About this file
This is an Addendum No. 1 to Request for Proposal RFP-010-27 issued by the Louisville Regional Airport Authority in Kentucky for a Common Use Passenger Processing System (CUPPS) and Support Services at Louisville Muhammad Ali International Airport. The addendum clarifies that prime CUPPS bidders may engage qualified subcontractors to deliver 24/7 help desk, installation, on-site field engineering, hardware break/fix, and ongoing maintenance and support services, with all related costs explicitly itemized in the proposal and all subcontractors adhering to service standards outlined in the RFP. The addendum includes a pre-bid attendee list and plan holders list for the solicitation. Proposers were required to acknowledge receipt of this addendum either with their proposal or by separate letter no later than 2:00 p.m. EST on November 18, 2026, which is the proposal submission deadline. The original RFP indicated virtual interviews are expected between November 30 and December 2, 2026, with the Authority anticipating a Notice of Award within 30 calendar days of the proposal due date and reserving up to 120 calendar days for the award decision. The initial contract term is three years with two optional one-year renewals upon mutual consent.
The addendum addresses three key questions from proposers regarding subcontracting authority, availability of plan holders and pre-bid attendee lists, and a request for a three-week or two-week extension to the proposal deadline. The Authority confirmed that subcontractors are permissible for installation and support services with explicit cost itemization and compliance with all RFP service standards. The Authority politely declined the request for a deadline extension. Compensation is structured as a single complete proposal price covering design, software, hardware, integration, installation, configuration, training, licensing, cloud hosting, permits, warranty, and technical support. A $10,000 bid bond or irrevocable bank letter of credit is required with the proposal, and a $50,000 performance bond is required upon award. Insurance requirements include $2 million public liability, $1 million automobile liability, statutory workers' compensation, and $1 million professional liability coverage. Award will be selected on best value with evaluation weighting of 25% for system design and technical compliance, 25% for system cost, 15% for RFP responsiveness, 15% for experience and references, 10% for support and warranty, and 10% for implementation plan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LRAA Addendum 2, Attachment C1, Node Table, RFP-010-27.xlsx | XLSX spreadsheet | |
| Addendum 2.pdf | ||
| LRAA RFP-010-27, CUPPS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Louisville Regional Airport Authority
PURCHASING & PROCUREMENT
LOUISVILLE, KENTUCKY
Invitation No: RFP-010-27 Date: November 2, 2026 Post Bid Addendum No: One (1) Title: Common Use Passenger Processing System and Support Services
The following shall clarify and/or modify the original Proposal Document(s) as issued by the Louisville Regional Airport Authority (the “Authority”). All information shall be collectively incorporated in part of the original Proposal Documents. Except as specifically added and/or revised by this Addendum all other conditions, provisions, and criteria within the original Proposal Documents are unchanged.
This first addendum consists of three (3) pages involving the following information:
Part 1. Questions received and the Authority’s response/stance (1 page)
Proposer must acknowledge receipt of this and any addenda either with Proposal or by separate letter no later than 2:00 PM EST, November 18, 2026.
BY: T’airra Bridgewaters Authorized Purchasing Officer
Receipt Acknowledged:
Company Name
BY:
Print Sign
Remainder of page left intentionally blank
2 | P a g e
Invitation No: RFP-010-27 Date: November 2, 2026 Post Bid Addendum No: One (1) Title: Common Use Passenger Processing System and Support Services
Part 1. Proposal questions received and the Authority’s stance.
1) Question: Regarding Attachment C, Sections 3.5 and 10.4–10.5, can the Authority confirm that prime CUPPS bidders may engage qualified subcontractors to deliver 24/7 help desk, installation, on-site field engineering, hardware break/fix, and ongoing maintenance and support services?
AUTHORITY: Yes, firms may use subcontractors for installation and support services.
All related costs must be explicitly itemized in the proposal. Subcontractors must adhere to all service standards outlined in the RFP.
2) Question: Is a plan holders list or today’s pre-bid attendee list available for RFP-010-27?
AUTHORITY: It is included below.
3 | P a g e
3) Question: I am writing to respectfully request a three-week (or two-week) extension to the proposal submission deadline for RFP-010-27, Common Use Passenger Processing System (CUPPS) and Support Services.
AUTHORITY: We politely decline this request.
End of Addendum One (1)