Addendum 1.pdf
PDF 120 KB Posted
- Attached to
- Replace Wooden Streetlight Poles
- Solicitation number
- 23-003
- Issued by
- Marin County, Oakland City, California
About this file
The document is Addendum "1" issued by the City of Novato, California for the Replace Wooden Streetlight Poles project (CIP Projects 23-003), dated December 26, 2024. The addendum modifies the original bidding documents and provides updates to the project specifications, with bids due on January 6, 2025. Contractors are required to acknowledge receipt of this addendum in their bid proposal, and the modifications will become part of the contract upon selection.
The addendum includes four key updates: adding a Notice to Contractors document with an updated date, revising the location map, updating the Electrical Utility Poles specification section, and adding cut sheets from Holophane for streetlight poles and fixtures along with foundation details to the appendix. The project involves removing and replacing existing wooden street light poles and fixtures, with an engineer's estimated project cost of $500,000. All bidders must communicate these modifications to their subcontractors and understand that the summary may not capture the full extent of the changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Schedule .pdf | ||
| Addendum 2.pdf | ||
| Questions and Answers.pdf | ||
| Specifications CIP 23-003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mayor Tim O’Connor | Mayor Pro Tem Rachel Farac | Councilmembers Pat Eklund ▪ Kevin Jacobs ▪ Mark Milberg City Manager Amy Cunningham
922 MACHIN AVENUE, NOVATO, CA 94945 | PHONE: 415.899.8900 | NOVATO.ORG
December 26, 2024
Addendum “1”
Project Name: Replace Wooden Streetlight Poles
Bids Due: January 6, 2025
Instructions: All bidders must acknowledge receipt of this addendum in their bid proposal.
This addendum modifies the Bidding Documents for CIP Projects 23-003 as noted below. Information and requirements contained herein supersede prior information and requirements contained elsewhere in the Bidding Documents.
The Contractor is responsible to communicate to the bidding subcontractors the modifications or clarifications to the Bidding Documents indicated in this Addendum. The summary description, if provided, may not include the full extent of such modifications or clarifications. The modifications in this Addendum will become part of the Contract when the Bidder is selected as the Contractor for the Project and the Agreement is executed.
This Addendum consists of one (1) page.
Addendum Items:
1. Project Specifications Section 00 11 13:
Item 00 11 13 Notice to Contractors shall be added to the Project Specifications. The day has been updated to Tuesday, Monday, January 6 (2 pages).
2. Project Specifications:
Location Map has been updated/revised and shall be replaced (1 page).
3. Project Specifications Section 33 71 16:
Item 33 71 16 Electrical Utility Poles has been updated/revised and shall be replaced (5 pages).
4. Project Specifications:
Cut sheets from Holophane for streetlight pole and fixture shall be added to Appendix.
Foundation details for the pole shall be added to Appendix (12 pages).