ADDENDUM NO. 1 TO SPECIFICATION NO. R-7253: PUBLIC SAFETY BUILDING ROOF PROJECT
This document is Addendum No. 1 issued by the City of Long Beach, Department of Public Works, Project Management Bureau, dated April 15, 2025, modifying the original specifications for the Public Safety Building Roof Project (Specification No. R-7253). The addendum provides clarifications and changes to the original contract documents and requires bidders to acknowledge receipt by signing and submitting the addendum with their proposals; failure to submit this acknowledgment may result in disqualification. Key modifications include the addition of photographs depicting areas requiring treatment prior to installation of the Fluid Applied Membrane system, identification of additional locations where Simple Seal product or approved equal must be installed, and a change in roof access routing to the East stairwell. The addendum also references a Labor Rate Change 2025-1 and notes that a revised PowerPoint presentation was uploaded to the LongBeachBuys platform on Friday, April 10, 2025.
Prospective bidders are directed to submit all communications regarding the project to John Taylor and Jennifer Magajes at the City of Long Beach Department of Public Works, Office of the City Engineer, Bureau of Engineering, located at 411 W. Ocean Boulevard, 5th Floor, Long Beach, California 90802, with contact available via email at jtaylor@hwlochner.com and Jennifer.Magajes@longbeach.gov. The photographs included in the addendum illustrate specific roof conditions requiring attention, including parapet coping joint sealing, ductwork that requires sealing and protection, ponding water removal and surface drying requirements, chiller corner areas requiring treatment, and moisture conditions beneath equipment installations that must be addressed prior to application of the Fluid Applied System. The City disclaims responsibility for oral interpretations of contract documents made by City employees and does not guarantee accurate transcription of oral questions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Long Beach
Department of Public Works Project Management Bureau 411 W Ocean Blvd. 5th floor, Long Beach, California 90802 p 562.570.6383
April 15, 2025
NOTICE TO PROPOSERS
ADDENDUM NO. 1:
SPECIFICATION No. R-7253 Public Safety Building Roof Project
This addendum changes and supersedes the language in the original Specifications. Please acknowledge receipt of this addendum by signing and submitting with your proposals. Any bidder who fails to submit this addendum may be disqualified.
Please note the following clarifications, additions, or changes:
PHOTOS: Additional photos of areas which will need to be addressed prior to Fluid Applied Membrane being installed. Additional areas where the Simple Seal product or equal approved will need to be installed.
Access to the roof changed to the East stairwell.
Labor Rate Change - 2025-1
Revised Power Point Presentation was uploaded to LongBeachBuys on Friday April 10, 2025.
CONTACT: Before the Bid opening, prospective Bidders shall direct any communications regarding this Work to:
City of Long Beach, Department of Public Works Office of the City Engineer, Bureau of Engineering 5th Floor, City Hall 411 W. Ocean Boulevard Long Beach, CA 90802 Attention: John Taylor / Jennifer Magajes
E-mail: jtaylor@hwlochner.com / Jennifer.Magajes@longbeach.gov mailto:jtaylor@hwlochner.com mailto:Jennifer.Magajes@longbeach.gov
Addendum # 1 – Specification No. R-7253
Communications may be written or oral, but the City is not bound by any oral interpretation of the Contract Documents made by any City employee, nor does the City guarantee the accurate transcription of oral questions.
PREPARED BY: John Taylor
ACKNOWLEDGED BY: __________________________________________________
Company Name
Print Name Title
Signature Date jtaylor Text Box Seal parapet coping joints with Simple Seal or equal approved.
jtaylor Arrow jtaylor Arrow
Arrow
Seal ALL joints with Simple Seal product or equal approved. Include North side of building as well.
jtaylor Arrow jtaylor Arrow
Duct work to be sealed and painted.
jtaylor Arrow
Ponding water will need to be removed and surface dried prior to installing Fluid Applied System.
Ponding water will need to be removed and surface dried prior to installing Fluid Applied System.
Moisture at all four corners of the chiller will need to be addressed prior to applying the Fluid Applied System
Moisture under chiller will need to be addressed prior to applying the Fluid Applied System jtaylor Arrow