About this file
This Addendum #1 document pertains to Invitation for Bids (IFB) HSR26-30 Re-Bid #1 issued by the California High-Speed Rail Authority for a Pre-Demolition Hazardous Material Survey. The Authority seeks contractor services to perform a comprehensive pre-demolition hazardous materials survey that includes identification, sampling, analysis, classification, and documentation of hazardous materials such as friable and non-friable asbestos, asbestos-containing materials, lead-based paint, mold-contaminated materials, and other regulated substances. The addendum, dated October 9, 2026, amends Section F, Subsection (5).c of Exhibit A, the Scope of Work, to clarify contractor coordination requirements with the Authority's environmental staff and consultants. Bidders must register with Cal eProcure to download bid packages and are responsible for monitoring the website for addendums and updates. A kick-off meeting between the Authority's Contract Manager and the contractor must occur within one week after agreement execution, with safety training scheduled thereafter in-person at a location to be provided. Bidders must ensure all submitted documents reflect the amended Addendum 1 version, particularly any cost sheets or pages required with the bid package, or bids will be deemed nonresponsive.
The contractor shall obtain all necessary permits, licenses, certifications, and authorizations required by the City of Bakersfield, County of Kern, local Air Pollution Control District, and State of California, and must maintain professional certifications required under California Code of Regulations (Title 8 and Title 17) and California Health and Safety Code. All professional environmental and laboratory services must comply with applicable state and local regulations. The contractor is required to coordinate with the Authority's environmental staff to ensure completion of environmental clearances and regulatory submittals before survey work begins, comply with equipment cleanliness requirements, manage sampled materials properly, and adhere to approved procedures for hazardous materials handling and waste minimization. All reports must be submitted in accordance with Authority direction and regulatory requirements, with environmental documentation, laboratory reports, and hazardous materials inventories uploaded and maintained in EMMA per Authority environmental procedures. The contract will be governed by the State of California General Terms and Conditions (GTCs 02/2025) and Contractor Certification Clauses (CCC 04/2017).
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Notice-Pre-Demolition Hazardous Material Survey (IFB).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation for Bids: HSR26-30 Re-Bid #1 Pre-Demolition Hazardous Material Survey
IFB No.: HSR26-30 Re-Bid #1
Addendum #1
October 9, 2026
To: All Prospective Bidders
Re: HSR26-30 Re-Bid #1 Pre-Demolition Hazardous Material Survey
1) The Authority is notifying all prospective Bidders that Exhibit A, Scope of Work, Section F, Subsection (5).c. is amended and shall read as follows.
a. The Contractor shall coordinate with the Authority’s environmental staff and consultants to ensure all required environmental clearances, hazardous materials review documents, and regulatory submittals are properly completed before survey work begins. The Contractor shall comply with all environmental guidance provided by the Authority’s environmental staff, including requirements related to equipment cleanliness, proper management of sampled materials, and adherence to approved procedures for hazardous materials handling and waste minimization.
Note – If any pages replaced in the Addendum are required for submission with your bid package (i.e., Cost sheet, etc.), you must submit the amended Addendum version for said page (i.e., Addendum 1 written in the header). Bid packages received on incorrect documents will be deemed nonresponsive.
All other sections within the Informal IFB shall remain the same.
Sincerely, Susie Avalos Mejia Susie Avalos Mejia Contract Analyst Contracts and Procurement Branch
Addendum #1
HSR26-30 Re-Bid #1
INVITATION FOR BIDS
Notice to Prospective Bidders
October 9, 2026
You are invited to review and respond to this Invitation for Bids (IFB) entitled HSR26-30 Re-Bid #1 Pre-Demolition Hazardous Material Survey (IFB). This IFB is advertised in the California State Contracts Register through Cal eProcure at:
http://www.caleprocure.ca.gov
Please note that you must register with Cal eProcure in order to download IFB packages and any other provided documents from the Cal eProcure website.
Bidders are advised to check the Cal eProcure website for addendums, modifications, and updates to the bid documents. The California High-Speed Rail Authority (Authority and/or State) is not responsible for failure of the prospective bidder to check for any bid document updates, changes, or answers to questions posted on Cal eProcure. Failure to periodically check the website will be at the bidder's sole risk.
In submitting your bid, you must comply with the instructions found herein.
Note that this agreement will include the State of California General Terms and Conditions (GTCs 02/2025) and Contractor Certification Clauses (CCC 04/2017) that may be viewed and downloaded at Internet site:
http://www.dgs.ca.gov
The contact person for this IFB is:
Susie Avalos Mejia California High-Speed Rail Authority
Phone: (916) 908-1127 Email: Susie.Avalos@hsr.ca.gov and contracts@hsr.ca.gov
Please note that no verbal information given will be binding upon the State unless such information is issued in writing as an official addendum.
Susie Avalos Mejia
Contract Analyst http://www.caleprocure.ca.gov/ http://www.dgs.ca.gov/
Addendum #1, Re-Bid #1
EXHIBIT A
IFB/HSR26-30
H. All reports shall be submitted in accordance with ACM direction and all regulatory requirements.
(2). License and Permit Requirements – Pre-Demolition Hazardous Materials
Survey
a. The Contractor shall obtain all permits, licenses, certifications, fees, and authorizations required for the Hazardous Materials Survey, including those required by the City of Bakersfield, County of Kern, the local Air Pollution Control District, and the State of California. All professional, environmental, and laboratory services shall comply with applicable state and local regulations. Required licensing or hazardous‑materials submittals shall be provided to the State Fire Marshal or other appropriate regulatory agency.
b. The Contractor shall maintain all professional certifications necessary to perform hazardous materials surveys, and any other qualifications required under the California Code of Regulations (Title 8 and Title 17) and the California Health and Safety Code.
c. The Contractor shall coordinate with the Authority’s environmental staff and consultants to ensure all required environmental clearances, hazardous materials review documents, and regulatory submittals are properly completed before survey work begins. The Contractor shall upload and maintain all environmental documentation, laboratory reports, hazardous materials inventories, and required updates in EMMA, in accordance with the Authority’s environmental procedures. The Contractor shall comply with all environmental guidance provided by the Authority’s environmental staff, including requirements related to equipment cleanliness, proper management of sampled materials, and adherence to approved procedures for hazardous materials handling and waste minimization.
G. Meetings and Safety Training
(1). The ACM and the Contractor or Contractor’s designated employee shall attend an in-person or virtual “kick-off” meeting, on a mutually agreed-upon day and time, within one (1) week after the execution of the Agreement
(2). Meetings may be scheduled at the request of either the ACM or the Contractor. Should either party request a meeting, the other party shall respond in writing via email within forty-eight (48) hours with a mutually agreed-upon day and time, to take place within one (1) week.
(3). The safety training will be approximately one (1) hour long and will be administered in-person. The Contractor shall take all the necessary precautions provided in the Authority Safety Program Division’s safety training to prevent hazards, injuries, and/or damages to Authority property, any adjacent property, Authority staff, invitee(s), property owner(s), and property occupant(s), and/or the general public. The location of the safety training will be provided upon scheduling.