About this file

This is an Addendum #1 to a Request for Bid issued by the City of Wichita, Kansas, Public Works & Utilities/Engineering Department for the 2026 Sanitary Sewer Rehabilitation Phase A project. The project involves trenchless rehabilitation of a sanitary sewer main extending from South McLean to South Seneca, crossing 2010 South Seneca, with bid number 260266 and project identifier 468-2026-028848 S6014. Bids are due on Friday, November 13, 2026, at 10:00 a.m. The addendum provides critical project specifications including manhole depths ranging from 4.02 feet to 7.4 feet deep at five identified locations, video inspection records available through the City's Procurement Portal, and flow data indicating an average flow of 800 gallons per minute with a peak flow of 1,000 gallons per minute on the 30-inch main. Vendors are required to electronically acknowledge receipt of this addendum through the City's Procurement Portal as part of their bid submission.

The addendum modifies the construction requirements for pipe liner installation by revising the specifications for liner curing methods. The document adds provisions for photoinitiated reaction curing methods, specifically UV or LED light cure processes, requiring manufacturers to define and document the cure protocol in accordance with ASTM F1216, ASTM F1743, or ASTM F2019 standards. Documentation requirements include recording time, rate of travel of the light curing assembly, pressures, temperature within the liner, and power output of the light assembly along the entire installed length of the Cured-In-Place Pipe (CIPP). The addendum addresses frequently asked questions from bidders regarding the availability of project videos, flow data, and manhole depths, all of which have been incorporated into this addendum or made accessible through the City's GIS mapping system and Procurement Portal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOVEMBER 3, 2026

CITY OF WICHITA, KANSAS

REQUEST FOR BID NUMBER 260266

ADDENDUM #1

PUBLIC WORKS & UTILITIES/ENGINEERING

2026 Sanitary Sewer Rehabilitaion Phase A (S Mclean to S Seneca, crossing 2010 S Seneca)

468-2026-028848 S6014

DUE DATE: FRIDAY, NOVEMBER 13, 2026 AT 10:00 A.M.

The following additions, deletions, and/or changes have been added to the specifications and made a part of this bid 260066.

See Attachment for Addendum #1 items

Each vendor is required to acknowledge receipt of this Addendum by electronic acknowledgement via City’s Procurement Portal (wichita.gov/procurementportal) and to file same with and attached to this bid.

Josh L. Lauber Purchasing Manager

ADDENDUM COVER PAGE

The submitter electronically acknowledges via City’s Procurement Portal (wichita.gov/procurementportal) by completing submission, receipt of this Addendum and the vendor response submitted herewith is in accordance with the information, instruction, and stipulations set forth herein.

ADDENDUM NO. 1

TO

PUBLIC WORKS & UTILITIES/ENGINEERING

2026 Sanitary Sewer Rehabilitaion Phase A (S Mclean to S Seneca, crossing 2010 S Seneca)

468-2026-028848 S6014

RFB No. 260266

(NOVEMBER 13, 2026)

The following changes and additions shall be made to the plans and proposal.

1. Videos from the main sections between the manholes are attached in the Procurement Portal.

Manhole Depths are as follows:

5445-027 @ 4.02’ deep 5445-379 @ 4.26’ deep 5445-026 @ 5.14’ deep 5445-020 @ 5.57’ deep 5445-191 @ 7.4’ deep

2. Change the Title of c) Liner Curing within 805.3 Construction Requirements – Installation of Liner on page 800-50 to read:

c) Liner Curing When Using Hot Water or Steam Cure

Add

d) Liner Curing When Using Photoinitiated Reaction (i.e., UV or LED light cure): A protocol shall be defined by the manufacturer and recorded during the cure process and maintained as documentation to verify cure. Data collected shall include time, rate of travel of the light curing assembly for dynamic curing processes, pressures, temperature in the liner and the power output of the light assembly along the entire length of the installed CIPP. The cure procedure shall be in accordance with ASTM F1216, ASTM F1743, or ASTM F2019 and the manufacturer’s recommendation.

Edit the remaining items of 805.3 Construction Requirements – Installation of Liner as e) Cool-down and f) Finish

3. Flow on 30” main: Average Flow – 800 GPM Peak Flow – 1000 GPM

4. Bid Questions. The following questions concerning the project have been asked and a response in red has been included.

Do you have videos on the project that you can send us? Video inspection records have been posted for review in the Procurement Portal.

Is there flow data available on the project? Average flow estimated to be 800 GPM; Maximum flow estimated at 1000 GPM.

Are the manhole depths available? Manhole depths within the project have been provided as part of this

Addendum; additional information on the system can be viewed at gismaps.wichita.gov.

I am requesting the use of UV Cured CIPP on this Project. Liner Curing within 805.3 Construction

Requirements has been modified by this Addendum to accommodate Liner Curing When Using

Photoinitiated Reaction.

This Addendum is hereby made a part of the solicitation to the same extent as though contained in the original documents and all itemized listings thereof.

Acknowledge receipt of this Addendum electronically via City's Procurement Portal as a part of submission completion.

END OF ADDENDUM #1