- 12' x 20' Storage Building
- Solicitation number
- ARFQ 0211 GSD2700000030 2
- Issued by
- Kanawha County, West Virginia
About this file
This addendum document modifies a West Virginia state and local solicitation for a 12' x 20' storage building, issued under Solicitation Number CRFO GSD2600000014. The addendum addresses vendor technical questions and responses related to site conditions and delivery requirements. Two key questions were clarified: confirmation that a clear 14-foot-wide route exists from the road to the building placement area at 320 Michigan Avenue, and confirmation that the building will be placed on an existing blacktop surface, requiring the contractor to perform only delivery and setup work without additional foundation or site preparation.
The addendum requires all vendors to acknowledge receipt of all issued addenda by submitting a completed Addendum Acknowledgment Form with their bid proposal. Failure to acknowledge addenda may result in bid disqualification. The document emphasizes that only written information officially added to specifications through addenda is binding, and any verbal representations made during discussions with state personnel are not enforceable. Vendors must check the boxes corresponding to each addendum received and submit the signed acknowledgment to expedite document processing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GSD2103349 Bid Documents.pdf | ||
| Final_ARFQ_0211_GSD2700000030_1_WV_ARFQ_FORM.PDF | ||
| Final_ARFQ_0211_GSD2700000030_2_WV_ARFQ_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised 6/8/2012
SOLICITATION NUMBER: [Insert RFQ, RFP No.] Addendum Number: [Insert Number]
The purpose of this addendum is to modify the solicitation identified as [insert RFQ, RFP No.] (“Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specifications of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.
Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
GSD2103349 12' x 20' Storage Building
Technical Questions and Responses
Q)1 Is there a clear route at least 14 feet wide from the road to the building placement area at 320 Michigan Ave.?
A)1 Yes there is a clear route
Q)2 What foundation or pad is currently in place, and is the contractor expected to perform any foundation or site-preparation work beyond delivery and setup?
A)2 building will be placed on a blacktop surface, so the contractor only needs to handle delivery and setup.
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.: CRFO GSD2600000014
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.
Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
[ ] Addendum No. 1 [ ] Addendum No. 6
[ ] Addendum No. 2 [ ] Addendum No. 7
[ ] Addendum No. 3 [ ] Addendum No. 8
[ ] Addendum No. 4 [ ] Addendum No. 9
[ ] Addendum No. 5 [ ] Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that that any verbal representation made or assumed to be made during any oral discussion held between Vendor's representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.
| Addendum Form |
| storage tq |
| Addendum sig |
| Text1: GSD2700000030 |
| Text2: 1 |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Yes |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Text3: 1. To attach vendor questions and responses |