This is Addendum 1 to an Invitation to Bid (ITB) issued by the Eugene Water & Electric Board (EWEB) for a five-year ductile iron pipe supply contract (RFP #26-012-G). The addendum extends the original proposal closing date from February 16, 2026, to February 17, 2026, at 2:00 PM PT. The procurement requires supply of ductile iron pipes ranging from 4-inch to 24-inch diameter in Tyton and TR Flex joint configurations, with estimated annual quantities varying by pipe size from 18 feet for specialty items to 8,010 feet for 8-inch pipe. All pipes must be new, unused, and manufactured in compliance with AWWA C151 specifications. Questions regarding the bidding documents were due by February 9, 2026, with addenda posted by February 11, 2026. The contract term extends five years with flexible ordering provisions allowing EWEB to adjust quantities and add or delete items during the contract period. Lead times for truckload orders are specified as four weeks for Tyton 12-inch and smaller pipe, eight weeks for 16-inch to 24-inch Tyton pipe, and ten weeks for TR Flex pipes of all sizes.
The procurement is restricted to three approved manufacturers: American, U.S. Pipe, and McWane. Evaluation criteria total 200 possible points, distributed across pricing (80 points), pricing increase management (60 points), delivery timeline management (20 points), and contract term compliance (40 points). Bidders may select a fixed 4% annual price increase or propose alternative increases with detailed supply chain justification, with potential bonus points for commitments below 4%. Contractors must confirm purchase order receipt within 24 hours and provide a comprehensive ten-year warranty. EWEB requires standard commercial insurance coverage, including $1,000,000 per occurrence commercial general liability insurance, automobile liability coverage, and workers' compensation as mandated by Oregon law. No guaranteed minimum or maximum order quantities are specified. The addendum constitutes a material change to the bid, and bidders must acknowledge receipt by signature and return a copy with their response or by circling the addendum number on the bid form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FOR BID SITE Ex 1 Sample Contract 26-012-G.doc | DOC document | |
| 26-012-G Ductile Iron Pipe.pdf | ||
| Notice of Intent to Award-All Bidders~5.pdf | ||
| Addendum 2-Extension~2.pdf | ||
| Bid Opening Tab - RFP 26-012-G.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 4-21-20
February 2, 2026
ADDENDUM # 1
Ductile Iron Pipe
RFP # 26-012-G
This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.
CLOSING DATE AND TIME
Closing date is extended to Tuesday, February 17, 2026 (from 2-16-26).
This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE
ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR
BY CIRCLING THE ADDENDUM NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Sandra Hahn, Purchasing Contact
The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.
Company Name: ________________________________
Signature: ______________________________________
Date __________________________
End of Addendum