ADDENDUM 1.pdf
PDF 2 MB Posted
- Attached to
- 26-06 Cer962218C (Cerro Gordo)
- Solicitation number
- 26-06 Cer962218C (Cerro Gordo)
- Issued by
- Carroll County, Iowa
About this file
This is Addendum No. 1 to the bid documents for the Iowa Department of Agriculture and Land Stewardship (IDALS), Division of Soil Conservation and Water Quality, for Project CER962218C, a nutrient reduction wetland construction project in Cerro Gordo County. The addendum, issued July 9, 2026, modifies the original bid documents posted June 14, 2026, and requires all bidders to acknowledge receipt on the updated Document CC Proposal and Schedule of Prices form under penalty of disqualification. The scope includes selective clearing, excavation, grading, installation of inlet and outlet concrete structures, two concrete manholes, 3,762 linear feet of tile installation (12-inch, 15-inch, and 24-inch reinforced concrete pipe; 12-inch dual-wall HDPE pipe; and 15-inch dual-wall CPDT), 22 tons of riprap, 1,202 square yards of turf reinforcement mat, and approximately 10.2 acres of seeding across 33,356 cubic yards of earthwork. Sealed bids must be submitted via the Iowa Management of Procurement and Contracts System (IMPACS) no later than 3:00 p.m. on July 16, 2026, with bids opened the same day. A mandatory pre-bid meeting was held July 1, 2026, at Lynne Lornzen Park in Ventura, Iowa. Construction must commence within 14 days of the preconstruction conference and be substantially complete by June 15, 2027, with buffer seeding completed by June 30, 2027, and structural seeding by September 15, 2027. All prospective bidders must be registered with the Iowa Department of Inspections, Appeals & Licensing.
Addendum No. 1 adds new Plan Sheet B.03, detailing the Modified SW-513 Inlet Structure design and construction specifications, and revises Specification CS-008 to replace the 48-inch by 48-inch sign installation detail with a 72-inch by 120-inch sign installation detail, with sign panels provided by IDALS and the contractor responsible for posts, hardware, and installation. Bidders must submit a proposal guarantee equal to ten percent of the base bid amount; the successful contractor must furnish a Performance/Payment Bond equal to one hundred percent of the contract price within fourteen days of receiving the Notice-of-Award. Payment will be made monthly at 97 percent of work completed, with liquidated damages of $175 per day for work not completed by June 15, 2027, and $125 per day for seeding not completed by the respective dates. The estimated construction cost range is $350,000 to $400,000. This is a unit price contract where prices shall cover all complete work and include all costs incidental thereto unless otherwise indicated. No sales tax applies to materials purchased. Bidders must also complete and notarize the affidavit affirming they have examined all contract documents, prepared the proposal in detail, and have not engaged in collusion or fraud. Questions regarding plans and specifications must be directed to Brandon Short, P.E., at Bolton & Menk Inc. (brandon.short@bolton-menk.com or 515-509-9296), with copies to Tracy Blocker at IDALS (tracy.blocker@iowaagriculture.gov or 515-344-6279); all other questions should be addressed to Tracy Blocker.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Soil Conservation and Water Quality
Cover Page: Pre-Bid Minutes, Questions, Addenda
To: All plan holders From: Tracy Blocker, Division
Pages: Phone: 515-344-6279
Re: Cer962218C Nutrient Reduction Wetland (Bid #26-05) Date: July 12, 2026
Comments: Page
• Cover Page 1
• Addendum No. 1 with Attachments 1, 2 & 3 2 - 10
• Pre-Bid Meeting Minutes 11 - 15
• Pre-Bid meeting attendance list 16
• Updated plan holders list 17 - 19
• Electronic files for grading can be obtained by e-mail by contacting Brandon Short with Bolton & Menk Inc at brandon.short@bolton-menk.com or (515) 509-9296
- END OF COVER PAGE -
July 9, 2026
Division of Soil Conservation and Water Quality 1305 E Walnut Street Des Moines, IA 50319
TO: Prospective Bidders
Subject: Addendum No. 1 to Bid Documents CER962218C Nutrient Reductionl Wetland Project – Bid No. 26-06 Cerro Gordo County, Iowa
This addendum forms a part of the bidding contract documents and modifies the original bidding documents posted on June 14, 2026. An updated bidding form, Document CC.– Proposal and Schedule of Prices is attached with the addendum acknowledged. This updated bidding form must be used for 26-06 and all bidders must acknowledge this addendum on Page CC-2. FAILURE TO DO SO WILL SUBJECT BIDDER TO DISQUALIFICATON.
Description:
DOCUMENT CC– PROPOSAL AND SCHEDULE OF PRICES, 26-06 (See Attachment No.1)
Please use the updated Document CC, to acknowledge Addendum No. 1 (See Attachment No. 1):
Plans (See Attachment No. 2) New Plan B.03 is being added to the engineering plans set, to include the design and construction details of Bid Item #12 “Modified SW-513 Inlet”.
Specifications (See Attachment No. 3)
Specifications CS 008 “Mobilization and Demobilization” has been modified to replace the installation details of a 48” x 48” sign with the installation details of a 72” x 120” sign. IDALS will provide the sign only.
Sincerely, Sara Smith, P.E.
Water Resources Bureau
Attachment No. 1 – Updated Document CC Attachment No. 2 – New Plan B.03.
Attachment No. 3 – Specification CS 008, use the large sign installation details.
End of Addendum No. 1
CER962218C Nutrient Reduction Wetland Project DOCUMENT CC – Attachment 1 Bid No. 26-6 PROPOSAL AND SCHEDULE OF PRICES
Time and Date for Bid Submissions: 3:00:00 PM, 07/16/2026
BIDDER LOGIN –
https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIo wa
Time and Date of Bid Opening: 3:00 PM, July 16, 2026
Bid Opening TEAMS: 469-998-7627, code 596080221#
Project Description and Location: Cer962218C Nutrient Reduction Wetland Project
Section 18, Township 96 North, Range 22 West Cerro Gordo County, Iowa
PROPOSAL AND SCHEDULE OF PRICES
Proposal of________________________________________________________________________________________ (PRINT Name of Bidder: COMPANY & CONTACT)
Located at ______________________________________________(______)________________________________
(FULL Address) (Telephone Number)
Amount of
Proposal Guarantee
Description of Work Specified Completion Date Liquidated Damages
10% of Base Bid
All Work Except Seeding
June 15, 2027
$175.00 Per Day
Seeding - Buffer Seeding – Structure
06/30/2027 09/15/2027 $125.00 Per Day
The undersigned hereby agrees, if awarded the contract, to execute the proposed contract and to furnish satisfactory Performance Bond in an amount not less than one hundred percent (100%) of the contract award within fourteen (14) days from the date when Notice-of-Award is received, and to provide all supervision, labor, materials, and equipment required to complete the project designated above, for the prices hereinafter set forth, in strict compliance with the Contract Documents prepared by the Division.
Further, the parties agree and acknowledge as follows:
The amount of loss or damages likely to be incurred by Division are uncertain and said loss is incapable or very difficult to quantify and estimate;
The amount specified for liquidated damages herein bear a reasonable relationship to, and are not plainly or grossly disproportionate to, the probable loss likely to be incurred by Division in connection with any delay on part of the Contractor;
The amount of liquidated damages fixed herein bears a reasonable relationship to Division’s anticipated losses and/or actual losses;
The amount of liquidated damages herein fairly approximates Division’s loss at the time of making of this Agreement;
The amount of liquidated damages fixed herein are fair and reasonable and it approximates to the extent possible the actual loss to Division as a result of any delay on the part of Contractor; and
Division and Contractor are sophisticated parties and negotiated this Agreement at arm’s length.
Now therefore, in consideration of the mutual obligations set forth herein, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows
Contractor will commence the work after the Preconstruction Conference and by the Construction Start Date approved by Division in the Construction Progress Schedule.
Contractor will complete the work within the specified time period identified in the contract, or as amended, or be responsible for liquidated damages per day as set forth in the above table.
The liquidated damages may be withheld from payments made to the Contractor by the Division upon written notice that liquidated damages have begun to accrue, and such damages are in addition to other remedies available as provided for in this contract and applicable law.
A Proposal Guarantee in the amount stipulated herein is included with this proposal, to be forfeited to the Division, if the undersigned fails or refuses to execute the contract and furnish satisfactory Performance Bond, if awarded the contract.
By (Signed)
( PRINT NAME)
(Title) (Date)
In executing this proposal, Bidder acknowledges receipt of Addendum Number dated
THE FOLLOWING AFFIDAVIT MUST BE COMPLETED AND NOTARIZED, OR THIS BID WILL BE REJECTED
AFFIDAVIT
The signatory, being duly sworn, does depose and say that the undersigned is an authorized representative of:
(Name of Firm)
Located at hereinafter referred to as “Bidder” and does hereby affirm to have personal knowledge that said Bidder has thoroughly examined the Contract Documents, carefully prepared the Proposal and Schedule of Prices form, and has checked the same in detail before submitting; and that said Bidder, or the agents, officers, or employees thereof, have not, either directly or indirectly, entered into any agreement, participated in any collusion or fraud, or otherwise taken any action in restraint of free competitive bidding in connection with this bid.
(Signed)
(PRINT name)
Subscribed and sworn to before me this day of , 20
(Signed, Notary)
My Commission Expires , 20
Must include notary stamp
SCHEDULE OF PRICES
CER962218C Project Contract 26-06 Section 18, Township 96 North, Range 22 West, Cerro Gordo County, Iowa
Name of Bidder:
IMPACS
No
Item No.
Work or Material
Spec No.
Est.
Qty.
Unit Unit Price
Total
1.1 1 Site stripping & preparation IA CS-001 1 LS
2 Crop damage IA CS-001
3 Seeding
1.2 A Buffer seeding IA CS-006 9.1 AC
1.3 B Structure & Channel Seeding IA CS-006 1.1 AC
1.4 4 Mobilization and demobilization IA CS-008 1 LS
1.5 5 Drain tile investigation and removal IA CS-009 8 HR.
1.6 6 Excavation (General) IA CS-021 32,583 CY
1.7 7 Earthfill (General) IA CS-023 773 CY
8 Reinforced Concrete Pipe
1.8 A 12" IA CS-031 352 LF
1.9 B 15" IA CS-031 538 LF
1.10 D 24" IA CS-031 959 LF
1.11 9 Dual-Wall HDPE Pipe - 12" Diameter IA CS-046 371 LF
1.12 10 Dual-Wall CPDT - 15" Dia. IA CS-046 1,542 LF
1.13 11 Tile Connection - 12" Dia. Or Larger IA CS-046 3 EA
1.14 12 Modified SW-513 - Inlet IA CS-031 1 EA
1.15 13 Modified SW-513 - Outlet IA CS-031 1 EA
1.16 14 SW-401 Manhole (48" Diameter) IA CS-031 1 EA
1.17 15 SW-401 Manhole (60" Diameter) IA CS-031 1 EA
1.18 16 15" Apron, Footing, Bar Guard IA CS-031 2 EA
1.19 17 Class E Rip Rap IA CS-061 22 TN
1.20 18 Turf Reinforcement Mat IA CS-095 1,202 SY
TOTAL BASE BID .................................................................................................................................. $ _____________ Worksheet purposes only. Bids will only be accepted through the on-line Iowa Management of Procurement & Contracts System
(IMPACS).
To register and learn about IMPACS, go to: https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa
END OF DOCUMENT CC
ATTACHMENT 2
NEW PLAN B.02
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\0 t7
\C
AD
\C 3D
\1
5B
.d w g
7/ 2/
:5
9:
P M
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
IDALS PROJ. NO. CER962218C
BCS
BCS
JPR
0T7.133265
1.0 PLANS FOR BID 2025-05-27
1.1 UPDATED BID PLANS 2026-06-15
1519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
B.03
INLET STRUCTURE DETAIL
SECTION
MODIFIED SW-513
INLET STRUCTURE
BOLT ON 3 8" STEEL WEIR PLATE WITH 38"
GALVANIZED STEEL EXPANSION ANCHORS
PROVIDE EXTERIOR GRADE SEALANT
BEHIND WEIR PLATE
SEE SHEET SUDAS FOR SW-513 DETAILS
PRECAST STRUCTURE SHALL BE ONE SECTION OR
PROVIDE WATERTIGHT SEAL BETWEEN SECTIONS.
TOP OF STRUCTURE ELEVATION (1234.50)
WEIR CREST ELEVATION (1233.50)
PRECAST OPENING ELEVATION (1232.50)
47-1/2" x 47-1/2" x 1.5" GALVANIZED STEEL
GRATE TOP. BOLT TO STEEL ANGLE AT ALL 4
CORNERS WITH 38" BOLTS, WASHERS AND NUTS.
GALVANIZED STEEL ANGLE L 2x2x1 4 , ANCHOR TO WALL WITH 3 8" EXPANSION
ANCHORS, SPACED 8" APART. TYPICAL 3
SIDES OF STRUCTURE.
BOLT GALVANIZED STEEL GRATE TO
GALVANIZED STEEL ANGLE AT EACH
PLAN
MODIFIED SW-513
INLET STRUCTURE
B.03
48" WALL
WIDTH
48" WALL WIDTH
58"
1.0'
1.25'
NOT TO SCALE
NOT TO SCALE
6" SUMP
FL ELEV (SEE PROFILE)
SEE SUDAS FOR SW-513 DETAILS
INLET PIPE
7 FT x 7 FT x 1.5 FT DEEP RIP RAP (4.1 TN)
WITH GEOTEXTILE
NOTES:
1. BAR GRATE SHALL BE McNICHOLS HEAVY DUTY
WELDED GHB-100, 19 W-4, OR APPROVED EQUAL.
2. ALL FASTENERS SHALL BE GALVANIZED OR
STAINLESS STEEL.
3. WEIR PLATE, STEEL GRATE, AND ALL HARDWARE
AND APPURTENANCES SHOWN ON THIS PAGE OR
REQUIRED FOR INSTALLATION ARE SUBSIDIARY TO
THE INLET STRUCTURE.
BEDDING PER SUDAS
48" WALL WIDTH
1'
EXCAVATED WETLAND POOL
PROVIDE FLEXIBLE, WATERTIGHT GASKET FOR PIPE OPENINGS
NORMAL POOL ELEVATION (1233.00)
ATTACHMENT 3
CS 008, Large sign installation details
EXISTING SOIL SURFACE
16" HOLES LOCATED AS SHOWN, PRE-PUNCHED
BY SIGN FABRICATOR. FASTEN SIGN TO POSTS
WITH 3/8" DIA. STEEL BOLT & NUT SET, SEE
BOLT, WASHER, & NUT FASTENER DETAIL THIS
SHEET (12 SETS REQ'D. PROVIDED AND
INSTALLED BY CONTRACTOR).
6"x6"x16' PRESSURE-TREATED POST (TYP.), SEALED WITH THOMPSON'S WATER SEAL OR
EQUAL. POSTS, SEALANT, AND INSTALLATION
PROVIDED BY CONTRACTOR.
SIGNAGE NOTES:
1. DIVISION WILL FURNISH SIGN PANELS. CONTRACTOR IS RESPONSIBLE FOR PROVIDING POSTS, HARDWARE, AND INSTALLATION FOR ALL PANELS.
2. ALL EXPOSED WOOD SHALL BE SEALED WITH THOMPSON'S WATER SEAL OR EQUAL MEETING
ASTM D-4446-08.
3. ALL STEEL HARDWARE PIECES SHALL BE GALVANIZED OR RUST RESISTANT.
4. NYLON AND STEEL WASHERS SHALL BE USED AS SHOWN ON THE BOLT, WASHER, NUT FASTENER
DETAIL ABOVE.
5. CLEAR UTILITIES WITH IOWA ONE-CALL (800) 292-8989 BEFORE EXCAVATING FOR POSTS.
6. SECURE DIVISIONS APPROVAL FOR SIGN LOCATION BEFORE INSTALLATION.
7. CONTRACTOR SHALL INSTALL SIGN POSTS USING A PLYWOOD OR OTHER SUITABLE TEMPLATE
TO MAINTAIN ACCURATE POST SPACING AND ALIGNMENT DURING BACKFILLING OF THE POST
HOLES WITH CONCRETE. THE TEMPLATE SHALL REMAIN IN PLACE FOR 5 FULL CALENDAR DAYS TO
ALLOW CURING OF CONCRETE. POSTS SHALL NOT BE INSTALLED OR BACKFILLED WITH SIGN
PANELS ATTACHED TO AVOID BENDING OF THE SIGN PANELS.
BOTTOM
PANEL
TOP
PANEL
4" 35"
60" MIN.
36"
36"
BOLT, WASHER, & NUT
FASTENER DETAIL
NOT TO SCALE
STEEL WASHER
HEAD
NYLON WASHER AGAINST FACE
OF SIGN
STEEL WASHER
BACK OF POSTNUT
THICKNESS FOR
SIGN & POST
60" MIN.
4-1/2"
2"
4"
BACKFILL WITH CONCRETE
2"
120"
Large Sign Standard Detail Division of Soil Conservation and Water Quality
10" MIN.
15"
CERRO GORDO COUNTY WETLAND PROJECT
CER962218C - BID NO. E26-06
PREBID MEETING, 210 E Lake St Ventura IA 50482 July 1, 2026 - 1:00 PM
Tracy Blocker, Division of Soil Conservation and Water Quality (Division) opened the meeting.
A) Introductions
• Sara Smith, Engineer with Division
• Brandon Short, P.E., Bolton & Menk Inc
• Others: See sign-in sheet
• There are 3 projects being bid at this time, including this one, one in Wright County and one in
Chickasaw County.
• This wetland project is part of the Water Quality Initiative that is being used to help implement the Iowa Nutrient Reduction Strategy.
B) Bidding
1. Time of Completion:
• The final date for completion of all work except for seeding is set for 06/15/2027.
The final date for completion of seeding is Buffer 06/30/2027 and the Structure 09/15/2027
2. Liquidated Damages:
• There are liquidated damages provisions - absent a No-Fault Extension
• If all work except for seeding is not completed by June 15, 2027, $175 per day.
• If the seeding is not subsequently completed by the respective dates $125 per day.
Buffer 06/30/2027 and the Structure 09/15/2027
3. Taxes:
• There is no sales tax for materials purchased
• This should be considered when determining the unit prices submitted in the bid
4. Measurement and Payment:
• The specifications describe the method to be used in measuring and calculating the payment quantities
• Payments will be made based on monthly estimates at 97% of the work completed
• Mobilization is paid as percentage completed of the lump sum (less retainage)
• 97% of the cost of materials stored on site can be paid by submitted an invoice
5. Method of Bidding:
• This is a unit price contract
• Prices shall cover complete work and include all costs incidental thereto unless otherwise indicated
• The base bid includes all items 1 through 18 Engineer’s list / 1.1 – 1.20 IMPACS list (crop damage).
A separate Document CC was provided with the bid package that may be used as a worksheet
• ALL bids must be submitted through our IMPACS site.
• Any questions must be submitted to us by July 8, 2026.
• Make sure acknowledged the addendum, if applicable
• If work is added to the contract after execution a Change Order or Contract Amendment will be issued as required
• Extension of the contract completion date(s), a Contract Amendment
6. Submission of Bids and Bid Security:
• Bids must be submitted on the 'Items' page within IMPACS and shall include a bid bond in the amount of ten percent (10%) within the 'Prerequisites' page on this IMPACS post.
https://das.iowa.gov/vendors/bidding-opportunities#vendor-bid-opportunities (IMPACS site)
• View Other Agency Hosted Solicitations Sort by Agency: Agriculture & Land Stewardship https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa (Log into
IMPACS)
• Bidders must also be registered with the Iowa Department of Inspections, Appeals, & Licensing https://laborportal.iwd.iowa.gov/iwd_portal/dashboards/contractor-home
IMPACS “101”
TAB 1 – Summary TAB 2 – Prerequisites: Question 3 TAB 3 – Buyer(IDALS) Attachments including addendum, if applicable TAB 4 – Supplier(You) Attachments, shouldn’t need – Upload Bid Bond & Doc EE & Doc CC Proposal-Acknowledgment-Affidavit TAB 5 – Questions: answer 1 - 3 TAB 6 – Items: enter in each unit cost, note you need to hit “enter” for it to calculate
You do not need to complete the Estimated Delivery date. It is common to have multiple pages on this TAB. Page arrows are at the bottom left while next in bottom right will take you to TAB 7.
TAB 7 – Review & Submit: Green check marks, check the Certification at the bottom and submit
• Any time prior to close, you may withdraw or edit you bid.
• Doc CC must be signed by a legally authorized representative of the Bidder and notarized.
• All issued addendum shall be acknowledged on page 2 of Doc CC as received by the Bidder.
• Do not submit Plans or Specifications with the bid.
• If any form is not accurately completed, it could prevent the reading of that Bidder's bid.
• Bid Security or bid bond, ten percent (10%) of the base bid. If the Bidder elects to use a bid bond, the bidder shall complete Proposal Guarantee Bond (Document EE) and upload with the Bid Bond. If you use a cashier’s check, it must be delivered 3 hours prior to bid opening. Your bid must still be in IMPACS https://das.iowa.gov/vendors/bidding-opportunities#vendor-bid-opportunities https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa
• All bids are due no later than 3:00 PM Thursday, July 16, 2026 via IMPACS
• Bids received after this time will be locked out.
• Bids may NOT be mailed or hand delivered.
• If you bid on multiple projects but don’t want all, you must email Tracy.Blocker@iowaagriculture.gov prior to close and follow up with a call to be sure the email was received and seen.
7. Evaluation of bids and award of Construction Contract:
• Shall be awarded to the lowest responsible responsive bidder as determined by the Division.
• The Division may consider such factors as alternates, bid price, experience, contracts in default, responsibility of the Bidder, and similar factors
• IMPACS generate the Bid tab. Still email to bidders. Other plan holders or interested parties must request bid tabulations.
8. Bidder's Qualifications:
1. Required to be registered with the Iowa Department of Inspections, Appeals & Licensing
2. Upon request from the Division, submit a statement of Bidder’s qualifications including experience, any contracts that are in default, available equipment, personnel, and financial ability
9. Execution of Contract:
1. Contracts will not be issued via IMPACS at this time.
2. required to:
execute the Contract;
obtain the appropriate insurance coverage and Performance/Payment Bond;
provide their Iowa Department of Inspections, Appeals & Licensing Registration Number;
Construction Progress Schedule (Document JJ) within fourteen (14) calendar days from the date of receipt of the Notice-of-Award.
3. The Division, within fourteen (14) days of receipt shall sign the Contract Should the Division fail to do so, the Contractor may withdraw in writing the signed Contract
10. The Notice-to-Proceed
a. shall be issued within five (5) days of the execution of the Contract by the Division, provided that the Construction Progress Schedule has been accepted by the Division.
b. additional time required, the time to issue the Notice-to-Proceed may be extended
c. If the Notice-to-Proceed has not been issued within a thirty (30) day period, or within a greater period mutually agreed upon, the Contractor may terminate the Contract
d. Must have an approved schedule before a Notice to Proceed will be issued. Pre-construction meeting will be held within 7 days of construction starting.
11. Questions and Addenda:
• Questions concerning the Plans and Construction Specifications direct to Brandon Short: brandon.short@bolton-menk.com or (515) 509-9296 with Bolton & Menk and must copy Tracy Blocker: tracy.Blocker@iowaagriculture.gov with the Division.
• All other questions concerning the Contract Documents should be addressed to Tracy Blocker, Division: 515 344-6279 or tracy.blocker@iowaagriculture.gov.
mailto:Tracy.Blocker@iowaagriculture.gov mailto:brandon.short@bolton-menk.com
• Any oral interpretations given shall be valid only if confirmed by written addendum.
• All interpretation requests should be addressed in writing and received no later than 3:00 PM July, 8, 2026.
The Division reserves the right to revise or amend the Contract Documents prior to close. Such revisions and amendments shall be announced by an addendum. Copies of such addenda shall be furnished to all plan holders.
• Q: How does a foreign entity (out-of-state) register with the Secretary of State?
A: A foreign business entity can be registered with the State by submitting a Certificate of Authority. You may submit this file through the Fast Track Filing website. The version submitted depends on the type of entity being registered (LLC, Profit, Nonprofit). . All foreign filing applications will look similar and will follow the same trend, though different chapters may have specific requirements as listed on the form. We have simplified the walkthrough by showing how to file for a foreign LLC, but the same general rules apply to all foreign filing forms. Click here to view the step-by-step Foreign LLC filing guide.
After submitting the file, you will receive an email from the Secretary of State notifying you that the form has been accepted. It is recommended that you consult with a private legal counsel for next steps
• Q: Does the Dave-Bacon Act apply?
A: No
C) Engineer’s Discussion:
1. Brandon Short, PE from Bolton & Menk (B&M) provided the following project overview:
• A.02 o An existing tile main runs through the site from southwest to northeast. Laterals come from the west, northwest, north, and southeast. All tiles will be removed under the pool. Those from the southwest and west will be daylighted, the one from the southeast will be re-routed, and the two from the north will be left intact but most of the flow will be directed to the wetland.
o The wetland pool will be excavated.
• A.03 o This shows the existing tiles and those that will be removed with the project. The landowner indicated there is a tile intake south of the north-south easement line, on the tile main. There is a tile that connects to the main at that location and comes from the northwest up the hill. This tile will need to be daylighted as well.
o See the notes on this page for removal lengths and intervals.
• B.02: Everything on this sheet (except the cover berm) is included in the outlet structure bid item.
Another sheet will be added by addendum to show the inlet structure.
• D.01: All excavated material will be placed in the spoil pile areas, meeting the requirements listed on this sheet.
• K.01: Seeding areas are approximate, and the actual disturbed area will be seeded and paid for. The pool is not seeded.
• M.01: 15” Dual-Wall CPDT may be plowed-in lined corrugated plastic pipe or it may be dual wall sticks.
• M.02 o 15” Dual-Wall CPDT may be plowed-in lined corrugated plastic pipe or it may be dual wall sticks.
o 12” Dual-Wall HDPE must be sticks (N-12 or equal) with F-2 rock bedding. It may not be plowed due to bury depth. This was mis-stated during the meeting.
o SUDAS F-2 bedding is to the top of the pipe https://help.sos.iowa.gov/node/79 o SUDAS R-1 bedding is to the springline o The cover berm and filling of the low area is paid under the earthfill item.
• M.03: Alignment turn can be achieved with a precast elbow or through flexing the joints if that is achievable.
2. Questions & Answers:
Q: Are there any prevailing wages for this project?
A: No.
Q: Site Stripping.
A: Please refer to Specifications CS-001, Bid Item #1.
3. Addendum No. 1 is being issued to include the following revisions to the Plans and Specifications:
i. New Plan Sheet B.03 is being added to the plan set, with the detail for the Modified SW-513
Inlet Structure, Bid Item # 12.
ii. Specifications CS-008, will replace the installation detail for a 48” x 48” sign with the installation detail of a 72” x 120” sign.
Division of Soil Conservation & Water Quality - Water Resources Bureau Plan Holders List for Bid as of Project ID 07/10/2026 Bid Opening Name Email Company Street Address City State Zip code Phone
26-04 Chi941410B Consultant NATHAN BLANKMAN NBLANKMAN@JEO.COM JEO 724 Simon Ave Carroll IA 51401 712-830-4132 IDALS ASHLEY WOS ASHLEY.WOS@IOWAAGRICULTURE.GOV IDALS Des Moines IDALS TRACY BLOCKER TRACY.BLOCKER@IOWAAGRICULTURE.GOV IDALS Des Moines 515-344-6279
PB TRAVIS LENTZ LENTZEXC@GMAIL.COM LENTZ EXCAVATING ALTA VISTA IA 641-330-6115
PB LENA OSTRANSKY L0STRANSKY@HIGHPLAINS.BIZ HIGH PLAINS STRUCTURAL GROUP LINCOLN NE 402-833-3842
PB CHAD WILTZEN CW@BRUENINGROCK.COM SKYLINE CONSTRUCTION DECORAH IA 563-392-2933
PB COLBIE SCHMIDT DREWELOW360@GMAIL.COM CEDAR RIDGE PRECISION (ADAM DREWELOW) 2721 AMHERST BLVD NASHUA IA 319-415-8494 PB BRENT MEHMERT BRENT@MEHMERTTILING.BIZ MEHMERT TILING LIME SPRINGS IA 319-240-9930
Cory Bacon baconconcrete@neitel.net Bacon Concrete 370 N Bancroft St, PO Box 188 Postville IA 52162 563-864-7602 Jared Mains jncconstructionllc@gmail.com JNC Construction LLC 609 3rd St PO Box 46 Clearfield IA 50840 515.577.2066 James Seehusen jamess@pcius.com PCI PO Box A Reinbeck IA 50669 319-788-4764 Braxton Rottinghaus braxtonr@pcius.com PCI 104 Blackhawk Street Reinbeck IA 50669 319-560-9845 Chad McDonald cmcdonald@gehrkeinc.com Gehrke Inc 1405 21st Ave Eldora IA 50627 641.858.6953
PR Cindy Adams Cadams@mbi.build Master Builders of Iowa 4100 Westown Pkwy West Des Moines IA 50266 515-402-9858 PR Kira Rieck krieck@mbi.build Master Builders of Iowa 4100 Westown Pkwy West Des Moines IA 50266 515-288-8904 PR Adam DoBraska ADoBraska@mbi.build Master Builders of Iowa 4100 Westown Pkwy West Des Moines IA 50266 515-777-5054
Lacey quotes@coleexcavating.com Cole Excavating, LLC 641.823.4700 Staci Snitker sas@brueningrock.com SKYLINE CONSTRUCTION 900 Montgomery St PO Box 127 Decorah IA 52101 563-382-2933 Christina mattconstructioninc@gmail.com MATT Construction Inc 203 Y Ave Sumner IA 50674 563-578-8418
PR source1@mbi.build Master Builders of Iowa Eric Deters edeters@melleninc.com Mellen & Associates Inc Council Bluffs 712-322-9333 Chad McDonald cmcdonald@gehrkeinc.com Gehrke Inc 1405 21st Ave Eldora IA 50627 641.858.6953 Jordan Krull jordan@leymaster.com Leymaster Tile Cedar Falls 319-30-5057 Archy Evans archy.evans@construction.com Dodge Construction 844-326-3826 Chad Borsheim ceb@brueningrock.com Bruening Rock Products/Skyline Materials/Bullseye Trucking 515-460-5462
26-04 26-05 26-06
July 16, 2026 @ 3:00 PM Chi941410B Wri922420D Cer962218C
26-05 Wri922420D Consultant ANDRES SCHIPPERS aschippers@ducks.org Ducks Unlimited 209 Eugene St Radcliffe IA 832-704-3286 Consultant LUCAS WOODBURY LWOODBURY@DUCKS.ORG Ducks Unlimited HUXLEY IA 815-826-0920 IDALS SARA SMITH SARA.SMITH@IOWAAGRICULTURE.GOV IDALS Des Moines 515-422-7335 IDALS TRACY BLOCKER TRACY.BLOCKER@IOWAAGRICULTURE.GOV IDALS Des Moines 515-344-6279
PB LYLE REACDON MNL 8740 77TH ST NE OSTEGO MN 55362 612-221-0475
PB LENA OSTRANSKY L0STRANSKY@HIGHPLAINS.BIZ HIGH PLAINS STRUCTURAL GROUP LINCOLN NE 402-833-3842
PB GRANT ARNDORFER GRANT@DORNBIERINC.COM DORNBIER INC. WESLEY IA 515-341-6881
PB CHASE DUESENBERG VENTURA IA 641-529-0562
Darin Eastvold bids@larsonscontracting.com Larson Contracting Central LLC 508 W Main St PO Box 7 Lake Mills IA 50450 406.890.4211 Jared Mains jncconstructionllc@gmail.com JNC Construction LLC 609 3rd St PO Box 46 Clearfield IA 50840 515.577.2066 Marilyn Vonnahme leorysoninc@gmail.com Leroy and Sons, Inc. 405 Dunlap Street Arcadia IA 51430 712-790-9956 James Seehusen jamess@pcius.com PCI PO Box A Reinbeck IA 50669 319-788-4764 Douglas Schmidgall douglas.schmidgall@oldcastle.com Oldcastle Infrastructure 1601 E 39th St N Sious Falls SD 57104 320-391-6336 Braxton Rottinghaus braxtonr@pcius.com PCI 104 Blackhawk Street Reinbeck IA 50669 319-560-9845 Jodi Johnson hjohnsonservices@gmail.com H. Johnson Services, LLC 1943 180th ST Creston IA 50801 515.681.2224 Corey Johnson corey@molitorconstruction.com Molitor Construction LLC 2528 Eastgate Dr Boone IA 50036 515-212-0724 Evan Hurd evan.hurd@hls-co.com Heritage Land Solutions 302 Broad St Story City IA 50248 515-520-0711 Chad McDonald cmcdonald@gehrkeinc.com Gehrke Inc 1405 21st Ave Eldora IA 50627 641.858.6953
PR Cindy Adams Cadams@mbi.build Master Builders of Iowa 4100 Westown Pkwy West Des Moines IA 50266 515-402-9858 PR Kira Rieck krieck@mbi.build Master Builders of Iowa 4100 Westown Pkwy West Des Moines IA 50266 515-288-8904 PR Adam DoBraska ADoBraska@mbi.build Master Builders of Iowa 4100 Westown Pkwy West Des Moines IA 50266 515-777-5054
Jeff Renier jeff.renier@mnlcorp.com MNL 8740 77th St NE OSTEGO MN 55362 763-295-0010 Lacey quotes@coleexcavating.com Cole Excavating, LLC 641.823.4700 Brook Tuttle brook@mcdowellandsons.com McDowell & Sons Contractors, Inc. 10214 HWY 65, P.O. Box 664 Iowa Falls IA 50126 641-648-5071 Brett Larson jeff@buskellc.com TLC / Buske 515-351-9616
PR source1@mbi.build Master Builders of Iowa Eric Deters edeters@melleninc.com Mellen & Associates Inc Council Bluffs 712-322-9333 Chad McDonald cmcdonald@gehrkeinc.com Gehrke Inc 1405 21st Ave Eldora IA 50627 641.858.6953 Jordan Krull jordan@leymaster.com Leymaster Tile Cedar Falls 319-30-5057 Archy Evans archy.evans@construction.com Dodge Construction 844-326-3826 Chad Borsheim ceb@brueningrock.com Bruening Rock Products/Skyline Materials/Bullseye Trucking 515-460-5462
26-06 Cer962218C Consultant Brandon Short brandon.short@bolton-menk.com Bolton & Menk Inc Engineering 515.509.9296 IDALS SARA SMITH SARA.SMITH@IOWAAGRICULTURE.GOV IDALS Des Moines 515-422-7335 IDALS TRACY BLOCKER TRACY.BLOCKER@IOWAAGRICULTURE.GOV IDALS Des Moines 515-344-6279
PB LYLE REACDON MNL 8740 77TH ST NE OSTEGO MN 55362 612-221-0475
PB LENA OSTRANSKY L0STRANSKY@HIGHPLAINS.BIZ HIGH PLAINS STRUCTURAL GROUP LINCOLN NE 402-833-3842
PB GRANT ARNDORFER GRANT@DORNBIERINC.COM DORNBIER INC. WESLEY IA 515-341-6881
Darin Eastvold bids@larsonscontracting.com Larson Contracting Central LLC 508 W Main St PO Box 7 Lake Mills IA 50450 406.890.4211 Jared Mains jncconstructionllc@gmail.com JNC Construction LLC 609 3rd St PO Box 46 Clearfield IA 50840 515.577.2066 James Seehusen jamess@pcius.com PCI PO Box A Reinbeck IA 50669 319-788-4764 Braxton Rottinghaus braxtonr@pcius.com PCI 104 Blackhawk Street Reinbeck IA 50669 319-560-9845 Jodi Johnson hjohnsonservices@gmail.com H. Johnson Services, LLC 1943 180th ST Creston IA 50801 515.681.2224 Chad McDonald cmcdonald@gehrkeinc.com Gehrke Inc 1405 21st Ave Eldora IA 50627 641.858.6953
PR Cindy Adams Cadams@mbi.build Master Builders of Iowa 4100 Westown Pkwy West Des Moines IA 50266 515-402-9858 PR Kira Rieck krieck@mbi.build Master Builders of Iowa 4100 Westown Pkwy West Des Moines IA 50266 515-288-8904 PR Adam DoBraska ADoBraska@mbi.build Master Builders of Iowa 4100 Westown Pkwy West Des Moines IA 50266 515-777-5054
Jeff Renier jeff.renier@mnlcorp.com MNL 8740 77th St NE OSTEGO MN 55362 763-295-0010 Lacey quotes@coleexcavating.com Cole Excavating, LLC 641.823.4700 Brook Tuttle brook@mcdowellandsons.com McDowell & Sons Contractors, Inc. 10214 HWY 65, P.O. Box 664 Iowa Falls IA 50126 641-648-5071 Douglas Schmidgall douglas.schmidgall@oldcastle.com Oldcastle Infrastructure 1601 E 39th St N Sious Falls SD 57104 320-391-6336 Harley Johnson hjohnsonservices@gmail.com H. Johnson Services LLC 515-681-2224
PR source1@mbi.build Master Builders of Iowa Chad McDonald cmcdonald@gehrkeinc.com Gehrke Inc 1405 21st Ave Eldora IA 50627 641.858.6953 Jordan Krull jordan@leymaster.com Leymaster Tile Cedar Falls 319-30-5057 Archy Evans archy.evans@construction.com Dodge Construction 844-326-3826 Chad Borsheim ceb@brueningrock.com Bruening Rock Products/Skyline Materials/Bullseye Trucking 515-460-5462
X on plan holders list, did NOT sumit bid Y on plan holders list, submitted bid
NP not on plan holders list, submitted bid PB attended pre-bid
IDALS staff PR Plan Room
E Engineer of Record tab Requested bid tab
KEY
| CER962218C Addendum No. 1 Final.pdf |
| Binder1.pdf |
| CER962218C Addendum No. 1.pdf |
| Boehnke Inlet Structure Detail Rev B03_07-09-2026.pdf |
| Sheets and Views |
| 133265B01-B.03 INLET STRUCTURE DETAIL |
| Large_Sign_Detail-revised.pdf |
| Sheets and Views |
| Large_Sign_DETAIL-Layout1 |
File details come from the government source that posted it. Updated .