Addendum 1- ITB 23-049.pdf

PDF 179 KB Posted

Attached to
EWEB ITB 23-049-PW Shasta 975 Storage Tanks
Solicitation number
S-P00140-00006189
Issued by
Lane County, Oregon

About this file

This document is an Addendum to Invitation to Bid (ITB) 23-049-PW issued by the Eugene Water & Electric Board (EWEB) for the Shasta 975 Storage Tanks Improvements project. The addendum modifies the original bidding documents and provides clarification on a pre-bid meeting sign-in sheet, as well as responses to questions. The project requires the construction of two 0.5 million-gallon glass-fused-to-steel water storage tanks, site preparation, yard piping, and sediment and erosion control. Bidders must meet specific contractor and subcontractor qualifications outlined in the bid package. The closing date and time for the bid remain unchanged, and the addendum is considered a material change to the bid.

The bid is for a project located in Lane County and the City of Eugene, Oregon. Bidders are required to acknowledge receipt of the addendum by signing and returning a copy or circling the addendum number on the bid form. The addendum provides information about the availability of a lay-down area for storage, which will not be available for this project.

View the file

Other files

File Type Posted
Bid Tab ITB 23-049-PW.pdf PDF
Q-LIFE - NORTH WASCO COUNTY SCHOOL DISTRICT 21.kmz KMZ file
ITB 23-049-PW Shasta 975 Storage Tanks.pdf PDF
Addendum 2-ITB 23-049-Final.pdf PDF
Pre-Bid Sign-in.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum - Nonmaterial Change Rev 4-21-20

April 7, 2023

ADDENDUM #1

Shasta 975 Storage Tanks Improvements

ITB: 23-049-PW

This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.

Addendum No. 1 consists of 2 numbered pages and the following:

1) Prebid Meeting Sign-in Sheet.

2) Questions and Answers:

Q. Will there be a lay down area available to ship and store a tank?

A. A lay down area for storage will not be available.

TECHNICAL ADDENDUM ITEMS:

Item Number Page or Drawing Location and Description of Change

TECHNICAL

SPECIFICATIONS

1.01 00450 Replace 2b in its entirety with:

b. At least one (1) tank presently in potable water service with a clear-span aluminum done, which the General Contractor or Subcontractor (Key Staff experience allowed) has installed and had satisfactory service for not less than five (5) years.

CLOSING DATE AND TIME

The closing date and time will remain unchanged.

This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR

BY CIRCLING THE ADDENDUM NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.

Addendum prepared by:

Wendy Lopez, Purchasing Analyst CC: Laura Farthing

Addendum - Nonmaterial Change Rev 4-21-20

The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.

Company Name: ________________________________

Signature: ______________________________________ Date __________________________