Addendum 1 dtd 3-28-2023.pdf
PDF 2 MB Posted
- Attached to
- CBJTC Gas Station Re-Bid, Starke, FL
- Solicitation number
- ITB-04366
- Issued by
- Clay County, Florida
About this file
This document is an addendum to a solicitation issued by the Florida Army National Guard's Construction & Facility Management Office for the CBJTC Gas Station Re-Bid project located in Starke, FL. The project involves the construction of a new unmanned gas station, including two pump islands with four above-ground tanks, a new fuel canopy, a 6'x8' shed, and two dry retention ponds. The solicitation has a bid opening date of April 11, 2023, at 2:00 PM. The estimated cost of construction is $1,367,000. The addendum provides clarification on several technical questions related to the electrical equipment, conduit materials, and trenching requirements. It also confirms that the contractor will be responsible for obtaining all necessary permits, except for the State Fire Marshal permit, which will be obtained by the Owner.
The solicitation is open to qualified licensed contractors in the State of Florida. Contractors subject to licensure or certification under Chapters 399, 455, 489, and 633 of the Florida Statutes must submit qualification data with their bid. The construction contractor will be responsible for obtaining and paying for all building permits, except for the State Fire Marshal permit, which will be obtained and paid for by the Owner.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 3 FNG5085.pdf | ||
| Exhibit 1 ITB.pdf | ||
| Exhibit 4-5 Proposal SubList.pdf | ||
| Non Techs Level Spec 4 5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Army National Guard
Construction & Facility Management Office
ISSUED ADDENDUM
Rev. 11/2018
Date 3/28/2023
ADDENDUM Number #1
Project Number and Name 222011 CBJTC Gas Station Re-Bid
Invitation to Bid Date February 23, 2023
Number of Attachments 1
Bid Opening Date and Time April 11, 2023 (2:00 PM St. Augustine, Unchanged)
From: Department of Military Affairs, CFMO Contracting Office
This addendum and the listed attachments forms a part of the contract documents and modifies the original bidding documents. Acknowledgement of this addendum in Exhibit 4 - Bid Proposal form is required.
Concerns with this addendum should be addressed to:
ng.fl.flarng.list.cfmo-contracting@army.mil
Answers to Questions
Q1. Sheet C02.01 Note 16 calls for a Pre-Fabricated Electrical Equipment Shed, This has the Panel A, Panel G, & E-Stop Contactor inside which I would assume comes with it, but sheet E6.0 One Line Diagram appears as if the fuel EC supplies these items. Please advise.
A1. The electrical gear and air conditioning equipment will be furnished and installed in the prefabricated building by the contractor.
Q2. Will Standard GRC 1st and last 10’ w/ PVC SCH 40 in between be acceptable?
A2. Yes, this is acceptable
Q3. Will any enclosure be required to be stainless steel?
A3. No, none of the required enclosures need to be stainless steel.
Q4. Do we need to install footers for canopy if this section is not awarded?
A4. Yes, the footers should be included in the base bid along with the conduits. The footer design for bidding should come from the contractors alternate bid for the canopy. (Supplied by their canopy supplier) mailto:ng.fl.flarng.list.cfmo-contracting@army.mil
Q5. Would a directional bore be an option for the communications conduit to the building?
A5. YES, Directional bore is preferred by the Department.
*If trenching cut method is used, the contractor will perform compaction testing when installed. The testing standards would be Florida Department of Transportation DOT standards section 125 that are used on state highways. This information is available on the Florida DOT website. The contractor shall submit their patch/cut design for approval if cuts are going done. See attached FDOT Trench Patch Detail.
Q6. Do we need to pull wire in conduits for canopy if not awarded?
A6. No wire should be pulled through the canopy conduit in the base bid., wiring should be included with the canopy as an alternate.
Attachment List
1. Addendum #1
2. Pre-Bid Sign In Sheet and Agenda
3. Pre-Bid Meeting Minutes
4. FDOT Trench Patch Detail
END OF ADDENDUM #1
SIGN IN SHEET
Meeting Subject Pre Bid Meeting
Project Number and Name 222011 CBJTC Gas Station Re-Bid
Date and Time March 8, 2023 (10:00 AM)
Name Firm / Directorate Email Address Phone
Arf;-e~
D,+\J, J> e_;r"' i up. Alt-, 1aer"F"'J@) 1rb(Dl) f' . NfT
(c; {~6 {1\;~Gltd . '-' .Poi/~ . N FbfJ-. Atf-\
Wes t"" (\.._ il4~ 1T 4~
~ {3, '?~'7q 3 l~
35";>.-73l-06 )o ff of J ?~r ~ ft>16 t;d
Name Firm / Directorate Email Address Phone fi,1s tllw/!-<; e/>1it;,,Jt')tMr }0«P <:,gcJ-w. (_ow\ 72..7
.SP-htt'-o lNll~Q '1 ~t./2 - l'L 1(J I I I
PRE-BID SITE VISIT MEETING AGENDA
Rev. 12/2018
Date March 8, 2023
Project Number and Name 222011 CBJTC Gas Station Re-Bid
Project Location Camp Blanding Joint Training Center, Starke, Florida
Last Day for Questions March 22, 2023
Date for Final Addendum March 28, 2023 (tentative)
Bid Opening Date April 11, 2023 (2:00 PM St. Augustine)
1. SIGN IN OF ATTENDEES.
2. INTRODUCTIONS.
3. GENERAL PROJECT DESCRIPTION (see bid documents for complete details).
4. SITE CONDITIONS. Prospective bidders shall examine the site for conditions under which the work is to be done before submitting their bid package. No allowance will be made for extra expenses incurred due to noncompliance with this section.
5. Work Schedule. Monday through Friday _______ to _______. All after-hours work
(including weekend and/or holidays) or schedule changes must be coordinated with and approved by the Project Manager.
The Florida National Guard works on an alternate work schedule (AWS) where every other Monday is a scheduled day off. The contractor will / will not be allowed to work on AWS Mondays.
See Non-Technical Specifications C-4 and C-5 for additional information regarding work schedules on observed Federal Holidays.
6. BID BOND. For bids in excess of $100,000.00, including base bid and alternate bid items, the bidder MUST provide a good faith deposit in the amount of 5% of the bid by way of a bid bond from a surety insurer authorized to do business in the state of Florida, a certified check, or cashier’s check with their bid package.
7. PERMITS. The contractor shall obtain all required permits necessary for completion of this project from all authorities having jurisdiction; and shall include the cost of all such permits in their bid package.
8. QUESTIONS FROM BIDDERS. All questions and requests for clarifications related to this solicitation must be submitted in writing to the CFMO at ng.fl.flarng.list.cfmo-contracting@army.mil in accordance with the timeframe shown above. All questions will be answered in an addendum and posted in the same manner as the ITB.
9. REQUIRED BID PACKAGE DOCUMENTS (in this order).
• Exhibit 4 – Bid Proposal Form (include acknowledgement of Addenda)
• Exhibit 5 – Subcontractor List (indicate if “N/A”)
• Bid Bond (if applicable)
• Exhibit 3 – Contractor Qualification FNG 5085 (if requested by the Department)
• Letter of confirmation from bonding company (if applicable)
• Contractor agreement to perform at least 15% of project work
• Florida State contractor license (if applicable)
10. BID SUBMISSION AND BID OPENING. Envelopes containing bid submission must be clearly marked:
“SEALED BID – 222011 CBJTC Gas Station Re-Bid ATTN: CFMO Contract Management Branch” and submitted to:
Robert F. Ensslin, Jr. Armory 2305 State Route 207 Saint Augustine, FL 32086 Attention: CFMO Contracting
In order to be considered, bids must:
• be submitted on DMA forms
• not be submitted electronically
• not be received after the exact time specified for receipt
• not be received at any location other than specified in the ITB
Bids must be submitted in full accordance with the requirements of this solicitation.
Please contact the CFMO Contract Management Office at 904-823-0255 or 904- 823-0256 to confirm receipt of bid.
Federal or State picture ID is required for entry into the Robert F. Ensslin, Jr.
National Guard Armory. Bids will be accepted until the time of the Bid Opening.
11. NON-TECHNICAL SPECIFICATIONS. The Non-Technical Specifications included with the ITB are incorporated into the forthcoming contract by reference.
12. BONDS AND INSURANCE. Performance and Labor and Material Bonds are required from any persons or parties entering into a formal contract with the State of Florida for contracts in total excess of $100,000.00 for construction, additions, renovations, repairs, or demolition of any public building pursuant to Florida Statute 255.05(1). The price for these bonds and their recording fees must be included with each bid package.
The contractor will provide the owner with proof of insurance within 10 days of contract award; the price of all required insurance policies must be included in each bid package. Refer to the Non-Technical Specification for insurance requirements.
All insurance policies shall be with insurers qualified and doing business in Florida through an authorized license Florida Resident Agent.
13. DAVIS BACON ACT. Davis Bacon Act does not apply to this solicitation.
14. DAMAGES. Damages will be assessed in accordance with the Non-Technical
Specifications.
15. CONTRACT AWARD. Per Florida Administrative Code 60D-5.004, the project will be awarded to the responsive and responsible bidder that has submitted the lowest price for the base bid or base bid plus alternate bid item.
NOTE: Award of this contract is contingent upon funding from the State of Florida.
16. MY FLORIDA MARKETPLACE VENDOR INFORMATION PORTAL “VIP”. The
MFMP VIP is the primary source of information relating to this solicitation. Any solicitation information obtained from sources other than the Vendor Information Portal should not be relied on by prospective bidders. Bid solicitations received from other sources should be validated with the official solicitation on the Vendor Information Portal.
17. UNAUTHORIZED ALIENS. The Department shall consider the employment by any contractor of unauthorized aliens a violation of Act 274A of the Immigration and Naturalization Act. Such violation shall be cause for unilateral cancellation of this contract.
18. CAMP BLANDING JOINT TRAINING CENTER PROJECT SECURITY
REQUIREMENT (Post Contract Award and Execution). The Contractor is REQUIRED to submit to the Project Manager a list of all Contractor’s and Sub- Contractors’ employees that could possibly work on the project (Last Name, First Name, Driver’s License Number. (For employees that do not have a driver’s license, a US Passport, State ID card, Government issued Photo ID or Work Visa are acceptable. Note: Non US citizens can not use a foreign passport for work purposes. They must have a work via or Permanent Resident Card.
All Contractor’s and Sub-Contractors’ employees will have a background check run to pre-authorize their entrance on to Camp Blanding. If they have not been pre-approved, they will not be allowed on base. After contract execution, a form will be provided to the Contractor and the approval process takes approximately 5 business days. The Department will not be responsible for any costs incurred by the Contractor or Subcontractors due to employee approval delays as a result of late, incorrect and/or incomplete forms submitted by the Contractor.
19. CFMO PROJECT MANAGER COMMENTS.
20. UNIT REPRESENTATIVE COMMENTS.
21. A & E COMMENTS.
22. CONTRACTOR QUESTIONS / CONCERNS.
23. SITE VISIT.
NO VERBAL STATEMENTS MADE BY ANY STATE OF FLORIDA EMPLOYEE OR
AGENCY REPRESENTATIVE WILL SUPERSEDE INFORMATION PUBLISHED IN
THE SOLICITATION. ONLY WRITTEN ADDENDA ISSUED BY THE DEPARTMENT
OF MILITARY AFFAIRS CONSTRUCTION AND FACILITY MANAGEMENT OFFICE
WILL AMEND THIS SOLICITATION.
222011 CBJTC GAS STATION
PRE-BID MEETING NOTES
MARCH 8, 2023
1. Submit questions in writing so that entire group receives same response. Last day for bid questions is March 22, 2023.
2. Final addendum will be issued March 28, 2023.
3. Bid opening will be April 11, 2023 at 2pm.
4. Bid opening to be in St. Augustine. Bids must be received there and not at Camp Blanding.
Bidders are welcome to attend the bid opening.
5. Bids must be sent to St. Augustine address listed on pre-bid meeting agenda. FNG is not responsible for courier deliveries that are not made in time for bid opening.
6. Bid form from previous project will not be accepted, please use only bid forms for this project.
7. Work hours are from 7 am to 5 pm Monday-Saturday.
8. Contractor that is awarded the project must provide on letterhead a listing all employees and subcontractor employees that will be on the jobsite. Listing must include name and driver’s license, or state issued license. Background checks will be run. If an employee does not pass the background check, they will not be allowed on post. Valid ID, Visa and proper work authorization will be required for all workers.
24" Min.
12"
Varies
Replacement
Pavement
Nearest Joint
In Pavement
Varies
18"
Replacement Base
BACKFILL
Ditch Width (w)
Replacement Structural Course & Friction Course
See Location
Criteria In Utility
Accommodation Manual
FLEXIBLE PAVEMENT NOTES
PAVEMENT REMOVAL AND REPLACEMENT
COMPACTED AND STABILIZED FILL OPTION
See Location
Criteria In Utility
Accommodation Manual
GENERAL NOTES
FLEXIBLE PAVEMENT CUT RIGID PAVEMENT CUT
PAVEMENT REMOVAL AND REPLACEMENT
RIGID PAVEMENT NOTES
GRANULAR BACKFILL
Ditch Width (w) + 4’ 10’ Min. 10’ Min. Monolithic Slab 10’ Min.
Match The Existing Pavement Thickness
(Not Less Than 8" Thickness)
24" Min.
Backfill material shall be placed in accordance with Section 125 of the Standard Specifications.
In Stage #1, construct compacted fill beneath the haunches of the pipe, using mechanical tamps suitable for this purpose. This compaction applies to the material placed beneath the haunches of the pipe and above any bedding.
In Stage #2, construct compacted fill along the sides of the pipe and up to the bottom of the base, with the upper 12" receiving Type B Stabilization. In lieu of Type B Stabilization, the Contractor may construct using Optional Base Group 3.
Any edgedrain system that is removed shall be replaced with the same type materials.
Any edgedrain system that is damaged shall be repaired with methods approved by the
Engineer.
Fill material shall be placed in accordance with the Standard Specifications. Fill material shall be special select soil in accordance with Index No. 505.
In Stage #1, construct compacted fill beneath the haunches of the pipe, using mechanical tamps suitable for this purpose. This compaction applies to the material placed beneath the haunches of the pipe and above any bedding.
In Stage #2, construct fill along the sides of the pipe and up to the bottom of replacement pavement.
High early strength cement concrete (3000 psi) meeting the requirements of Standard
Specification 346 shall be used for rigid pavement replacement.
Pavement shall be mechanically sawed and restored to conform with existing pavement joints within 12 hours. (See Index No. 305)
#9 Stone Or Equivalent When Flowable Fill Option Is Used
* FLOWABLE FILL OPTION
* FLOWABLE FILL OPTION
TRENCH CUTS AND RESTORATIONS ACROSS ROADWAYS
Pavement shall be mechanically sawed.
The replacement asphalt shall match the existing structural and friction courses for type and thickness.
The new base materials shall be either of the same type and composition as the materials removed or of equal or greater structural adequacy (See Index No. 514).
If compaction can not be achieved through normal mechanical methods then flowable fill may be used.
Flowable fill is to be placed in accordance with Section 121 of the Specifications, as approved by the Engineer.
Do not allow the utility being installed to float. If a method is provided to prevent flotation from occurring, Stages #1 and #2 can be combined, if approved by the Engineer.
In Stage #1, place flowable fill midway up on both sides of the utility. Allow to harden before placing Stage #2.
In Stage #2, place flowable fill to the bottom of the existing base course.
If mechanical compaction can not be achieved through normal mechanical methods then flowable fill may be used.
Refer To Index No. 305
For Butt Const. Joint
12" 12"
Stage #1 Backfill *
See Notes Below
Stage #2 Backfill *
See Notes Below
12" 12"
Stage #2 Backfill *
See Notes Below
Stage #1 Backfill *
See Notes Below
Flowable fill is to be placed in accordance with Section 121 of the Specifications, as approved by the Engineer.
Do not allow the utility being installed to float. If a method is provided to prevent flotation from occurring, Stages #1 and #2 can be combined, if approved by the Engineer.
In Stage #1, place flowable fill midway up on both sides of the utility. Allow to harden before placing Stage #2.
In Stage #2, place flowable fill to the bottom of the stone layer.
1. The details provided in this standard index apply to cases in which jack and bore or directional boring methods are not required by the Engineer.
2. Flowable fill shall not be placed directly over loose, or high plastic, or muck material (see Index 505) which will cause settlement due to fill weight. Where highly compressible material exists, the amount, shape and depth of flowable fill must be engineered to prevent pavement settlement.
3. These details do not apply to utility cuts longitudinal to the centerline of the roadway which may require the additional use of geotextiles, special bedding and backfill, or other special requirements.
4. Method of construction must be approved by the Engineer.
5. Some pipe may require special granular backfill up to 6" above top of pipe.
Geotextiles may be required to encapsulate the special granular material.
6. Where asphalt concrete overlays exist over full slab concrete pavement, the replacement pavement shall have an overlay constructed over the replacement slab. The overlay shall match the existing asphalt pavement thickness. The replacement friction course shall match the existing friction course, except structural course may be used in lieu of dense graded friction course.
Existing broken and seated pavements shall be treated as flexible pavements.
7. All shoulder pavement, curb, curb and gutter, and their substructure disturbed by utility trench cut construction shall be restored in kind.
8. The use of flowable fill to reduce the time traffic is taken off a facility is acceptable but must have prior approval by the Engineer. Flowable fill use is allowed only when properly engineered for pavement crossings, whether straight or diagonal, and shall not be installed for significant depths or lengths. The maximum length shall be fifty (50) feet and a maximum depth of six (6) feet unless supported by an engineering document prepared by a registered professional engineer that specializes in soils engineering. The engineering document shall address the evaluation of local groundwater flow interruption and settlement potential.
9. Excavatable flowable fill is to be used when the flowable fill option is selected.
10. When approved by the Engineer, in lieu of the pavement and base, non-excavatable flowable fill may be used for manhole stabilization and ring and cover adjustments. Excavatable flowable fill shall not be used within the limits of the pavement and base.
Sheet No.
Index No.
2008 FDOT Design Standards Revision
MISCELLANEOUS UTILITY DETAILS
Last
A
A
For Structure Type See Plans
UTILITY CONFLICT PIPES THRU STORM SEWER STRUCTURES
NOTES FOR UTILITY CONFLICT PIPE
"Sumped" Conflict Manholes Shall Not Be Used Unless The System
Is Hydraulically Designed To Account For The Headloss Generated
If The Sump Is Completely Blocked
SECTION LONGITUDINAL TO CARRIER PIPE
B B
Annular Space Plug/Seal Option:
Flowable Fill Or Neoprene Flexible Seal
See Note No. 3
1’ Min. Clearance Between Obstruction
And Flow Line Of Outlet Pipe
Grout
Carrier Casing: The Casing Shall Be Rated To The
Greatest Pressure Of Either The Carrier, That’s
Called For By Design Or That’s Required By
Construction. The Casing May Be Steel, Cast
Iron, Ductile Iron Or Plastic. The Casing Can Be
Seamless Or Sealed Half Sleeves.
1’ Min. Clearance Between Obstruction
And Flow Line Of Outlet Pipe
SECTION LONGITUDINAL TO CARRIER PIPE
No Joints Allowed Within Structure
CarrierGrout When Box Precast
Carrier
SECTION BB SECTION AA
(Cradle Option Shown)
Carrier Spacer Or Cradle
Allow 2 feet minimum clearance on one side of utility for maintenance purposes and no less than
1 foot clearance on the other side
UTILITY CONFLICT CONDITION ~
(Pressure Or Fluid Carrier Installations)
UTILITY CONFLICT CONDITION ~~
A
A
Carrier
Carrier Casing Or The Carrier If No Casing Is Used
1. These details are for construction field expediency to resolve utility conflicts that cannot be remedied by relocation. For conflicts determined during design, use the construction shop drawings for structure details.
2. Concrete used in conflict structures shall be as specified in ASTM C478. 4000 psi may be used in lieu of Class ~ concrete.
3. Maximum opening for pipe shall be the pipe OD plus 6". Mortar used to seal the pipe into the opening will be of such mix that shrinkage will not cause leakage into or out of the structure.
4. If the conflict structure is round or there are multiple inlet or outlet pipes, then the wall section should be reviewed for strength.
5. If during the plans design or construction process it is determined that a domestic water supply line must pass though a storm drain structure, it must be shown on the design or construction plans and submitted to the Florida Department of Environmental Protection (FDEP) Administrator For Drinking
Water in Tallahassee for review and comment. This index provides accepted methods for addressing conflicts when and where they cannot be reasonably avoided. To be submitted along with the plans shall be a justification describing inordinate cost and the impracticality of avoidance. If identified, properly justified, and accomplished in accordance with this index, approval is granted. Upon request, the Utility Agency Owner (UAO) must provide support data on the cost of relocation or adjustment to the FDOT for submittal to the FDEP.
DESIGNER’S NOTE
(Nonpressure Or Nonfluid Carrier Installations)
Sheet No.
Index No.
2008 FDOT Design Standards Revision
07/01/07 2 of 3
Last
Median Edge Of Pavement On Curbed
Or Uncurbed Divided Facility x
Ring & Cover 4’ Min. 4’ Min.
PARTIAL CUTS FOR RING AND COVER ADJUSTMENTS
Varies
(4’ Min.)
Varies
(4’ Min.)
Longitudinal Cut Line
(Outside Wheel Path Where Practical)
Transverse Cut Line Transverse Cut Line
NOTES
Curb And Gutter On Two-Lane Two-Way Facility
Or One-Way Facility Or Type F Curb On Divided Facility
FOR TWO OR MORE LANES (TWO LANES SHOWN)
PLAN VIEW
Longitudinal Cut Line
MH Or
Excavation y
X 2 y 2
1. No irregular seams are permitted. All seams must be clean sawed.
2. Pavement cut seams for underground utility structures in rigid pavement are the same longitudinally, but the transverse seams shall extend to the nearest existing joint.
3. See Sheet 1 for replacement pavement.
Manhole
Manhole
Manhole
Sheet No.
Index No.
2008 FDOT Design Standards Revision
MISCELLANEOUS UTILITY DETAILS
Last
Longitudinal Cut Lines For Both Curbed And Uncurbed Facilities
Must Coincide With A Regular Seam Or Midlane Point In Order
To Be Outside The Wheel Path
NONTRENCH PAVEMENT CUTS FOR UNDERGROUND UTILITY STRUCTURES IN PAVEMENT
| 222011 CBJTC Gas Station Addendum 1 |
| 222011 CBJTC Gas Station Re-Bid - PreBid Sign In Sheet |
| 222011 CBJTC Gas Station Re-Bid - PreBid Meeting Agenda |
| 222011 CBJTC GAS STATION Meeting Minutes |
| FDOT Trench Patch Detail |
| 00307-01of03.pdf |
| 00307-02of03.pdf |
| 00307-03of03.pdf |
File details come from the government source that posted it. Updated .