Addendum 1_PWG126-LANDD-6444.pdf

PDF 429 KB Posted

Attached to
RFP - Environmental Permitting Water Infrastructure Project (Oak Glen) - Birch Creek Cutoff Walls
Solicitation number
PWG126-LANDD-6444
Issued by
San Bernardino County, California

About this file

This is an Addendum 1 to RFP PWG126-LANDD-6444 issued by the State of California for environmental permitting services related to the Oak Glen water infrastructure project, specifically the Birch Creek Cutoff Walls project. The addendum modifies the original request for proposals by clarifying and updating requirements for environmental permitting consulting services necessary to support the design and permitting phases of the cutoff wall construction project. The original deadline for submission of questions was established at 3:00 pm on September 23, 2026, and the addendum serves to provide additional guidance and clarifications to prospective bidders regarding scope modifications, technical requirements, or administrative procedures outlined in the initial RFP.

The addendum provides supplemental information and amendments to the original solicitation terms, ensuring that all bidders have access to consistent and complete project information. This document is critical for bidders to incorporate any changes or clarifications into their proposals and pricing strategies before final submission. Prospective contractors should carefully review the addendum in conjunction with the original RFP documents to ensure full compliance with all current requirements and to avoid proposal deficiencies that could result in disqualification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

September 3, 2026

ADDENDUM NO. 1

RFP No. PWG126-LANDD-6444

Environmental Services for the Water Infrastructure Project (Oak Glen) –

Birch Creek Cutoff Walls

Via e P r o System

Amend the Request for Proposal as follows (Revisions in bold text):

1. Scope of Work V.B. be modified as follows (strikeout indicating deletion, bold indicating additions of text):

2. Section X. – Indemnification and Insurance Requirements Adds: be modified as follows (strikeout indicating deletion, bold indicating additions of text):

The addition of these requirements shall be considered in concert with existing documents in preparation of the proposal.

THE PROPOSER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME

PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL.

Arlene B. Chun, M.S., P.E., Engineering Manager Environmental Management Division

ABC:MC:MM:mm

PROPOSER'S CERTIFICATION

By my signature hereunder, I acknowledge receipt of Addendum No. 1 and I fully understand the intent and detail of

Addendum No. 1, which I have considered in my preparation of the attached proposal.

Proposer's Signature Date