About this file
This document is Addendum No. 1 for Invitation to Bid (ITB) No. 04-25 issued by New Smyrna Beach Utilities (NSBU) for Lift Station 14 Electric Improvements. The addendum provides updated specifications and clarifications for the project, which involves replacing existing electrical equipment at Lift Station 14, including the electrical panel, VFDs, RTU, and associated components. A new bid line item for bypass pumping has been added, and contractors are required to provide a comprehensive bypass pumping plan that ensures continuous wastewater service during construction. The bypass pumping system must operate 24 hours per day, seven days a week, with complete redundancy and backup equipment.
The addendum includes revised specifications for measurement and payment, with a project allowance of $20,000 and detailed instructions for bypass pumping operations. Contractors must submit a detailed bypass plan for NSBU review, including equipment specifications, monitoring logs, and traffic management plans. The existing pumps at Lift Station 14 are KSB model KRTK200-400/646X, with a firm capacity of 2,190 gpm at 73 feet TDH. The contract time is 210 calendar days, which includes material lead times. Contractors will be held liable for any wastewater overflows, with potential fines of $5,000 per occurrence and additional daily fines for prolonged cleanup and restoration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
200 CANAL STREET / P.O. BOX 100
NEW SMYRNA BEACH, FL 32170-010
ITB # 04-25
LIFT STATION 14 ELECTRIC IMPROVEMENTS
DATE: January 31, 2025
RE: ITB No. 04-25 ADDENDUM NO. 01
NSBU is issuing the following addendum. As such it becomes an integral part of the proposal and must be acknowledged by the return of this signed form, with your proposal form, acknowledging receipt of the addendum.
Attachments:
A. Revised Bid Tabulation – Revisions are shown in red
B. Revised Specification 01025 – Measurement and Payment: to account for additional bid item #4, Bypass Pumping
C. Added Specification 11312 – Collection System Bypass
D. NSBU Control Panel Bill of Materials
STATEMENT FROM NSBU: BIDDERS shall utilize the revised bid tabulation attached to this
Addendum. Per Note #5 from the General Notes: CONTRACTOR SHALL INCLUDE IN BID
NECESSARY BYPASSING AND IS FULLY RESPONSIBLE FOR SYSTEM BYPASSING
DURING LIFT STATION CONSTRUCTION.
A bid line item has been added to the bid tabulation to cover bypass pumping costs. Bypass
Pumping shall include furnishing, operating, maintaining, repositioning, removing, etc. a duplex bypass sewer pumping system continuous, twenty-four hours per day. The pumps shall adhere to sound attenuation industry standards and conform to the City of New Smyrna Beach’s code ordinance for sound.
• NSBU will only allow bypass to be put in place when all materials are approved & delivered and Contractor is ready to start construction.
• The current contract time is 210 calendar days which includes material lead times. The
Notice To Proceed will account for the material lead times. The bypass costs shall not include material lead times and shall only be occurred during construction.
BIDDER questions are in black. COMMISSION responses are in blue.
1. Please provide pump data and curves.
The existing Pumps in Lift Station 14 are manufactured by KSB, Model Number KRTK200-400/646X, 77 HP, 1,190 RPM, 460V Three Phase. The designed operating point of these pumps are 2,190 gpm at 73 feet TDH. These pumps were installed in 1999.
2. What is the flow rate into the wet well? Peak and daily NSBU recently conducted a draw down at Lift Station 14.
One Pump @ 16psi had a flow rate of 1,500 gpm Two Pumps @ 26psi had a flow rate of 2,000 gpm
3. Can we access site from right away by drainage ditch?
The access for Lift Station 14 is a drive entrance off of Wayne Ave. Contractor will be required to obtain approval from adjacent property owners should Contractor want to access Lift Station 14 site from other than the drive entrance.
4. Do you have a preferred vendor for the control panel? Also do you have a preferred vendor for the RTU/SCADA?
See attached NSBU Control Panel Bill of Materials. NSBU utilizes Data Flow for
RTU/SCADA.
A Copy of This Signed Form Must Accompany Your Proposal
Acknowledgment of Receipt of Addenda No. 1
Company_______________________________________
Title___________________________________________
Signature_______________________________________
/40404/5#61487606 v2
NEW SMYRNA BEACH UTILITIES
BID TABULATION
BIDDER NAME:
SIGNATURE:
Item No.
Description Quantity Unit Unit Price Total
Furnish and Install Electrical, Instrumentation and Control
Panels, and Systems
1 LS $ $
Site Improvements (to also include General
Requirements, Mobilization, Demo, Survey, As-Built and
Final Restoration, etc.)
1 LS $ $
3 Project Allowance 1 LS $ 20,000.00 $ 20,000.00
4 Bypass Pumping 1 LS $ $
TOTAL NUMERIC BID COST $
TOTAL WRITTEN BID COST:
See Specifications for More Detailed Measurements and Payment information.
The Project Allowance shall be included in the total bid cost and returned to Commission if not used. Allowance funds are available for minor discrepancies between field conditions and the plans and specifications and may be used to adjust for quantity changes to listed bid items. Commission will not pay for unforeseen work caused by carelessness or disregard. Work under this bid item requires Commission approval. Monies will be paid for actual work completed. The use of these funds must be requested in writing from the Bidder to Commission’s designated Project Manager.
Such requests must include support for the use of funds and must be approved by the Commission’s Project Manager and Director of Engineering.
The as-built drawings shall be approved by the Engineer of Record. A hard copy of the as-built, signed and sealed by Surveyor, shall be submitted to the Commission along with pdf and CAD digital files. An approved as-built is required for to Final Completion.
BIDDERS must sign BID FORM.
MDT/jm/specs/01025 Addendum No. 1 Tt #200-08460-24008 01025-1 013125
SECTION 01025
MEASUREMENT AND PAYMENT
PART 1 – GENERAL
1.01 DESCRIPTION
A. The Contractor shall receive and accept the compensation provided in the Proposal and the Contract as full payment for furnishing all materials, labor, tools and equipment, for performing all operations necessary to complete the work under the Contract, and also in full payment for all loss or damages arising from the nature of the Work, or from any discrepancy between the actual quantities of work and quantities herein estimated by the Engineer, or from the action of the elements or from any unforeseen difficulties which may be encountered during the prosecution of the Work until the final acceptance by the Owner.
B. The prices stated in the Proposal include all costs and expenses for taxes, labor, equipment, materials, commissions, transportation charges and expenses, patent fees and royalties, labor for handling materials during inspection, together with any and all other costs and expenses for performing and completing the Work as shown on the Drawings and specified herein. The basis of payment for an item at the unit price shown in the Proposal shall be in accordance with the description of that item in this Section.
C. The Contractor's attention is again called to the fact that the quotations for the various items of work are intended to establish a total price for completing the work in its entirety. Should the Contractor think that the cost for any item of work has not been established by the Bid Form or Payment Items, he shall include the cost for that work in some other applicable bid item, so that his proposal for the Project does reflect his total price for completing the Work in its entirety.
1.02 MEASUREMENT
A. The quantities for payment under this Contract shall be determined by actual measurement of the completed items, in place, ready for service and accepted by the Owner, in accordance with the applicable method of measurement therefore contained herein.
1.03 PAYMENT ITEMS
A. The following will clarify the work included for bid items in the Pay Items Sheet:
1. Furnish and Install Electrical, Instrumentation and Control Panels, and Systems:
(Bid Item No. 1)
a. Measurement for this item will not be made for payment and all items shall be included in the lump sum price.
Tt #200-08460-24008 01025-2 013125
b. Payment for this item will be made at the Contract lump sum price, which includes all labor, materials, equipment, testing, coordination, training, and work required to remove and replace all the electrical equipment including but not limited to: Main Disconnect, Pump Control Panel, VFDs, Mini Power Zone, Antenna, and all associated conduit and wiring at the pump stations. Payment will be based on percentage of work completed during the pay period at time of pay application to the nearest 10% complete. The cumulative total shall not exceed the Lump Sum bid pay item amount.
2. Site Improvements: (Bid Item No. 2)
a. Measurement for this item will not be made for payment, and all items shall be included in the Contract lump sum price.
b. Payment for this item will be made at the Contract lump sum price for the item, which price and payment shall be full compensation for: the preparatory work and operations in mobilizing for beginning work on the Project including, but not limited to, those operations necessary for the movement of personnel, equipment, supplies and incidentals to the project site, and for the establishment of field office, building, safety equipment and first aid supplies, sanitary and other facilities, as required by these Specifications, and state and local laws and regulations; and any other pre-construction expense necessary for the start of the Work; the cost of permits and fees, construction schedules, preconstruction video and photographs, project signs, shop drawings, temporary facilities, laydown storage area, construction aids, work associated with contractor support during Owner/Engineer reviews and inspection, re-inspections and any re-work resulting from same, cleaning, project records documents, and operation and maintenance data.
c. Full compensation for all insurance requirement costs, the cost of all bonds, permits, and all administrative costs associated with acquiring and maintaining the necessary coverage as described in the Contract Documents. This item will be paid upon each payment request made by the Contractor. The Contractor shall attach with the pay request invoices to substantiate that the Contractor has obtained appropriate insurance and bonds.
d. Full compensation for all labor, materials, and equipment necessary to physically locate all utilities in the immediate area using non-destructive digging equipment, supplies and personnel experienced in the use of subsurface utility engineering (SUE) to determine precise horizontal and vertical positions of all utilities within the project limits, shall also include providing surveying, layout and field staking, including replacement/restoration of any damaged/removed items. The Contractor shall perform utility locates at least 21 calendar days in
Tt #200-08460-24008 01025-3 013125 advance of construction in order to request clarification if required from the Engineer. The Engineer will have 7 calendar days to respond. This construction scheduling will allow all necessary decisions to be made prior to the contractor’s crews reaching the work area and having a delay claim and/or a crew mobilization/demobilization claim.
e. The work includes equipment to paint/mark the approximate position of the public or private underground utility, vacuum excavation equipment that includes air tools (water jet, air lance) to break up the surface and soil. The vacuum excavation equipment involves removing the disturbed soil and temporarily storing it. The exposed underground utility is examined and pertinent data such as size, type, material, and depth is gathered. A marker such as an iron rod and cap or nail and disk are placed next to the test hole and the depth measurement is taken to this point. The stored soil is then returned to the excavated test hole and the surface is returned to its original state; asphalt patch is tamped into the hole when applicable. Markings such as paint and/or lathe and ribbon are left near the hole for future identification. Assume all lines to be located are active lines and service must be maintained at all times possible.
f. Full compensation for all labor, materials, and equipment for all necessary stormwater management, site dewatering, which includes preventing siltation of receiving waters from dewatering activities, storm water, etc. Installation, maintenance and removal of silt barriers and inlet protection, turbidity barriers, including all labor, materials, equipment, and other incidentals necessary to complete the item, as shown in the Drawings, and specifically, the erosion control plans. Any costs to repair and/or replace damaged items will be included under the payment for stormwater pollution prevention.
g. Full compensation for all labor, materials, and equipment necessary as outlined in Section 02920, including but not limited to the removal and resetting of any private or public signs, markers, mailboxes, fences and other appurtenances, filling and final grading of all areas within the project, final grading of disturbed areas (to provide positive drainage), replacement of irrigation systems and piping, removal of trees, bushes, shrubs, mulch, and other vegetation, disposal of debris, erosion control, tree protection barriers, sodding, seeding, mulching, hauling, watering, fertilizing, protecting, miscellaneous landscaping, and all labor, materials, equipment, and other incidentals necessary to complete the item. Also includes cutting-in, rolling, and maintenance of sod until project final completion. Any costs to repair and/or replace damaged items will be included under the payment for this item.
h. Full compensation for the all labor, materials, equipment services, removal of debris from site, cleaning, transportation, and appropriate disposal of all items not retained by Owner which generally includes
Tt #200-08460-24008 01025-4 013125 concrete slabs, and any additional demolition shown on the Drawings but not mentioned herein. Payment will be based on percentage of work completed during the pay period at time of pay application to the nearest 10% complete.
i. Full compensation for all materials and installation of the gravel and geomembrane liner per plan.
j. The Contractor shall submit invoices substantiating the cost of this item with each pay request. The cumulative total shall not exceed the Lump Sum bid pay item amount.
3. Project Allowance: (Bid Item No. 3)
a. Measurement for this item will not be made for payment, and all items shall be included in the Contract allowance.
b. Payment for this item will be made up to the Contract allowance value for the item as services are required and price is agreed upon by Owner and Engineer in writing prior to completing services, which price and payment shall be full compensation for all labor, materials, and equipment necessary for any unknown activities associated with utility improvement activities, that will be required by the Owner that were not included in the Contract Documents. Items for this bid item will not be made for payment without written authorization from the Owner.
4. Bypass Pumping: (Bid Item No. 4)
a. Measurement for this item will not be made for payment, and all items shall be included in the lump sum price.
b. Payment for this item will be made up to the Contract lump sum price for the item, which price and payment shall be full compensation for:
furnishing all labor, materials, equipment as necessary for bypass operations and contingency plan as depicted in Specification 11312, and as required to operate bypass pumping operations for 24 hrs./day, 7 days/week (including weekends and holidays) with backup auto-dialer for emergency situations, including pumps, piping and hoses, pumper trucks, temporary bypass and service piping, hauling and proper disposal of wastewater, plugging, gasoline/diesel fuel, protection of existing facilities, utilities, and property, traffic maintenance, signs and barriers, and all incidental work required to satisfactorily complete this item.
c. Payment will be based on percentage of work completed for the bid item as follows: 50% payment will be made on setup, startup, and acceptance of the bypass pumping system; the remainder of payments based on percentage equally divided over the remaining duration of project. The cumulative total shall not exceed the bid price amount.
Tt #200-08460-24008 01025-5 013125
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXECUTION (NOT USED)
END OF SECTION
MDT/pt/specs/11312 Addendum No. 1 Tt #200-08460-24008 11312-1 013125
SECTION 11312
COLLECTION SYSTEM BYPASS
PART 1 – GENERAL
1.01 THE REQUIREMENT
A. The Contractor shall provide a collection system bypass in accordance with section 2.7 and of the New Smyrna Beach Utilities (NSBU) Wastewater Rules, Design and Construction Specifications.
1.02 SCOPE OF WORK
A. The work covered by this Section consists of providing all temporary bypassing to perform all operations in connection with the flow of wastewater around pipe segment(s) or lift stations. The purpose of bypassing is to prevent wastewater overflows and provide continuous service to all wastewater customers. The Contractor shall maintain wastewater flow in the construction area in order to prevent backup and/or overflow and provide reliable wastewater service to the users of the wastewater system at all times. Temporary bypass is required at multiple locations through the project duration.
PART 2 – PRODUCTS
2.01 GENERAL
A. The Contractor shall provide and maintain adequate equipment, piping, tankers, and other necessary appurtenances in order to maintain continuous and reliable wastewater service in all wastewater lines as required for construction. Bypass pumping operations to be conducted by manned supervision, unless otherwise specified, 24 hours per day (including weekends) and backup emergency auto-dialer installed. The Contractor shall have tankers, backup pumps, backup generators, piping, and appurtenances ready to deploy immediately.
B. Bypass pumps shall be skid mounted diesel pumps/systems as manufactured by Thompson Pumps, Godwin Pumps, Rain for Rent, or an approved equal.
C. Blocked gravity lines shall include two (2) line stops, one (1) primary and one (1) redundant.
D. Bypass equipment shall include a discharge flow meter and multiple pressure gauges.
E. Bypass plan/systems shall have complete redundancy and shall include one (1) back-up pump equal to the primary.
Tt #200-08460-24008 11312-2 013125
PART 3 – EXECUTION
3.01 GENERAL
A. The Contractor shall have scheduled delivery of all materials, equipment, and labor necessary to complete the repair, replacement, or rehabilitation to the job site prior to isolating the gravity main segment, manhole, or pump station. The Contractor shall demonstrate that the pumping system is in good working order and is sufficiently sized to successfully handle flows by performing a test run for a period of 48 hours prior to beginning the Work. The bypass pumping system shall be sized to pump a minimum firm capacity as indicated below:
Lift Station Firm Capacity (GPM) TDH
14 2,190 73
3.02 TRAFFIC CONSIDERATIONS
A. The Contractor shall locate bypass pumping suction and discharge lines so as to not cause undue interference with the use of streets, private driveways, and alleys. This requirement may necessitate temporary trenching of piping adjacent to the existing sidewalk. Ingress and egress to adjacent properties shall be maintained at all times.
Ramps, steel plates or other methods shall be deployed by the Contractor to facilitate traffic over surface piping. High traffic commercial properties may require alternate methods.
3.03 BYPASS PLAN
A. The Contractor shall submit a comprehensive written plan according to Specification 01340: Shop Drawings, Working Drawings, and Samples, that describes the intended bypass for the maintenance of flows during construction. The Contractor shall also provide a sketch showing the location of bypass pumping equipment for each pump station or line segments around which flows are being bypassed. The plan shall include any proposed tankers, pumps, bypass piping, backup plan and equipment, work schedule, monitoring log for bypass pumping, monitoring plan of the bypass pumping operation and maintenance of traffic plan. The Contractor shall cease bypass operations and return flows to the new and/or existing sewer when directed by the City. All piping shall be designed to withstand at least twice the maximum system pressure or a minimum of 50 psi, whichever is greater. During bypassing, no wastewater shall be leaked, dumped, or spilled in or onto, any area outside of the existing wastewater system. When bypass operations are complete, all bypass piping shall be drained into the wastewater system prior to disassembly.
3.04 BYPASS OPERATION
A. NSBU shall review and provide written comments to the bypass plan prior to implementation of the bypass. The Contractor shall plug off and pump down the sewer manhole or line segment in the immediate work area and shall maintain the wastewater system so that surcharging does not occur.
Tt #200-08460-24008 11312-3 013125
B. NSBU shall accept the bypass plan prior to implementation of the bypass. Contractor will plug off and pump down the sewer manhole or line segment in the immediate work area and will maintain the wastewater system so that surcharging does not occur. A successful 2-day test period shall be performed during NSBU workdays (no weekends). If the Contractor is unable to isolate the system prior to installation of the temporary bypass connection, then a wet tap will be required at the expense of the Contractor.
C. Where work requires the line to be blocked beyond Normal Working Hours and bypass pumping is being utilized, the Contractor shall be responsible for on-site monitoring the bypass operation 24 hours per day, 7 days per week, by on-site personnel, unless otherwise specified. Additionally, back-up emergency auto-dialer installation is required.
D. During bypassing, no wastewater will be leaked, dumped, or spilled in or onto, any area outside of the existing wastewater system.
E. The Contractor shall ensure that no damage will be caused to private property as a result of bypass pumping operations. The Contractor shall complete the work as quickly as possible and satisfactorily pass all tests, inspections and repair all deficiencies prior to discontinuing bypassing operations and returning flow to the sewer manhole, line segment, or lift station.
F. The Contractor shall immediately notify NSBU should a sanitary sewer overflow occur, and the Contractor shall take the necessary action to clean up and disinfect the spillage to the satisfaction of NSBU, FDEP, and/or another governmental agencies. If sewage is spilled onto public or private property, the Contractor shall wash down, clean up and disinfect the spillage to the satisfaction of NSBU, FDEP, and/or another governmental agencies. When bypassing, complete redundancy is required. One back-up pump equal to the primary unit shall be required. Bypass pumps and motors shall have a maximum rating of 55 decibels at 20 feet for sound attenuation.
G. Contractor shall provide secure temporary fencing around all bypass pumping equipment. NSBU shall be given keys to access the bypass equipment.
3.05 CONTRACTOR LIABILITY
A. The Contractor shall be responsible for all required pumping, equipment, piping, and appurtenances to accomplish the bypass and for any and all damage that results directly or indirectly from the bypass pumping equipment, piping and/or appurtenances. The Contractor shall also be liable for all NSBU personnel and equipment costs, penalties and fines resulting from sanitary sewer overflows. In addition to the aforementioned costs to be paid by the Contractor, a fine of $5,000 per overflow occurrence or sanitary sewer disruption shall be assessed. For each 24-hour period following overflow that the wastewater overflow/damage is not completely cleaned, disinfected, and returned to full operational capacity an additional $5,000 fine will be assessed daily. It is the intent of these specifications to require the Contractor to establish adequate bypass pumping as required regardless of the flow condition.
END OF SECTION
NEW SMYRNA BEACH UTILITIES
| A Copy of This Signed Form Must Accompany Your Proposal |
| Acknowledgment of Receipt of Addenda No. 1 |