This addendum modifies the bid documents for Contract DA00708, issued by the North Carolina Department of Transportation, Division of Highways, Division 1, for the M/V Carteret Credit Dry Dock project in Dare County. The addendum, effective October 13, 2026, revises two sections of the Ferry Division Special Provisions: Section 23 (Global Davit - Removal, Inspection) and Section 28 (Main Engines Major Overhaul). Section 23 clarifies wire rope requirements for the global davit inspection and maintenance work, which includes disconnecting electrical services, draining hydraulic oil, performing a five-yearly maintenance inspection per the manufacturer's checklist, conducting a weight test, removing and installing new davit cable, renewing bolts, and conducting load testing to 110 percent safe working load in the presence of NCDOT and USCG representatives. Section 28 completely replaces the original specification to detail the overhaul and rebuild of two Caterpillar 3508 engines (Port Serial #69Z00771 and Starboard Serial #69Z00772) in accordance with Original Equipment Manufacturer maintenance manuals and service recommendations, including replacement of specified components such as turbo cartridges, cylinder heads, fuel injectors, bearings, seals, gaskets, and all fluids. The bid letting date is October 21, 2026, and the contract is available December 1, 2026, with completion required by April 30, 2027.
Both Section 23 and Section 28 are structured as lump sum contract items with all labor, equipment, tools, and materials included in the bid price. Section 23 excludes wire rope from contractor responsibility, as NCDOT will provide this item; wire rope requirements are clarified in the revised specification. Section 28 includes all removal and reinstallation of equipment, testing, and trials within the lump sum price. Contractors must provide comprehensive documentation for both sections, including inspection reports, test results, and certification of completion. No set-asides, MBE/WBE participation goals, or federal aid funding is indicated for this state-funded project. The contract is subject to a twelve-month guarantee period for materials and workmanship, liquidated damages of $1,600 per calendar day for failure to meet completion deadlines, and a maximum bid limit of $5.0 million. A bid bond equal to five percent of the total bid price and performance and payment bonds within fourteen days of award are required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDEMDU_ _2.pdf | ||
| ADDENDUM _3.pdf | ||
| Bid Notice-M-V Carteret Credit Dry Dock (CDD) - Dare County.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JOSH STEIN DANIEL H. JOHNSON
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS – DIVISION 1
113 AIRPORT DIVE, SUITE 100
EDENTON, NC 27932
Telephone: (252) 482-1850
Fax: (252) 482-8722
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
113 AIRPORT DRIVE, SUITE 100
EDENTON, NC 27932
ADDENDUM NO. 1
October 13, 2026
Contract No. DA00708
TIP No.: N/A
Federal Aid No.: State Funded
WBS Element: 16.401 County: Dare
Description: M/V Carteret Credit Dry Dock (CDD)
Letting Date: October 21, 2026
To Whom It May Concern:
This Addendum is issued to modify or clarify the bid documents previously furnished for the above-referenced project. The following changes shall be incorporated into the contract documents:
Proposal Revisions:
1. Pages FD-69 and FD-70 “Section 23 Global Davit - Removal, Inspection”: Section 23 of the
Ferry Division Special Provisions has been updated to clarify the wire rope requirements for this section. Please replace the original pages FD-69 and FD-70 with the attached revised pages.
2. Pages FD-76 and FD-77 “Section 28 Main Engines Major Overhaul”: Section 28 of the Ferry Division Special Provisions has been completely replaced to more accurately detail the scope of work required on the vessel. Please replace the original pages FD-76 and FD-77 with the attached revised pages FD-76 through FD-78.
All other terms and conditions of the original bidding documents remain unchanged.
Sincerely, Mark S. Winslow
Division Contract Engineer
Cc: R. K. Sawyer, PE M. B. Gill, PE G. J. Liverman, PE
B. N. Braswell, PE D. B. Otts, PE J. E. Dixon
J. J. Remme
DA00708 FD-69 STATE
REVISED 10/12/2026 (ADDENDUM 1)
23.0 Global Davit - Removal, Inspection:
23.1 Description
The Contractor shall disconnect electrical services, drain hydraulic oil for Global Davit inspection with guidance from NCDOT representative. The Contractor will perform a 5-
Yearly Maintenance Inspection as per Global Davit Technical Manual checklist.
Contractor shall perform a 5 year inspection of the Global Davit to include a weight test with a satisfactory result.
23.2 Owner Furnished Equipment
NCDOT will provide wire rope.
23.3 References
23.3.1 DWG 1-2035 Global Davit GmbH Rescue Boat Crane
23.3.2 Global Davit Manual
23.3.3 Global Davit Test Report for Five-Year Inspection
23.4 Requirements
The contractor shall disconnect Global Davit prior to unbolting from pedestal and drain hydraulic oil from tank and dispose of used oil at contractors’ expense. CHECKPOINT.
Remove paint from pedestal welds and inspect for cracks or deformation.
CHECKPOINT
Remove the old davit cable and install new one, accomplish a weight test as per the
NCDOT Ferry Division inspection form. CHECKPOINT
Contractor shall renew all bolts as in kind and torque all bolts in accordance with manufacturer’s specifications and reconnect davit. Contractor shall prep, prime and paint foundation after inspection is complete. The contractor shall refill hydraulic tank with required hydraulic fluid. CHECKPOINT
NOTE: Contractor to perform 5-year inspection and maintenance per Global Davit recommendations
23.5 Tests, Trials, and Documentation:
Contractor shall ensure proper operation of 1500# 2710# Capacity Rescue Boat Davit and
Rescue Gate with NCDOT representative present. Contractor shall load test davit slewing and lowering to 110% SWL in presence of NCDOT representative and USCG and provide certified results of load test.
DA00708 FD-70 STATE
23.6 Payment
The lump sum contract bid price for Generic Ferry Item (Global Davit Inspection And
Maintenance) shall be the total compensation for all labor, equipment, tools, and materials, excluding wire rope to accomplish the work detailed in this Special Provisions, including inspecting, restoring, repairing, and testing and trials. No further compensation will be made.
DA00708 FD-76 STATE
28.0 MAIN ENGINES MAJOR OVERHAUL:
28.1 Description
This section describes the requirement to complete an overhaul/rebuild of two (2)
Caterpillar 3508 engines.
(Note the 3508’s use aluminum spacer plate, part number 110-6994)
Port 3508B
Arrangement# 2W8866
Serial# 69Z00771
Starboard 3508B
Arrangement# 2W8866
Serial# 69Z00772
28.2 References
None
28.3 Owner Furnished Equipment
None
28.4 Requirements
The Contractor shall,
• Perform overhauls in accordance with Original Equipment Manufacturer
(OEM) Caterpillar maintenance manual and service recommendations for major overhaul.
• All parts shall be new or reconditioned in compliance with OEM standards
(where specified in the manual).
Replace the following parts as part of major overhauls (Note the 3508’s use aluminum spacer plate, part number 110-6994):
• Turbo Cartridges
• Oil Coolers
• Oil Pumps
• Lifters & Lifter Springs
• Cylinder Heads
• Fuel Injectors w/New Harnesses
• Cylinder Packs
• Fuel Transfer Pumps
DA00708 FD-77 STATE
• Water Pump
• Auxiliary Water Pump
• Fuel Priming Pump
• Front/Rear Seals
• Main Bearings
• Rod Bearings
• Thrust Bearings
• Camshaft Bearings
• Rocker Arm Bearings
• Temperature Regulators
• Crankcase Breathers
• All Air, Fuel, and Oil filters
• Relief Valves
• Oil Duplex Check Valves
• Aluminum Spacer Plates
• Valve Bridges
• Rocker Arm Buttons & Rings
• Engine Dampers
• Turbo Inlet & Outlet Bellows
• All seals and gaskets to replace above listed parts
• Replace all engine oil with Caterpillar approved oil
• Replace all coolant.
Inspect the following to acceptable Caterpillar tolerances and suggest for replacement if necessary:
• Camshafts
• Crankshafts
• Engine Block
Please provide NCDOT a detailed inspection report for each.
Perform the following as part of major overhauls:
• Clean & Test Aftercoolers, provide service and test report.
• Test run engines after completion
• Replace oil pan groups for each engine
• Breakout chockfast mounting system to be able to remove and install oil pan group
• Replace oil pan group
• Reinstall chockfast or other equivalent mounting system suitable for proper engine operation
• Provide proper engine alignment
• Provide final Caterpillar Technician Service Report along with warranty.
DA00708 FD-78 STATE
28.5 Test, Trials, and Documentation
Contractor shall provide NCDOT testing, inspection, and supporting documentation demonstrating that the overhaul/rebuilding of both Caterpillar
3508 engines has been completed in accordance with Caterpillar’s applicable requirements, specifications, and recommended overhaul/rebuild procedures.
Documentation shall include, at a minimum, applicable inspection and test results, parts and component records, measurements and tolerances, and certification of completion.
28.6 Payment
The Lump sum contract price for Generic Ferry Item (Main Engines Major Overhaul) shall be the total compensation for all labor, equipment, tools, and new materials to accomplish the work detailed in this Special Provisions, including removing and re-installing any equipment or interferences, testing, and trials. No further compensation will be made.