ADDENDUM #1 - GCI Parking Lot Phase 2 - 3-17-2026 (002).pdf

PDF 233 KB Posted

Attached to
GCI Parking Lot Phase II
Solicitation number
RFP GIS 260000001443 3
Issued by
Genesee County, Michigan

About this file

This is Addendum #1 to the construction bidding documents for the Genesee Career Institute Parking Lot Phase 2 project issued by the Genesee Intermediate School District in Michigan on March 17, 2026. The addendum incorporates clarifications and modifications to the original construction plans and specifications, including revised site grading in two locations to improve drainage toward roadside ditches near the main sign at Torrey Road and south of the entrance drive, and instructions to stockpile asphalt millings on site near the salt barn. The addendum confirms that pre-bid meeting minutes and a sign-in sheet are included, with subsequent addenda to be issued via email. The document addresses contractor inquiries regarding asphalt binder type, light pole base disposal, and site-specific construction requirements, with page number offsets of eight pages for bid documents purchased after the addendum date.

The addendum provides detailed specifications for project components including indoor/outdoor rated fiber cable terminating into the building, Tier 15 heavy-duty Quazite boxes with a 15,000-pound load rating placed on a minimum six inches of crushed rock with specified backfill procedures, and camera installation accessories including pole-mounted junction boxes and network switches for power conversion. Fiber-optic conduit specifications, camera mounting specifications, and camera aiming responsibilities are clarified, with the installing vendor responsible for working remotely with the local IT team for camera adjustment. All bidders are required to acknowledge receipt of this addendum on Article 5.03.A of the bid form Schedule of Unit Prices. The document was prepared by ROWE Professional Services Company located in Flint, Michigan.

View the file

Other files

File Type Posted
Advertisement for Bids.pdf PDF
GCI Parking Lot Phase 2 - ADDENDUM 2 - 3-20-2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

Genesee Career Institute Pavement Replacement Phase 2 Project

Genesee Intermediate School District March 17, 2026

The following clarifications and additions are to be incorporated into the construction plans, bidding and contract documents:

1. The minutes from the pre-bid meeting and sign-in sheet are included with this addendum. Please note:

• Addenda shall be issued via email unless only a fax number is provided upon purchase of bidding documents.

• Contractor questions and Owner responses are included in the minutes. There are questions and responses regarding asphalt binder type, and light pole base disposal.

• With the addition of this addendum, and bid documents purchased after the date of the addendum will offset the page numbers referenced on the meeting minutes by 8 pages.

2. Added notes regarding re-grading two areas on the site to drain to the roadside ditch. One location is by the main sign near Torrey Road. The other location is the area south of the entrance drive. See revised sheet 7 of the plans.

3. Added note regarding keeping asphalt millings on site and stockpiling them in the vicinity of the salt barn. See note #9 under the “Removal Notes” on revised sheet 7 of the plans.

The following is a list of questions submitted by bidders, with answers following.

4. Do you have a specification for the 6 strand single mode fiber?

Answer: There is no specification. The fiber shall be indoor/outdoor rated fiber cable per keynote #6 on sheet EPS.10.

5. Drawing EPS.10 shows a 3" conduit with a pull string from the building to the Quazite box for camera data. Is this correct? Or should the fiber runs be extended into the building?

Answer: Fiber should be terminated into the building.

6. What accessories will be provided with the Owner supplied cameras?

A. Are mounting brackets provided?

Answer: Yes

B. Do the cameras accept direct fiber connection?

Answer: No, Owner will use a small network switch at the pole to convert to CAT6/PoE.

C. Will pole mounted cameras require pole mounted junction boxes to house power converters (120vac-24v)?

Answer: Yes, we will need power for the small network switch.

D. Who is responsible for aiming and adjusting camera views?

Answer: Installing vendor will work with local IT Team remotely to aim cameras.

7. Do Quazite boxes require any specific back fill?

Answer: The Quazite boxes shall be placed on top of a minimum of 6 inches of crushed rock. Backfill on sides can be native clean non-organic material, crushed rock, or gravel manually tamped in 6- to 8-inch-thick layers to 95 percent compaction.

8. Do Quazite boxes require a specific load rating?

Answer: The Quazite boxes shall be Tier 15 heavy duty, which have a load rating of 15,000 pounds.

Each bidder must acknowledge receipt of this addendum on Article 5.03.A on page 3 of the bid form (Exhibit D – Schedule of Unit Prices).

***END OF ADDENDUM***