This is Addendum No. 1 to the specifications for a solicitation issued by the Minnesota Department of Natural Resources for tile work at St. Croix State Park. The project involves the supply and installation of ceramic tile in the women's bathroom located at the All Seasons Trail Center, one mile north of park headquarters. The original bid opening date of January 15, 2026, at 2:00 PM has not changed. Bidders must respond to the latest version of the project event to acknowledge the addendum and avoid bid rejection. Site visits can be arranged by contacting project manager Rick Dunkley or Operations Supervisor Josh Zaudtke at (320)-280-7881. All responses must be submitted electronically through the Swift Portal, with no email or faxed submissions accepted.
Addendum No. 1 provides clarifications regarding project specifications and the scope of work. The restroom is heated and can be locked during contractor work to secure materials. Department staff, including a Carpenter or Building Utility Mechanic, will conduct daily inspections and oversee waterproofing application and all work progression. The contractor is responsible only for tile purchase and installation; department staff will handle installation of new partitions, toilets, and other fixtures. Durarock will be installed flush to the block walls, with tile adhered to both block and concrete. The department will patch the concrete floor prior to contractor commencement. Waterproofing will be applied to all floors and walls where tile will be installed. Unit pricing must include all labor, materials, tools, transportation, equipment, and applicable taxes. The award will be made to the lowest responsible vendor meeting all specifications and terms, with the state reserving the right to award items separately or by grouping as deemed advantageous.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MINNESOTA
DEPARTMENT OF NATURAL RESOURCES
ADDENDUM NO. 1 to the Specifications
FOR
St Croix State Park Women’s Bathroom Tile REBID Solicitation No. 2026-566
Original Opening Date: January 15, 2026
Original Opening Time: 2:00 PM
THE BID OPENING DATE HAS NOT CHANGED.
SCOPE OF ADDENDUM
REGARDING: Exhibit F – Project Specifications – Additional Information
INCLUDE:
1. Is the restroom heated?
a. The restroom is heated and can be locked while the contractor is doing the work so materials are safe when they aren't on site.
2. As for the waterproofing, is there someone who does an inspection after it is applied and before the tile work can bring?
a. Our Carpenter or Building Utility Mechanic will be checking in on the contractor and will review all work as it progresses. This includes the waterproofing.
3. Are there other inspections throughout the job?
a. Staff will be on site daily to answer questions and inspect operations.
4. Does the park operations staff put the doors/partitions back on the stalls?
a. Our staff will install new partitions, toilets, etc. The only work required of the contractor is tile purchase and installation.
5. Is the sheetrock and or Durarock being installed on the wall going to the concrete floor or will it be sitting on the block and poured curb walls. If setting on top the tile then, at the floor 8" up, will adhere to the concrete or block.
a. The Durarock is being installed and will sit on the block (flush) and tile will be adhered to the block and concrete.
6. Will the concrete floor have been fixed of all the big chunks that have been taken out by the jackhammer or is this the minor floor and wall repair that it talks about in the Project Specifications?
a. The concrete floor will be patched by our staff prior to the contractor starting.
7. How far do you want to go with the waterproofing; shower walls all the way up, all of the floor, and the walls to where the tile stops.
a. Waterproofing will go on all of the floor and where the tile stops.
Addendum prepared by: Project Supervisor/Contract Officer Date: 01/09/2026
Approved: ______Anne Folz____________________________________ Date: _1/09/2026 Delegated Buyer
This addendum shall become part of the bid.
Bidders must respond to latest version of project event to acknowledge the addendum.