? How many workstations/users? Network environment type (e.g. Microsoft)?
The Autodesk AEC Collection and Vault are version 2018.
Currently licenses are Standalone with the intent of moving to network Licensing.
Currently there are 7 seats of the AEC Collection.
The Commission is a Microsoft Shop.
4. 17 IV 4
Section E
Development and Support of Integrations between the Commission’s Autodesk
AEC
From the Autodesk AEC Collection Suite of design, what programs specifically are involved and what is the nature of intended integrations between products and ESRI GIS environment?
AutoCAD Civil 3D, Map 3D, Revit and InfraWorks are the software’s that will be used to generate master data to be used in the ESRI GIS platform.
Integrations are intended for sharing CAD data with GIS and GIS data back to CAD.
5. 17 IV 4
Section F
Develop and maintain Commission specific
BIM/CIM, CAD
Is it the intent of the awarded proposer to define themselves and maintain BIM/CIM and Graphics standards on behalf of the Turnpike Commission?
The intent is to assist the Commission in the development of BIM/CIM and Graphics standards by researching industry best practices and assisting with periodic updates.
# Page Section Section Description Proposer Question Commission Response
6. 17 IV 4
Section G Develop and provide training courses and materials for the various Design applications
Which of the AEC Collection products will training materials and web-based training materials need to be created for and in what design context?
Training materials will need to be created for Civil 3D, Map3D, Revit, InfraWorks, ReCap at a minimum.
Manuals will focus on how the software are used by the PTC using PTC standards, styles, etc.
7. 17 IV 4
Section I
Development and support using industry best practices for 2D/3D PDF plan review
What technology is intended to be used for the PDF plan review?
The Commission currently uses Bluebeam Revu for pdf plan review.
8. 17 IV 4
Section M
GIS Data Conversion:
Assist with converting master what percentage of their data has neither milepost or engineering station references?
All data is referenced to a Route and Milepost at a minimum and Station information is included if applicable.
9. PDF
pg.
Section IV-
Tasks (Task G)
For which design applications does the PTC anticipate training? How many engineers/other design staff does the PTC anticipate training?
See Question No. 6 response. The number of trainee’s is anticipated to be 6.
10. PDF
pg.
Tasks (Task P)
Does the PTC expect the on-site person(s) to be full-time/ongoing or intermittent assignments on an as-needed basis?
Presence on-site will be determined by the individual Work Orders issued.
11. PDF
pg.
Tasks (Task J)
What are the intended purposes and audiences of the visualizations?
Visualizations are intended as tools for internal personnel to aide in the design and construction phases of a project and for use at seminars and public meetings.
# Page Section Section Description Proposer Question Commission Response
12. PDF
pg.
Tasks (Task L)
What does the PTC anticipate will be required to deliver this task? Will this volume be determined as part of the Master Technology plan?
The Level of Effort to create and maintain master 3D data sets will be determined by individual Work Orders and as defined by the Master Technology Plan.
13. PDF
pg.
Tasks (Task L)
Is it the PTC’s intent to include building assets in this BIM initiative as well? If so, will this require additional data collection?
The Commission’s BIM initiative is intended to include all infrastructure assets. Collected data may come from various sources.
All other terms, conditions and requirements of the original RFP dated February 27, 2018 remain unchanged unless modified by this Addendum.
File details come from the government source that posted it. Updated .