Addendum 1.pdf
PDF 1 MB Posted
- Attached to
- RFB-278-26 FSS- TCOB Roof Project
- Solicitation number
- RFB 785 2600000609 8
- Issued by
- Elliott County, Kentucky
About this file
This addendum to Invitation to Bid No. RFB-278-26 is issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for a roof project at the Transportation Cabinet Office Building in Frankfort, Kentucky. The project encompasses selective demolition of existing roofing systems, installation of new SBS-modified bituminous membrane roofing, replacement of roof drains, and miscellaneous repairs to roof edge conditions and drainage systems across multiple roof areas designated as A through GG. Work includes removal of existing sheet metal flashing, roof edge drainage systems, water-damaged roofing and insulation down to metal decking, damaged metal decking and wood blocking, and the salvage and reinstallation of existing lightning protection systems and roof drains. The new roofing systems vary by substrate type, with mechanically attached polyisocyanurate insulation, gypsum cover board, SBS-modified bituminous base and cap sheets, and modified foil-faced flashings specified over metal deck and cast-in-place concrete deck areas. Substantial completion is required within 280 calendar days from the executed contract date, with final completion 30 days thereafter.
The contract includes a 3,200 square foot wet area roof removal and replacement allowance with unit prices to be established by the contractor at time of bid submission. Liquidated damages are assessed at $600 per calendar day for delays beyond the substantial completion date and $300 per calendar day for delays beyond final completion. The prime roofing contractor must self-perform low-slope, metal panel, and SBS material work, with carpentry and metal flashing able to be subcontracted; the contractor must demonstrate five consecutive years of experience with the specified roofing systems and provide proof of certified installer status from the product manufacturer. A 20-year manufacturer's no-dollar-limit total systems warranty and a 2-year installer's warranty are required. The existing building will remain occupied during construction, requiring coordination with the owner regarding work disruptions, with a minimum of 72 hours' notice required for activities affecting operations. COVID-19 vaccination compliance with current state and CDC guidelines is mandatory, and the contractor must maintain the work area in a weathertight condition and provide daily debris removal.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-278-26
FOR: Roof Project Transportation Cabinet Office Building Department for Facilities and Support Services Frankfort, Kentucky
DATE: May 22, 2026
RFB-785-2600000609
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-278-26 For: Roof Project Transportation Cabinet Office Building Department for Facilities and Support Services Frankfort, Kentucky
Janis Wilhoite, Statewide Procurement Analyst II Division of Engineering and Contract Administration
F.S.S. - T.C.O.B. Roof Project
Transportation Cabinet Office Building
Frankfort, Kentucky Acct No: 785-CBQ3-TB05-00
TABLE OF CONTENTS 000110 - 1
DOCUMENT 000110 -TABLE OF CONTENTS
Section Title
000110 Table of Contents
DIVISION 1 - GENERAL REQUIREMENTS
011000 Special Conditions
DIVISION 2 - SITE CONSTRUCTION
024119 Selective Demolition
DIVISION 3 – CONCRETE
030130 Maintenance of Cast-in-Place Concrete
DIVISION 4 – MASONRY (Not Used)
DIVISION 5 – METALS
053100 Steel Decking
DIVISION 6 - WOOD AND PLASTICS
061053 Miscellaneous Rough Carpentry
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
070150 Preparation for Reroofing
075216 SBS Modified Bituminous Membrane Roofing
077200 Roof Accessories
079200 Joint Sealants
DIVISION 8 - OPENINGS (Not Used)
DIVISION 9 – FINISHES (Not Used)
DIVISION 10 - SPECIALTIES (Not Used)
DIVISION 11 - EQUIPMENT (Not Used)
DIVISION 12 - FURNISHINGS (Not Used)
DIVISIONS 13 - SPECIAL CONSTRUCTION
134613 Lightning Protection for Structures
TABLE OF CONTENTS 000110 - 2
DIVISIONS 14 - CONVEYING EQUIPMENT (Not Used)
END OF DOCUMENT 000110
Special Conditions for Commonwealth of Kentucky Projects – 10000
SPECIAL CONDITIONS - 10000 Page 1 of 10
Contents
Article Title
‘1 Special Conditions Supplement
‘2 The Project
‘3 Project Contacts
‘4 Times for Completion
‘5 Liquidated Damages
‘6 Temporary Facilities and Controls
‘7 Special Inspections and Testing
‘8 Allowances
‘9 Unit Prices
‘10 Schedule of Additive Alternates
‘11 Additional Project Completion or Close-out Requirements
‘12 Special Project Site Security or Access Required
‘13 Special Delegated Design Requirements
‘14 Other Special Conditions of Contract
SPECIAL CONDITIONS - 10000 Page 2 of 10
Articles
‘1 Special Conditions:
These Special Conditions are a provided as a supplement to the General Conditions in the Specifications.
Special Conditions will also supersede General Conditions where changes are necessary to coordinate with specific project requirements.
‘2 The Project:
These specifications and drawings accompanying them describe the work to be performed and materials to be furnished for the:
F.S.S. - T.C.O.B. ROOF PROJECT
TRANSPORTATION CABINET OFFICE BUILDING
FRANKFORT, KENTUCKY
Account Number 785-CBQ3-TB05-00
Project Description:
The project consists of removal of existing built-up roof systems in designated areas, installation of new roofing systems, existing building, miscellaneous minor repairs to roof edge condition and roof edge drainage systems as follows:
1. Selective Demolition: The following is a general outline of roof work to be performed:
a. Remove existing sheet metal flashing and trim as indicated on the Drawings.
b. Remove existing roof edge drainage system.
c. Remove water damaged portions of existing roofing system, including insulation, down to metal decking.
d. Remove / repair damaged portions of existing metal decking, as required.
e. Remove and salvage existing lightning protection system.
i. Salvaged existing lightning protection system to be reinstalled after roof and flashing work is completed.
f. Remove and salvage existing roof drains.
i. Salvaged existing roof drains to be reinstalled after roofing system is installed.
g. Disposal of demolition waste materials.
2. New Roofing Systems:
a. Roofing System Description Over Existing Metal Deck:
i. Mechanically attach base layer of polyisocyanurate insulation to metal deck.
ii. Adhere second layer of polyisocyanurate insulation in cold-applied asphalt adhesive.
iii. Adhere one layer gypsum cover board in cold-applied asphalt adhesive.
iv. Install SBS modified bitumen base fiberglass mat base sheet in cold-applied asphalt adhesive.
v. Install modified base flashings at walls and curbs.
vi. Re-install roof drains.
SPECIAL CONDITIONS - 10000 Page 3 of 10
vii. Install modified cap sheet in cold-applied asphalt adhesive.
viii. Adhere foil faced modified flashings at walls and curbs.
b. Roofing System Description Over Existing Metal Deck Canopy:
i. Mechanically attach one layer gypsum cover board to metal deck.
ii. Install SBS modified bitumen base fiberglass mat base sheet in cold-applied asphalt adhesive.
iii. Install modified base flashings at walls.
iv. Re-install roof drains.
v. Install modified cap sheet in cold-applied asphalt adhesive.
vi. Adhere foil faced modified flashings at walls and curbs.
c. Roofing System Description Over Existing cast-in-place Concrete Deck:
i. Adhere vented base sheet to cast-in-place concrete deck with cold-applied asphalt adhesive.
ii. Install SBS modified bitumen base fiberglass mat base sheet in cold-applied asphalt adhesive.
iii. Install modified base flashings at walls and curbs.
iv. Re-install roof drains.
v. Install modified cap sheet in cold-applied asphalt adhesive.
vi. Adhere foil faced modified flashings at walls and curbs.
‘3 Project Contacts:
(Refer to Drawings for Company Addresses / Phone Numbers)
In the roles defined by the General Conditions as “Architect” and as used throughout the Contract Documents as the Architect of the work being constructed,, the following firm and its sub-consultants are working under separate contract with the Owner to provide the services under this role:
Architect: Company Name: Patrick D. Murphy Co., Inc., Architects Principal-In-Charge: Jean-Paul Grivas, V.P.
Project Manager: Jean-Paul Grivas, V.P.
In the roles defined by the General Conditions as “Owner” and as used throughout the Contract Documents as the Owner of the work being constructed, is the Commonwealth of Kentucky, acting through the Finance and Administration Cabinet, Department for Facilities Management and Support Services, Division of Engineering and Contract Administration. The Owner is solely represented by the following:
Owner: Finance and Administration Cabinet Facilities and Support Services Division of Engineering and Contract Administration Project Manager: Carl Kratzer Executive Director: Scott Baker
SPECIAL CONDITIONS - 10000 Page 4 of 10
In the role defined by General Conditions, “Agency or Using Agency”, is a state government entity which utilizes the work being constructed. This agency is a client of the Owner and advises the Owner on matters related to the project. This Using Agency does not possess the legal authority of Owner:
Using Agency: Facilities and Support Services Project Manager: Sandy Wilson Director: Terry Denny
‘4 Times of Completion:
Subject to the conditions of Article ’16 – “Delays and Extension of Time” of the General Conditions, the work to be performed under this Contract shall be completed as follows:
Substantial Completion Two Hundred Eighty (280) Calendar Days from date of Executed Contract for Construction. Article ’19.4 of the General Conditions set forth specific requirements of the Commonwealth of Kentucky that are necessary to be fulfilled by the Contractor in order to be determined to have accomplished Substantial Completion by this date. Refer to Article ’11 of these Special Conditions for additional requirements of this specific project required to accomplish Substantial Completion
Final Completion Thirty (30) Calendar Days beyond Substantial Completion. Article ’19.5 of the General Conditions set forth specific requirements of the Commonwealth of Kentucky that are necessary to be fulfilled by the Contractor in order to be determined to have accomplished Final Completion by this date. Refer to Article ’11 of these Special Conditions for additional requirements of this specific project required to accomplish Final Completion.
As indicated in Article ‘4 of the General Conditions, “Construction Schedule”, the following limitations of work times are set forth herein that are to be accounted for by the Contractor in scheduling and sequencing of the work:
• The existing facility will be open and accessible to the public during construction.
o Restriction may apply to work hours or days of operation during normal business hours.
‘5 Liquidated Damages / Damages from Untimely Performance:
In accordance with Article ’19.7 of the General Conditions, the Contractor shall pay the Owner the following identified amount for each and every calendar day of unexcused delay in achieving Prior to Completion Review and Final Completion beyond the date set for below for each:
Substantial Completion Liquidated Damages are $ 600.00/calendar day for each day beyond the established Date of Substantial Completion until the Actual Date of Substantial Completion is achieved.
(See Article ’19.4 of the General Conditions and Article ’11 of these Special Conditions for requirements for Substantial Completion).
Final Completion Liquidated Damages are $ 300.00/calendar day for each day beyond the established Date of Final Completion until the Actual Date of Final Completion is achieved. (See Article ’19.5 of the General Conditions and Article ’11 of these Special Conditions for requirements for Final Completion).
SPECIAL CONDITIONS - 10000 Page 5 of 10
‘6 Contractor Provided Temporary Facilities and Controls:
Construction Office/Trailer: None required
Staging / Parking: Owner will provide staging and parking spaces to the contractor; this will be discussed at the Pre-Bid & Pre-Construction Meetings.
Temporary Fencing and Signage:
• Provide collection secure zone for roof debris containment.
• Provide warning signs on the fence; e.g. “Caution – Work Area,” “Overhead work in progress,” “No
Admittance – Work Area,” etc.
Portable Toilet Facilities: are Required and to be located within construction fencing
Utilities: Contractor to set up new temporary utilities or coordinate with owner for hook-up of existing where applicable Water: Use Owner Existing Utility. Contractor to coordinate temporary connections with Owner and is responsible for all temporary connection costs.
Electric: Use Owner Existing Utilities. Contractor to coordinate temporary connection or use with
Owner and is responsible for all temporary connection costs.
‘7 Special Inspections and Testing:
Article ’12 of the General Conditions and the technical specifications of the Contract Documents define and establish the requirements and provisions for Inspection of the Work, Special Inspections performed by others working under separate contract with the Owner, and testing to be provided by the Contractor.
Structural Special Inspections and Testing: Not Required
Site Special Inspections and Testing: Not Required
Contractor Provided Testing: All other testing required by the Contract Documents are Contractor Provided Testing.
‘8 Allowances included in the Contract Amount:
The Contractor is required by Article ’30 of the General Conditions to include in the Contract Amount the following Allowances:
• 3,200 SF of Wet Area Roof Removal and Replacement
Allowances shall include all necessary materials, costs of delivery, installation labor, tools and equipment necessary to provide the item or services indicated in the Allowance. When the item of work or service is completed, the Contact Amount is modified by Change Order to reconcile the Allowance with the actual cost of the item or service provided. The contractor’s overhead, profit, insurance and bonds, and administrative costs are included in the prescribed markup permitted by Article ’14 of the General Conditions “Changes in the Work” and are not to be included in the Allowance.
SPECIAL CONDITIONS - 10000 Page 6 of 10
‘9 Unit Prices established by the Form of Proposal:
The Contractor is required at time of submitting a bid proposal for this work to provide specific Unit Prices that will be used to add or deduct those specific work items or services by an established unit of measure and the stated price per unit.
Unit prices include all necessary materials, costs of delivery, installation labor, tools and equipment necessary to provide the unit measured item. If a unit price is used in a change to the work by Change Order, the contractor’s overhead, profit, insurance and bonds, and administrative costs are included in the prescribed markup permitted by Article ’14 of the General Conditions “Changes in the Work” and are not to be included in the unit price.
For a schedule of Unit Prices see the “Unit Prices” section of the Bid Form of Proposal.
‘10 Schedule of Additive Alternates:
The Bid Form of Proposal includes Additive Alternates that, if accepted by the Owner during review of bids, become a part of the Contract Amount. Additive Alternates are listed in the order which they will be considered and may be accepted by the Owner to be included in the base Contract of the Work. The following is the sequential listing and description of Additive Alternates:
• Not Applicable.
Additive Alternates include all necessary materials, costs of delivery, installation labor, tools and equipment, contractor’s overhead, profit, insurance and bonding, and administrative costs. All work necessary to provide the work described in the Additive Alternate is to be included.
‘11 Additional Project Completion or Project Close-Out Required:
Article ’19.4 of the General Conditions “Substantial Completion” defines the specific MANDATORY requirements to be accomplished or provided to achieve Substantial Completion of the Project. In addition to those requirements, the following requirements are also MANDATORY requirements to be accomplished or provided to achieve Substantial Completion of this Project
• Manufacturer’s representative’s inspections to occur periodically and once roofing work is Substantially Complete. All inspection warranties are to start from the date of Substantial Completion unless otherwise altered by the Director of the Division of Engineering. Inspections listed are to be included in the Construction Schedule as items with specific dates scheduled so as to meet the Date of Substantial Completion.
Article ’19.5 of the General Conditions “Final Completion” defines the specific MANDATORY requirements to be accomplished or provided to achieve Final Completion of the Project. In addition to those requirements, the following requirements are also MANDATORY requirements to be accomplished or provided to achieve Final Completion of this Project:
• No additional requirements required
SPECIAL CONDITIONS - 10000 Page 7 of 10
‘12 Special Project Site Security or Access Requirements:
12.1 Owner Occupancy: The existing building(s) will be occupied during the course of this project. Also, the owner will be occupying other buildings of the complex that are within some proximity to the
Work, including conducting business. Perform the Work so as not to interfere with Owner’s operations and to avoid contact with office personnel and the general public.
12.1.1 Maintain handicapped access to the affected buildings and surrounding complex buildings.
Where construction activities block existing accessible paths and/or ramps, provide ADA-compliant temporary access by means necessary in that particular condition.
12.1.2 Owner Operations: The Contractor shall coordinate Work disruptions as needed to maintain full complex operations. Provide not less than 72 hours’ notice to Owner of activities that will affect Owner’s operations in the project building(s) and other complex facilities.
12.2 Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations in a timely manner.
12.3 Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations in a timely manner.
12.3.1 Contractor shall erect temporary barricades, fences, and other measures necessary to protect office personnel and the general public from damage.
12.4 Entrance into Complex Buildings. Contractor entrance into complex buildings, those involved in this project work and those adjacent, is prohibited. Contractor shall not enter any building in the
Complex unless specifically required by the project work.
12.5 COVID-19 Vaccination Requirements – The contractor is to follow current State and CDC guidelines.
‘13 Special Delegated Design Requirements:
• There is no Special Delegated Design allowed for in this project.
‘14 Other Special Conditions of Contract:
14.1 The Prime Roofing Contractor must self-perform the following (Low Slope, Metal Panels and SBS materials). Carpentry and Metal Flashing/Trim can be sub-contracted. Prime Contractor shall provide references that show their primary business is roofing. The Prime Contractor must have performed specified system within the last 5 consecutive years and have a minimum of 5 consecutive years specializing in the specified roofing systems of one or more of the approved manufacturers. The Prime
Roofing Contractor shall provide proof that their company is a certified installer for the product being supplied and installed. The roof experience referenced must be of similar size, scope, and type as the
SPECIAL CONDITIONS - 10000 Page 8 of 10 proposed project. The certified installer must follow the product manufacturer’s published installation instructions. The Prime Roofing Contractor shall provide a resume for a qualified project superintendent that has a minimum of 5 years’ experience installing or supervising the specified system. The job superintendent must always be on job site when work is being performed. (Per
General Conditions)
14.2 Immediately following award of Contract for this work, determine sources of supply for required materials and length of time required for their delivery, including materials of subcontractors, and place order for such materials promptly.
14.3 Consult with Owner and agree on a “General Plan of Operations.” Show concisely the proposed manner the Work will be carried out. Indicate areas where work will be first begin, sequence of operations, traffic pattern for delivery of materials and equipment, etc. Once this written Plan of
Operations is agreed upon, do not deviate from this plan unless approval is secured, in writing, from the Owner.
14.4 Provide Owner with 24-hour emergency phone numbers.
14.5 Buildings associated with this project will be occupied during period of construction. Coordinate construction schedule & noisy activities (e.g. masonry through wall flashing repairs) with Owner’s schedules. Noisy work to occur only at times approved by Owner in writing.
14.6 Return roofing work to watertight condition prior to any inclement weather. Contractor is responsible for moisture infiltration and damage to interior of building, roofing system, and components which occurs during the demolition and construction process until final completion.
14.7 Remove debris, such as, but not limited to, the following: roofing, metal edge, loose paper, wrappers, etc., on a daily basis and in a controlled manner.
14.8 Take down ladders daily and store securely.
14.9 PROJECT MANAGEMENT AND COORDINATION
14.9.1 Digital Project Management Procedures:
14.9.1.1 Architect's Data Files Not Available: Architect will not provide Architect's CAD drawing digital data files for Contractor's use during construction.
14.9.2 PRODUCT WARRANTIES
14.9.2.1 Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract
Documents.
14.9.2.1.1 Manufacturers and Special Warranties shall be governed by the laws and regulations of the
Commonwealth of Kentucky. Should there be a conflict between warranty provisions and the
SPECIAL CONDITIONS - 10000 Page 9 of 10 laws and regulations of the Commonwealth of Kentucky, the laws and regulations of the
Commonwealth of Kentucky shall take precedence.
14.9.2.1.2 Manufacturer's Warranty: Written standard warranty form furnished by individual manufacturer for a particular product and issued in the name of the Owner or endorsed by manufacturer to Owner.
14.9.2.1.3 Special Warranty: Written warranty required by the Contract Documents to provide specific rights for Owner and issued in the name of the Owner or endorsed by manufacturer to Owner.
14.9.3 PRODUCT SELECTION PROCEDURES
14.9.3.1 Visual Selection Specification: Where Specifications include the phrase "as selected by Architect from manufacturer's full range" or a similar phrase, select a product that complies with requirements. Architect will select color, gloss, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.
END OF SPECIAL CONDITIONS
SELECTIVE DEMOLITION 024119 - 1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
C. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
D. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
E. "Approved": When used to convey Architect's action on Contractor's submittals, applications, and requests, "approved" is limited to Architect's duties and responsibilities as stated in the
Conditions of the Contract.
F. "Directed": A command or instruction by Architect. Other terms including "requested,"
"authorized," "selected," "required," and "permitted" have the same meaning as "directed."
G. "Indicated": Requirements expressed by graphic representations or in written form on
Drawings, in Specifications, and in other Contract Documents. Other terms including "shown,"
"noted," "scheduled," and "specified" have the same meaning as "indicated."
H. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work.
I. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations.
J. "Install": Unload, temporarily store, unpack, assemble, erect, place, anchor, apply, work to dimension, finish, cure, protect, clean, and similar operations at Project site.
SELECTIVE DEMOLITION 024119 - 2
K. "Provide": Furnish and install, complete and ready for the intended use.
L. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built.
M. “Remove”: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
N. “Collection Zone”: Area set aside for accumulation of demolition and construction waste and debris to protect people, buildings, individual trees, groups of trees, shrubs, or other vegetation during demolition and construction.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination:
1. Arrange selective demolition schedule so as not to interfere with Owner's operations.
B. Sequencing:
1. Owner will conduct salvage operations before demolition begins to remove materials
Owner chooses to retain.
C. Scheduling:
1. Schedule Work to coincide with new construction.
2. Cooperate with Owner in scheduling noisy operations and waste removal that may impact
Owners operation.
D. Predemolition Conference: Conduct conference at Project site.
1.5 ACTION SUBMITTALS
A. Photographs: Provide photographs documenting existing damaged roof insulation, metal roof decking, and wood blocking to be removed.
1.6 INFORMATIONAL SUBMITTALS
A. Schedule of Selective Demolition Activities: Indicate the following:
SELECTIVE DEMOLITION 024119 - 3
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's building manager's and other tenants' on-site operations are uninterrupted.
1.7 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the
Work.
1. Hazardous materials will be removed by Owner before start of the Work.
2. If suspected hazardous materials are encountered, do not disturb; immediately notify
Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1.8 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
2.2 MATERIALS
A. Plastic Fencing: Plastic Collection Zone fencing constructed of high-density extruded and stretched polyethylene fabric with 2-inch maximum opening in pattern and weighing a
SELECTIVE DEMOLITION 024119 - 4
minimum of 0.4 lb/ft.; remaining flexible from minus 60 to plus 200 deg F; inert to most chemicals and acids; minimum tensile yield strength of 2000 psi and ultimate tensile strength of
2680 psi; secured with plastic bands or galvanized-steel or stainless-steel wire ties; and supported by tubular or T-shape galvanized-steel posts spaced not more than 96 inches apart
1. Height: 48 inches.
2. Color: High-visibility orange, nonfading.
PART 3 - EXECUTION
3.1 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Protect existing construction and other existing finish work that are to remain or that are exposed during selective demolition operations.
3. Protect existing grounds and landscaping from damage.
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
C. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line of trees to protect vegetation from damage from construction operations. Protect tree root systems from damage, flooding, and erosion
D. Remove temporary barricades and protections where hazards no longer exist.
3.2 SUMMARY OF WORK
A. The following is a general outline of roof work to be performed:
1. Remove existing sheet metal flashing and trim as indicated on the Drawings.
2. Remove existing roof edge drainage system.
3. Remove water damaged portions of existing roofing system, including insulation, down to metal decking.
4. Remove damaged portions of existing metal decking.
5. Remove and salvage existing lightning protection system.
a. Salvaged existing lightning protection system to be reinstalled after roof and flashing work is completed.
SELECTIVE DEMOLITION 024119 - 5
6. Remove and salvage existing roof drains.
a. Salvaged existing roof drains to be reinstalled after roofing system is installed.
7. Remove Existing EIFS wall system down to CMU substrate.
8. Disposal of demolition waste materials.
3.3 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated on Drawings. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches.
4. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, roofs, or framing.
6. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.4 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Roofing: Remove damaged portions of existing roofing as indicated on the Drawings and where discovered prior to roof installation.
SELECTIVE DEMOLITION 024119 - 6
1. Coordinate selective demolition with the work specified in the following sections:
a. Section 030130 “Maintenance of Cast-in-Place Concrete.”
b. Section 053100 “Steel Decking.”
c. Section 061053 “Miscellaneous Rough Carpentry.”
d. Section 070150.19 “Preparation for Reroofing.”
e. Section 075216 “SBS Modified Bituminous Membrane Roofing.”
f. Sections 076200 “Sheet Metal Flashing and Trim.”
g. Section 077200 “Roof Accessories.”
h. Section 079200 “Joint Sealants.”
i. Section 134613 “Lightning Protection for Structures.”
B. Gutters and Downspouts: Remove existing roof edge drainage system.
C. Metal Flashings and Trim: Remove existing sheet metal flashings and trim.
D. Roofing Insulation: Where indicated on Drawings and where uncovered, remove existing roofing insulation that is damaged and considered to be unsatisfactory by the Architect.
E. Metal Roof Decking: Where uncovered, remove existing metal roof decking that is damaged and considered to be unsatisfactory by the Architect.
F. Wood Blocking: Where uncovered, remove existing blocking that is damaged and considered to be unsatisfactory by the Architect.
G. EIFS: Remove existing exterior insulation and finish system (EIFS).
3.5 COLLECTION ZONES
A. Collection-Zone Fencing: Install collection-zone fencing along edges of collection zones before materials and equipment are brought on the site and before demolition operations begin in a manner that will prevent people from easily entering protected areas except by entrance gates.
Construct fencing so as not to obstruct safe passage or visibility at vehicle intersections where fencing is located adjacent to pedestrian walkways or in close proximity to street intersections, drives, or other vehicular circulation.
1. Posts: Set or drive posts into ground one-third the total height of the fence without concrete footings. Where a post is located on existing paving or concrete to remain, provide appropriate means of post support acceptable to Architect.
B. Place tarps over ground area within collection zones where demolition and construction debris and waste will be collected.
1. On a daily basis remove demolition and construction debris and waste from grounds and landscaped areas.
2. Do not allow tarps and large objects related to demolition to cover vegetation areas for more than 1 day.
3. Do not place tarps and large objects related to demolition over the same vegetation areas that were previously covered until that area has remained uncovered for at least 24 hours.
SELECTIVE DEMOLITION 024119 - 7
C. Maintain collection-zone fencing and signage in good condition as acceptable to Architect and remove when construction operations are complete and equipment has been removed from the site.
1. Do not remove collection-zone fencing, even temporarily, to allow deliveries or equipment access through the collection zone.
2. Temporary access is permitted subject to preapproval in writing by arborist if a root buffer effective against soil compaction is constructed as directed by arborist. Maintain root buffer so long as access is permitted.
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
B. Burning: Do not burn demolished materials.
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations.
END OF SECTION 024119
MAINTENANCE OF CAST-IN-PLACE CONCRETE 030130 - 1
SECTION 030130 - MAINTENANCE OF CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Removal of deteriorated cast-in-place concrete and subsequent replacement and patching.
1.2 DEFINITIONS
A. "Approved": When used to convey Architect's action on Contractor's submittals, applications, and requests, "approved" is limited to Architect's duties and responsibilities as stated in the
Conditions of the Contract.
B. "Directed": A command or instruction by Architect. Other terms including "requested,"
"authorized," "selected," "required," and "permitted" have the same meaning as "directed."
C. "Indicated": Requirements expressed by graphic representations or in written form on
Drawings, in Specifications, and in other Contract Documents. Other terms including "shown,"
"noted," "scheduled," and "specified" have the same meaning as "indicated."
D. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations.
E. "Install": Unload, temporarily store, unpack, assemble, erect, place, anchor, apply, work to dimension, finish, cure, protect, clean, and similar operations at Project site.
F. "Provide": Furnish and install, complete and ready for the intended use.
G. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built.
H. “Collection Zone”: Area set aside for accumulation of demolition and construction waste and debris to protect people, buildings, individual trees, groups of trees, shrubs, or other vegetation during demolition and construction.
I. “Vegetation”: Trees, shrubs, groundcovers, grass, and other plants.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project Site.
MAINTENANCE OF CAST-IN-PLACE CONCRETE 030130 - 2
1. Review methods and procedures related to concrete maintenance including, but not limited to, the following:
a. Verify concrete-maintenance specialist's personnel, equipment, and facilities needed to make progress and avoid delays.
b. Materials, material application, sequencing, tolerances, and required clearances.
c. Quality-control program.
d. Coordination with building occupants.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Concrete Damage Report.
1.5 INFORMATIONAL SUBMITTALS
A. Material certificates.
B. Product test reports.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Comply with manufacturer's written instructions for minimum and maximum temperature requirements and other conditions for storage.
B. Store cementitious materials off the ground, under cover, and in a dry location.
C. Store aggregates covered and in a dry location; maintain grading and other required characteristics and prevent contamination.
1.7 FIELD CONDITIONS
A. Cold-Weather Requirements for Cementitious Materials: Do not apply unless concrete-surface and air temperatures are above 40 deg F and will remain so for at least 48 hours after completion of Work.
B. Hot-Weather Requirements for Cementitious Materials: Protect repair work when temperature and humidity conditions produce excessive evaporation of water from patching materials.
Provide artificial shade and wind breaks, and use cooled materials as required. Do not apply to substrates with temperatures of 90 deg F and above.
MAINTENANCE OF CAST-IN-PLACE CONCRETE 030130 - 3
PART 2 - PRODUCTS
2.1 PATCHING MORTAR
A. Basis of Design Product: Subject to compliance with requirements, provide Zono-Patch by
Siplast or provide one of the following products:
1. Securock® Brand Gypsum-Concrete Patch by United States Gypsum Company
2. QUIKRETE® Concrete Patching Compound by QUIKRETE Companies, The
B. Source Limitations: Obtain patching mortar from manufacturer approved by membrane roofing manufacturer.
2.2 MISCELLANEOUS MATERIALS
A. Water: Potable.
2.3 MIXES
A. General: Mix products, in clean containers, according to manufacturer's written instructions.
B. Do not add water, thinners, or additives unless recommended by manufacturer.
C. When practical, use manufacturer's premeasured packages to ensure that materials are mixed in proper proportions.
1. When premeasured packages are not used, measure ingredients using graduated measuring containers; do not estimate quantities or use shovel or trowel as unit of measure.
D. Do not mix more materials than can be used within time limits recommended by manufacturer.
Discard materials that have begun to set.
PART 3 - EXECUTION
3.1 CONCRETE MAINTENANCE
A. Comply with manufacturers' written instructions for surface preparation and product application.
3.2 EXAMINATION
A. After removal of roofing materials and cleaning of existing cast-in-place concrete roof deck areas of deteriorated or delaminated concrete using hammer or chain-drag sounding and mark boundaries.
MAINTENANCE OF CAST-IN-PLACE CONCRETE 030130 - 4
1. Locate areas of spalled and chipped concrete that will impair adhesion of roofing system.
2. Mark areas for removal by simplifying and squaring off boundaries.
3. Photograph damaged areas and indicated location of damaged areas on roof plan, with cross references to corresponding photographs.
4. Submit photographs and roof plan in concrete damage report.
3.3 PREPARATION
A. Ensure that supervisory personnel are on-site and on duty when concrete maintenance work begins and during its progress.
B. Protect persons, motor vehicles, surrounding surfaces of building being repaired, building site, plants, and surrounding buildings from harm resulting from concrete maintenance work.
1. Comply with each product manufacturer's written instructions for protections and precautions. Protect against adverse effects of products and procedures on people and adjacent materials, components, and vegetation.
2. Use only proven protection methods appropriate to each area and surface being protected.
3. Provide temporary barricades, barriers, and directional signage to exclude public from areas where concrete maintenance work is being performed.
4. Erect temporary protective covers over walkways and at points of pedestrian and vehicular entrance and exit that must remain in service during course of concrete maintenance work.
5. Contain dust and debris generated by concrete maintenance work and prevent it from reaching the public or adjacent surfaces.
6. Use water-mist sprinkling and other wet methods to control dust only with adequate, approved procedures and equipment that ensure that such water will not create a hazard or adversely affect other building areas or materials.
7. Protect roof deck and other surfaces along haul routes from damage, wear, and staining.
8. Provide supplemental sound-control treatment to isolate removal and dismantling work from other areas of the building.
9. Protect adjacent surfaces and equipment by covering them with heavy polyethylene film and waterproof masking tape or a liquid strippable masking agent.
a. If practical, remove items, store, and reinstall after potentially damaging operations are complete.
10. Neutralize and collect alkaline and acid wastes for disposal off Owner's property.
11. Dispose of debris and runoff from operations by legal means and in a manner that prevents soil erosion, undermining of paving and foundations, damage to landscaping, and water penetration into building interiors.
C. Existing Drains: Prior to the start of work in an area, test drainage system to ensure that it is functioning properly. Notify Architect immediately of inadequate drainage or blockage. Do not begin work in an area until the drainage system is in working order.
1. Prevent solids such as aggregate or mortar residue from entering the drainage system.
Clean out drains and drain lines that become sluggish or blocked by sand or other materials resulting from concrete maintenance work.
MAINTENANCE OF CAST-IN-PLACE CONCRETE 030130 - 5
2. Protect drains from pollutants. Block drains or filter out sediments, allowing only clean water to pass.
D. Preparation for Concrete Removal: Examine construction to be repaired to determine best methods to safely and effectively perform concrete maintenance work. Examine adjacent work to determine what protective measures will be necessary. Make explorations, probes, and inquiries as necessary to determine condition of construction to be removed in the course of repair.
1. Verify that affected utilities have been disconnected and capped.
2. Inventory and record the condition of items to be removed for reinstallation or salvage.
3.4 REMOVAL OF CONCRETE
A. Do not overload structural elements with debris.
B. Saw-cut perimeter of areas indicated for removal to a depth of at least 1/2 inch.
1. Make cuts perpendicular to concrete surfaces and no deeper than cover on reinforcement.
C. Remove deteriorated and delaminated cast-in-place concrete by breaking up and dislodging from reinforcement.
D. Remove additional concrete if necessary to provide a depth of removal of at least 1/2 inch over entire removal area.
E. Test areas where concrete has been removed by tapping with mallet, and remove additional concrete until unsound and disbonded concrete is completely removed.
F. Provide surfaces with a fractured profile of at least 1/8 inch that are approximately perpendicular or parallel to original concrete surfaces.
1. At columns and walls, make top and bottom surfaces level unless otherwise directed.
G. Thoroughly clean removal areas of loose concrete, dust, and debris.
3.5 INSTALLATION OF PATCHING MORTAR
A. Place patching mortar as specified in this article unless otherwise recommended in writing by manufacturer.
1. Provide forms where necessary to confine patch to required shape.
2. Wet substrate and forms thoroughly and then remove standing water.
B. General Placement: Place patching mortar by troweling toward edges of patch to force intimate contact with edge surfaces.
MAINTENANCE OF CAST-IN-PLACE CONCRETE 030130 - 6
1. For large patches, fill edges first and then work toward center, always troweling toward edges of patch.
2. At fully exposed reinforcing bars, force patching mortar to fill space behind bars by compacting with trowel from sides of bars.
C. Consolidation: After each lift is placed, consolidate material and screed surface.
D. Multiple Lifts: Where multiple lifts are used, score surface of lifts to provide a rough surface for placing subsequent lifts. Allow each lift to reach final set before placing subsequent lifts.
E. Finishing: Allow surfaces of lifts that are to remain exposed to become firm and then finish to a surface matching adjacent concrete.
F. Curing: Wet-cure cementitious patching materials, including polymer-modified cementitious patching materials, for not less than seven days by water-fog spray or water-saturated absorptive cover.
END OF SECTION 030130
STEEL DECKING 053100 - 1
SECTION 053100 - STEEL DECKING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Roof deck.
1.2 DEFINITIONS
A. "Approved": When used to convey Architect's action on Contractor's submittals, applications, and requests, "approved" is limited to Architect's duties and responsibilities as stated in the
Conditions of the Contract.
B. "Directed": A command or instruction by Architect. Other terms including "requested,"
"authorized," "selected," "required," and "permitted" have the same meaning as "directed."
C. "Indicated": Requirements expressed by graphic representations or in written form on
Drawings, in Specifications, and in other Contract Documents. Other terms including "shown,"
"noted," "scheduled," and "specified" have the same meaning as "indicated."
D. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work.
E. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations.
F. "Install": Unload, temporarily store, unpack, assemble, erect, place, anchor, apply, work to dimension, finish, cure, protect, clean, and similar operations at Project site.
G. "Provide": Furnish and install, complete and ready for the intended use.
H. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built.
I. “Installer Qualifications”: A firm or individual experienced in installing, erecting, applying, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.
STEEL DECKING 053100 - 2
1.3 ACTION SUBMITTALS
A. Product Data: For the following:
1. Roof deck.
B. Shop Drawings:
1. Include layout and types of deck panels, anchorage details, reinforcing channels, pans, cut deck openings, special jointing, accessories, and attachments to other construction.
1.4 INFORMATIONAL SUBMITTALS
A. Welding certificates.
1.5 QUALITY ASSURANCE
A. Qualifications:
1. Welding Qualifications: Qualify procedures and personnel in accordance with
SDI QA/QC and the following welding codes:
a. AWS D1.1/D1.1M.
b. AWS D1.3/D1.3M.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Protect steel deck from corrosion, deformation, and other damage during delivery, storage, and handling.
B. Store products in accordance with SDI MOC3. Stack steel deck on platforms or pallets and slope to provide drainage. Protect with a waterproof covering and ventilate to avoid condensation.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. AISI Specifications: Comply with calculated structural characteristics of steel deck in accordance with AISI S100.
STEEL DECKING 053100 - 3
2.2 ROOF DECK
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. ASC Steel Deck; ASC Profiles, LLC.
2. DACS, Inc.
3. Epic Metals Corporation.
4. Verco Decking, Inc.; a Nucor company.
5. Vulcraft Group; Division of Nucor Corp.
6. Vulcraft/Verco Group; a division of Nucor Corp.
B. Fabrication of Roof Deck: Fabricate panels, without top-flange stiffening grooves, to comply with SDI RD and with the following:
1. Galvanized-Steel Sheet: ASTM A653/A653M, Structural Steel (SS), Grade 33, G60 zinc coating.
2. Deck Profile: Type B, wide rib.
3. Profile Depth: 1-1/2 inches.
4. Design Uncoated-Steel Thickness: 0.0358 inch.
2.3 ACCESSORIES
A. Provide manufacturer's standard accessory materials for deck that comply with requirements indicated.
B. Mechanical Fasteners: Corrosion-resistant, low-velocity, power-actuated or pneumatically driven carbon-steel fasteners; or self-drilling, self-threading screws.
C. Side-Lap Fasteners:…