Addendum_1.pdf

PDF 134 KB Posted

Attached to
Port St John WWTF Blower Piping and Valve Replacement
Solicitation number
B-7-25-20
Issued by
Brevard County, Florida

About this file

Addendum 1 is issued by Brevard County Purchasing Services for the Port St John Wastewater Treatment Facility (WWTF) Blower Piping and Valves Replacement project, with bid number B7-25-20. The addendum clarifies several bidder questions and provides key project details, with the bid opening scheduled for Thursday, December 19, 2024, at 10:00 AM. The project involves blower piping and valve replacement, and bidders are advised that the work can be performed while blowers are running, with the ability to isolate valves during construction. The mobilization date will be established at the pre-construction meeting, and the final completion date will depend on the Notice to Proceed (NTP) date.

The addendum indicates that no estimated project value exists, as there was no engineer involvement. The project does not require a bid bond, and blowers can be shut down for 8 to 10-hour intervals if necessary. The system involves only air and will be isolated during work, with no sludge present. Bidders are instructed to acknowledge receipt of the addendum on the Price Sheet, and all other terms and conditions remain unchanged. Additional project-specific details are referenced in three attached images, which are not included in the provided document.

View the file

Other files

File Type Posted
B-7-25-20_Notice_of_Award.pdf PDF
Bid_Tabulation_-_Intent_to_Award.pdf PDF
Image_3.pdf PDF
Image_2.pdf PDF
Image_1.pdf PDF
Attachment_A_-_Approved_Manufacturer's_List.pdf PDF
B-7-25-20_Inv_&_Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchasing Services 2725 Judge Fran Jamieson Way

Building C, Room 303 Viera, Florida 32940

Port St John WWTF Blower Piping and Valves Replacement Bid# B7-25-20

December 11, 2024

ADDENDUM 1

TO ALL PROSPECTIVE BIDDERS

This is an Addendum to and shall be considered as part of the original bid package for the above-mentioned bid.

Please acknowledge receipt of Addendum 1 in space provided on Price Sheet. Bidders are requested to acknowledge receipt of this addendum with their bid.

CLARIFICATION TO QUESTIONS RECEIVED:

Question 1: Does this project have an estimated value, mobilization date, and completion date?

Answer 1: There is no estimated value for this project since there was no engineer involvement. The mobilization date, or Notice to Proceed, will be established at the pre-construction meeting. The final completion date will be based on the NTP date, and the contract time as noted in the bid documents.

Question 2: During demolition is this project going to effect the operation of the plant, will we need to have an alternate blower set up during the project?

Answer 2: We have valves we can isolate so the work can be performed while blowers are running.

Question 3: Does this project require a bid bond?

Answer 3: This project does not require a bid bond.

Question 4: Can the blowers be shut down while work is being performed, if so how long?

Answer 4: If the blowers need to be shut down, they can be shut down in 8hrs to 10hr intervals.

Question 5: Will the system be empty?

Answer 5: It’s just for air, will be isolated.

Question 6: Will the system be full of sludge water?

Answer 6: No sludge will be present.

Please see additional attachments:

Image 1 Image 2 Image 3

Please note that the bid opening date and time remains Thursday, December 19, 2024 @ 10:00 AM.

All other terms and conditions remain unchanged.

Sincerely, Mary Bowers Purchasing Manager END OF ADDENDUM 1