This document is Addendum 1 to Invitation to Bid (ITB) 23-180-G for Tubular Steel Pole Structures issued by the Eugene Water & Electric Board (EWEB) in Oregon. The addendum modifies the original bidding documents by allowing EWEB to consider and negotiate milestone payments if requested at the time of bid submission. It also changes the bid submission deadline to 2:00 p.m. (PST) on October 10, 2023. Bidders are required to acknowledge receipt of this addendum by signing and returning a copy or by circling the addendum number on the bid form.
The original ITB 23-180-G solicits bids from companies interested in providing tubular steel pole structures for use in EWEB's Thurston to McKenzie River Crossing Transmission Line project, which is located in Lane County and the City of Eugene, Oregon. No other details about pricing, set-asides, incumbents, funding, or contract terms are provided in the addendum or the related state and local contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 23-180-G Tubular Steel Pole Structures.pdf | ||
| Addendum 2 - ITB 23-180-G Tubular Steel Pole Structures.pdf | ||
| RFPAttF - RESPONSIBILITY INQUIRY~1.doc | DOC document | |
| ITB 23-180-G - BID TAB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1, ITB 23-180-G Tubular Steel Pole Structures
September 15, 2023
ADDENDUM #1
Tubular Steel Pole Structures
ITB 23-180-G
This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.
INVOICING AND PAYMENT
1. EWEB may consider and negotiate milestone payments if requested at the time of bid submission.
CLOSING DATE AND TIME
All references to the closing date and time are changed to the following:
Bid Submission no later than: 2:00 p.m. (PST) – October 10, 2023
This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR BY CIRCLING THE ADDENDUM
NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Kristin Kokkeler, Contract Specialist
The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.
Company Name: ________________________________
Signature: ______________________________________ Date __________________________
End of Addendum