Addendum_1.pdf
PDF 598 KB Posted
- Solicitation number
- RFQ 171 180000000502 2
- Issued by
- Clinton County, Fruitport Village, Michigan
About this file
This Addendum No. 1, issued April 20, 2018, modifies the original plans and specifications for the Michigan Department of Natural Resources Wildlife Division's workshop building upgrades project located in Gladstone, Michigan. The addendum clarifies project requirements including authorization for simultaneous work on both buildings with work schedules up to ten hours daily, not starting prior to 7:00 a.m. without DNR Wildlife staff approval. Key specifications include installation of propane-fueled mechanical equipment, garage door openers with remote controls rated for 12'x12' insulated doors, and electrical infrastructure upgrades including ceiling-mounted receptacles for garage door openers, 20-amp breakers for each door, and a $3,000 electrical power company allowance incorporated into the lump sum bid price.
The addendum includes a revised Electrical Plan Sheet E101 detailing specific electrical work required throughout the workshop facility. Required electrical additions include a new 220-volt outlet for an air compressor on a dedicated circuit, four new 110-volt outlets for garage door openers, four new exterior light fixtures with motion sensors, and four ceiling-mounted hose reels. Gas-fired infrared heaters with intake vents are specified for heating, with all mechanical equipment operating on propane. Bidders must acknowledge receipt of this addendum on the bid form, and all work specifications and electrical plans must be incorporated into final proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications.pdf | ||
| Advertisement.pdf | ||
| Plans.pdf | ||
| BidSum.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100 Portage Street Houghton, MI 49931
906-482-4810 • 800-562-7684 • Fax: 906-482-9799
Offices also in:
Iron Mountain
Ishpeming Marinette
Sault Ste Marie
U.P. Engineers & Architects, Inc. www.UPEA.com
ADDENDUM NO. 1
File No.751/17107.RAA Index No. 86350
Michigan Department of Natural Resouces Escanaba Wildlife – Workshop Upgrades
Gladstone, Michigan
This ADDENDUM NO. 1, issued on April 20, 2018 is to clarify, modify and/or change the original plans and specifications issued by U.P. Engineers & Architects, Inc. and is hereby made a part of the bidding documents.
Bidders are required to acknowledge receipt of this ADDENDUM NO. 1 on the appropriate place on the Bid Form.
A. General
1. The Mandatory sign in sheet is attached.
2. Both buildings can be worked on at the same time.
3. Work schedule can be up to ten (10) hours, but not starting prior to 7 am or approved through DNR Wildlife staff.
4. All mechanical equipment will be propane.
5. Provide Garage door openers operators rated for the 12’x12’ insulated garage doors with remotes. Add a receptacle on the ceiling for the power supply to opener and 20 amp breaker in breaker panel for each garage door.
6. Provide an electrical power company allowance of $3,000 in your lump sum price.
7. Attached is revised Electrical Plan Sheet E101.
END OF ADDENDUM NO. 1
NEW 220 OUTLET FOR AIR COMPRESSOR
(ON DEDICATED CIRCUIT)
EXISTING
ELEC. PANEL
EXISTING 120
OUTLET, TYP.
U.N.O.
EXISTING
220 OUTLET
NEW 110 OUTLET
FOR GARAGE DOOR
OPENER, TYP. OF (4)
EXISTING
CONDUIT
EXISTING
CONDUIT
NEW EXTERIOR LIGHT FIXTURE
w/ MOTION SENSOR, TYP. OF (4), SEE FIXTURE SCHEDULE
EXISTING
ELEC. PANEL
NEW CONDUIT
AS REQ'D
NEW CONDUIT
AS REQ'D
NEW CONDUIT
AS REQ'D
EXISTING
CONDUIT
NEW CONDUIT
AS REQ'D
NEW CEILING MOUTNED
HOSE REEL, TYP. OF (4)
GAS-FIRED INFRARED HEATER
INTAKE VENT, SEE MECH. DWGS.
MDTMB FILE NO.: 751 / 17107.RAA
INDEX NO.: 86350
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FACILITIES AND BUSINESS SERVICES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ROBERT C. HALL, RA, NCARB, DIRECTOR
MICH. DEPT. OF
NATURAL RESOURCES
- WILDLIFE DIVISION
CONVERT EXISTING
WORKSHOP BUILDING
MEAD RD.
GLADSTONE, MI 49837
ELECTRICAL POWER AND
LIGHTING PLAN
ENGINEERING
ARCHITECTURE
PLANNING
SURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:
CHECKED:
APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREET
HOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREET
ISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.
SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE B
MARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2
IRON MOUNTAIN, MI 49801
(906) 779-0937
A
M
E101
M12-17322
RMA
KAD
KAD
KAD
PROJECT
NORTH
TRUE
NORTH
3/16" = 1'-0"
A1
ELECTRICAL POWER PLAN
PROJECT
NORTH
TRUE
NORTH
90% REVIEW 06/22/2017
3/16" = 1'-0"
A3
ELECTRICAL LIGHTING PLAN