This document is an Addendum Proposal for the Highway 81 Storage Drainage project (Project No. F-2412C) issued by the City of Enid in Garfield County, Oklahoma. The proposal outlines a drainage infrastructure improvement project involving the installation of various HDPE pipes ranging from 24" to 42" in diameter, including pipe installations, manhole construction, inlet and junction box installations, and associated site work. The project requires the contractor to complete all work within the calendar days submitted in the bid, with specific requirements for utility coordination, erosion control, and site restoration.
The proposal includes a detailed bid schedule with 22 line items covering mobilization, bonds, insurance, pipe installations, manhole and inlet box construction, traffic control, erosion control, and site restoration activities. The contractor is required to provide a proposal guaranty of 5% of the total bid and will be responsible for obtaining necessary permits, performing soil testing, protecting existing utilities, and maintaining the work for three years after acceptance. The bid requires a performance and statutory bond of 100% of the contract price, and the contractor must maintain public liability and OCP insurance in accordance with the specified provisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL
Addendum Proposal – Page 1
TO: The Honorable Mayor and Board of Commissioners The City of Enid, Garfield County, Oklahoma
Pursuant to the notice inviting proposals, the undersigned bidder herewith submits his proposal.
He declares he has carefully examined the Plans, Specifications and forms of Contract and bonds as set forth in the proceedings for:
Highway 81 Storage Drainage
F-2412C and that he has reached a full understanding of everything required on said Plans and Specifications, and that he has informed himself as to the kind and quantities of various materials to be furnished and/or the nature and location of the work to be done, and all other matters affecting the work.
The undersigned bidder proposes and agrees that if his proposal is accepted, to enter into contract with THE CITY OF ENID, on forms prescribed, with approved sureties, within seven (7) days, after notice of award to execute the Contract, and to furnish to the City a satisfactory Performance and Statutory Bond in the sum of 100% of the contract price, guaranteeing the faithful performance of the work and payment of bills.
To do any extra work not covered by the following schedule of prices or stipulated lump sum price which may be ordered by the Engineer and to accept as full compensation therefor such prices as may be agreed upon in writing by the Engineer and the Contractor in accordance with Section 108.04 of the General Provisions.
It is further agreed that the Contractor shall begin the work on the date as provided in these Specifications and to prosecute said work in such a manner as to complete all work contracted for within the number of calendar days submitted in the bid.
The Contractor shall take out and maintain public liability and OCP insurance in accordance with Section
106.25 of the General Provisions of the Specifications. A copy of said Specifications is now on file in the Office of the City Clerk of the City of Enid.
Upon completion of the Contract, the Contractor shall furnish to the City a satisfactory Maintenance Bond in the amount of 100% of the final contract price, guaranteeing the maintenance of the work for a period of THREE (3) years after acceptance by the City.
Accompanying this proposal is a proposal guaranty for 5% of the total bid, payable to the CITY OF ENID, OKLAHOMA, which is to be forfeited, as liquidated damages, if, in the event that this proposal is accepted, the undersigned shall fail to execute the contract and furnish satisfactory contract bond under the conditions and within the time specified in this proposal. Otherwise said proposal guaranty is to be returned to the undersigned.
Project Name: Highway 81 Storage Drainage Project No.: F-2412C
Addendum Proposal – Page 2
Base Bid
Line No. Bid Item Description Quantity Unit Unit Price Extended Price
1 Mobilization 1 LS
2 Bonds and Insurance 1 LS
3 Plug With Flowable Fill, Existing 36" CGMP & 42" CGMP Pipes 1 LS
4 24" HDPE Pipe Installation, CIP 188 LF
5 36" HDPE Pipe Installation, CIP 477 LF
6 42" HDPE Pipe Installation, CIP 188 LF
7 ADS N-12- 24" HDPE Pipe & Fittings, Complete in Place 188 LF
8 ADS N-12- 36" HDPE Pipe & Fittings, Complete in Place 477 LF
9 ADS N-12- 42" HDPE Pipe & Fittings, Complete in Place 188 LF
10 Standard 6-ft Diameter Precast Concrete Manhole, Complete in Place 4 EA
11 Additional Precast Concrete Manhole Depth 18 LF
12 3.5' W x 3.5' L x 3' H Inlet & Junction Box, Complete in-Place 1 EA
13 4.5' W x 4.5' L x 4.6' H Inlet & Junction Box, Complete in-Place 1 EA
14 45 degree RC Headwall, Complete in- Place (CIP) 1 LS
15 Tie to Existing 1 EA
16 Traffic Control/Coordination 1 LS
17 Erosion Control 1 LS
18 Seeding 250 SF
19 Clearing & Grubbing 1 EA
20 Pavement Remove and Replace Concrete (Driveways and Parking Lots)* 800 SY
21 Crushed Stone Backfill (Paved Streets & Paved Alleys) 10 TON
22 Retaining Wall Remove & Replace to Existing Condition, CIP 1 EA
Base Bid Total
Contract Time (Calendar Days)
Total Base Bid in Words:
Project Name: Highway 81 Storage Drainage Project No.: F-2412C
Addendum Proposal – Page 3
A Bidder's Bond, Certified or Cashier's Check is enclosed in the amount of $______________, as required.
STATE OF )
) SS:
COUNTY OF )
___________________________________; of lawful age, being first duly sworn, upon his oath, deposes and says, that he executed the accompanying bid on behalf of the bidder named therein for the construction of the above improvement in THE CITY OF ENID, OKLAHOMA, that he had lawful authority so to do and that the bidder has not been a party to any collusion among bidders in restraint of freedom of competition by agreement to bid at a fixed price or to refrain from bidding; or with any State or City official or employee as to quantity, quality, or price in the prospective contract, or any other terms of said prospective contract; or in any discussions between bidders and any State or City officials concerning exchange of money or other thing of value for special consideration in the letting of a contract; said bidder has neither directly nor indirectly entered into any agreement, express or implied, with any bidder or bidders, having for its object the controlling of the price or amount of such bid or bids, the limiting of the bids or bidders, the parceling or farming out to any bidder or bidders, or other persons of any part of the contract or any part of the profits thereof and that he has not and will not divulge the sealed bid on such public improvement to any person whatsoever, except those having a partnership or other financial interest with him in said bid or bids, until after the sealed bid or bids are opened.
If partnership, give name and address of each partner
By:
Address:
Email:________________________________________
Incorporated under the laws of the State of:
Subscribed and sworn to before me this _____ day of _______________________, 20____.
Notary Public
(SEAL)
My Commission Expires:
CONSTRUCTION NOTES:
1. ALL CONSTRUCTION AND MATERIALS, UNLESS OTHERWISE NOTED, SHALL BE IN STRICT
ACCORDANCE WITH THE CITY OF ENID STANDARD CONSTRUCTION SPECIFICATIONS.
2. ALL FLOWLINES THAT ARE TO BE FILLED SHALL BE THOROUGHLY TAMPED BEFORE
CONSTRUCTION OR EXTENSION OF DRAINAGE STRUCTURES. ALL COST TO BE INCLUDED IN
OTHER ITEMS.
3. IN ORDER TO ALLEVIATE DUST CONDITIONS DURING GRADING OPERATIONS AND UNTIL SEEDING
IS ESTABLISHED AS REQUIRED, THE CONTRACTOR SHALL SPRINKLE AS NEEDED. COST OF
SPRINKLING TO BE INCLUDED IN PRICE BID FOR OTHER ITEMS OF WORK.
4. ANY DAMAGE CAUSED BY THE CONTRACTOR TO ANY STRUCTURES, ROADWAY SURFACES,
STRIPING, RAISED PAVEMENT MARKERS, GUARDRAIL, FENCE, SLOPES, AND SIGNS SHALL BE
REPAIRED AT CONTRACTORS EXPENSE TO THE SATISFACTION OF THE ENGINEER AND OWNER.
5. THE CONTRACTOR SHALL MAINTAIN AN AS-BUILT MARK UP SET OF PLANS, WHICH SHALL BE
TURNED IN TO THE ENGINEER AT THE END OF CONSTRUCTION. THIS ITEM INCLUDES ALL CRITICAL
SURVEY INFORMATION SUCH AS FLOWLINES AND ANY MODIFICATIONS TO THE PLANS.
6. THE PURPOSE OF THESE PLANS IS TO SHOW THE INTENT OF CONSTRUCTION. ALL INCIDENTALS
REQUIRED, BUT NOT SHOWN, ARE TO BE INCLUDED IN THE TOTAL BASE BID PRICE.
7. THE CONTRACTOR SHALL SUBMIT A REASONABLE CONSTRUCTION SCHEDULE ADDRESSING ALL
POINTS OF CONSTRUCTION TO THE CITY PRIOR TO BEGINNING ANY WORK.
8. THE CONTRACTOR SHALL GIVE ALL PROPERTY OWNERS AND/OR TENANTS OF PROPERTY
DIRECTLY ADJACENT TO THE PROJECT SITE A MINIMUM OF TEN (10) DAYS NOTICE PRIOR TO THE
START OF WORK.
9. SURPLUS MATERIALS AND DEMOLITION ITEMS, UNLESS SPECIFICALLY NOTED BY THE OWNER, ARE THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF IN A LEGAL MANNER.
LANDFILL FEES WILL NOT BE WAIVED.
10. CLEARING AND GRUBBING: THIS ITEM SHALL INCLUDE CLEARING AND DISPOSAL OF ALL TREES , BUSHES, VEGETATION, AND RELATED ITEMS WITHIN THE PROJECT LIMITS. PROTECT ALL OTHERS
FROM DAMAGE.
11. PLANTING RESTRICTIONS: PLANT DURING ONE OF THE FOLLOWING PERIODS. COORDINATE
PLANTING PERIODS WITH MAINTENANCE PERIODS TO PROVIDE REQUIRED MAINTENANCE FROM
DATE OF SUBSTANTIAL COMPLETION. PROCEED WITH PLANTING ONLY WHEN EXISTING AND
FORECASTED WEATHER CONDITIONS PERMIT.
A) SPRING PLANTING: MARCH 1 - JUNE 15
1. FULL SUN: BERMUDA GRASS (CYNODON DACTYLON)
2. SUN AND PARTIAL SHADE: PROPORTIONED BY WEIGHT AS FOLLOWS:
(a) 50 PERCENT BERMUDA GRASS (CYNODON DACTYLON).
(b) 30 PERCENT CHEWINGS RED FESCUE (FESTUCA RUBRA VARIETY).
(a) 10 PERCENT PERENNIAL RYEGRASS (LOLIUM PERENNE).
(d) 10 PERCENT REDTOP (AGROSTIS ALBA)
B) SEEDING AND SODDING SHALL INCLUDE FERTILIZING AND WATERING PROVISIONS.
12. SOLID SLAB SOD SHALL BE USED AT THE ENGINEER'S DISCRETION IN AREAS OF EXCESSIVE
EROSION OR SILTATION.
13. HORIZONTAL AND VERTICAL CONTROL POINTS PROVIDED ON THE DRAWINGS. THE CONTRACTOR
SHALL HIRE A SURVEYOR LICENSED IN THE STATE OF OKLAHOMA TO ESTABLISH ADDITIONAL
CONTROL POINTS AND TO PROVIDE AND MAINTAIN THE CONSTRUCTION STAKING.
14. ALL EXPOSED CONCRETE EDGES SHALL HAVE A 3/4" CHAMFER AND ALL EXPOSED CONCRETE
SURFACES SHALL HAVE A BROOM FINISH.
15. THE CONTRACTOR MAY MAKE APPLICATION WITH THE CITY OF ENID FOR WATER USE. A METER
WILL BE INSTALLED BY THE CITY OF ENID ON THE NEAREST APPROVED FIRE HYDRANT. THE COST
OF WATER WILL BE $100.00 MINIMUM PER MONTH, OR AT THE CURRENT RATE. THE CONTRACTOR
SHALL PROVIDE A BACKFLOW PREVENTER AND A FREEZE BOX DURING APPROPRIATE WEATHER.
16. EVERY EFFORT HAS BEEN MADE TO LOCATE AND SIZE ALL UNDERGROUND UTILITIES FROM
23. ALL REINFORCING STEEL SHALL HAVE A MINIMUM 2-INCH COVER UNLESS OTHERWISE SHOWN.
24. REINFORCING STEEL SHALL INCLUDE LAP SPLICES, WHICH SHALL BE 24-INCH MINIMUM.
25. CONTACTION JOINT SHALL BE SPACED AT EVERY 20 FEET.
26. STEEL PLACEMENT SHALL BE #4 REBAR AT 12-IN. O.C. BOTH WAYS UNLESS OTHERWISE SHOWN ON
THE PLANS.
27. SAW JOINTS SHALL BE CUT NO MORE THAN EIGHT HOURS AFTER THE POUR. CUTTING MAY NEED
TO BE DELAYED IF ROCK “SPITS” FROM THE CUTTING ACTION. SAW JOINTS SHALL BE 1/4 THE
THICKNESS OF THE CONCRETE.
28. STRUCTURAL AND OTHER STEEL SHALL BE ASTM A615, 60 YEILD GRADE.
29. SOIL TESTING TO BE PROVIDED BY CONTRACTOR TO INCLUDE PROCTOR TESTS AS REQUIRED FOR
VARYING SOILS, COMPACTION TESTING OF EVERY 800 S.Y. FOR SLABS AND EVERY 40' FOR
TRENCHES EACH LIFT.
30. ALL TESTING OF CONSTRUCTION ITEMS SHALL BE PERFORMED BY THE CONTRACTOR AT HIS
EXPENSE.
31. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND PROTECTION OF EXISTING
BURIED UTILITIES. CONTRACTOR SHALL NOTIFY THE CITY IN CASE OF CONTACT WITH A UTILITY.
32. CONTRACTOR WILL BE RESPONSIBLE FOR RETURNING TO THE JOB SITE TO REPAIR ANY SETTLING
OF BACKFILL THAT OCCURS DURING THE MAINTENANCE PERIOD.
33. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO INCLUDE UTILITY COMPANIES (TO
INCLUDE MEETING STORM WATER POLLUTION PREVENTION PLAN REQUIREMENTS), AND OTHER
POSSIBLE APPLICABLE LOCAL, STATE, AND FEDERAL REQUIREMENTS.
34. COMPLETE IN PLACE ( CIP) FOR HDPE PIPE INSTALLATION INCLUDES BUT IS NOT LIMITED TO
TRENCHING, CLASS ' B' BEDDING, COMPACTION, BACK FILL
SHALL PROVIDE A BACKFLOW PREVENTER AND A FREEZE BOX DURING APPROPRIATE WEATHER.
16. EVERY EFFORT HAS BEEN MADE TO LOCATE AND SIZE ALL UNDERGROUND UTILITIES FROM
AVAILABLE CITY DOCUMENTS, ON-SITE SURVEYS, RECORD DRAWINGS AND UTILITY COMPANY
REFERENCE MATERIAL. CONTRACTOR SHALL EXERCISE EXTREME CARE AND CAUTION IN THE
EXECUTION OF HIS WORK AND SHALL ANTICIPATE THAT UTILITIES, PIPELINES AND OTHER
DANGEROUS UNDERGROUND & OVERHEAD OBSTRUCTIONS EXIST AND ARE NOT SHOWN ON THE
PLAN SHEETS. WHEN LINES OR OTHER OBSTRUCTIONS ARE LOCATED DURING CONSTRUCTION, IT
IS THE CONTRACTOR'S RESPONSIBILITY TO PROTECT THE LINES AND IMMEDIATELY NOTIFY THE
OWNER, UTILITY COMPANY AND ENGINEER.
17. UTILITY RELOCATION AND EXTENSION WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH
CITY REQUIREMENTS AND SHALL BE SCHEDULED IN A MANNER RESULTING IN MINIMUM SERVICE
INTERRUPTION. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION OPERATIONS WITH ALL
UTILITY COMPANIES FOR THE RELOCATION OF THEIR LINES PRIOR TO BEGINNING CONSTRUCTION.
18. THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANY, THE OWNER, AND THE ENGINEER IN
WRITING A MINIMUM OF 72 HOURS BEFORE ANY SERVICE INTERRUPTION.
19. STRUCTURES: DETAILED SHOP DRAWING FOR PROPOSED DRAINAGE STRUCTURES, SHALL BE
SUBMITTED FOR APPROVAL PRIOR TO ORDERING MATERIALS
20. THIS PROJECT SHALL BE CONSTRUCTED WITHOUT CLOSING ANY ADJACENT ROADS OR
DRIVEWAYS TO LOCAL TRAFFIC.
21. CONCRETE SHALL BE CLASS A WITH F'C = 3,500 PSI COMPRESSIVE STRENGTH AT 28 DAYS.
22. REINFORCEMENT BAR IS 60,000 PSI YIELD. PLACEMENT SHALL BE PER APPLICABLE ACI CODE.
2 10
AutoCAD SHX Text 401 West Owen K. Garriott Road
AutoCAD SHX Text P.O. Box 1768
AutoCAD SHX Text Enid, Oklahoma 73702
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Cad File:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Designed By:
AutoCAD SHX Text Approved By:
AutoCAD SHX Text Sheet:
AutoCAD SHX Text of
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text Number
AutoCAD SHX Text Date
AutoCAD SHX Text Description
AutoCAD SHX Text The City Of Enid
AutoCAD SHX Text Tele: (580) 234-0400 Fax: (580) 234-8946
AutoCAD SHX Text %%uContacts:
AutoCAD SHX Text Project Number:
AutoCAD SHX Text Project Location:
AutoCAD SHX Text Engr. Seal:
AutoCAD SHX Text Sheet Title:
AutoCAD SHX Text Project Title:
AutoCAD SHX Text
KM
AutoCAD SHX Text
KM
AutoCAD SHX Text
JU
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text Murali katta., Director of Engineering
AutoCAD SHX Text Jason Unruh, P.E., City Engineer
AutoCAD SHX Text Kamalakar maraboyina., Project Engineer
AutoCAD SHX Text F-2412C
AutoCAD SHX Text Moore and Van Buren
AutoCAD SHX Text Moore and Van Buren
AutoCAD SHX Text
ENID, OKLAHOMA
AutoCAD SHX Text Drainage Improvments
AutoCAD SHX Text 1" = 40'
AutoCAD SHX Text
NOV. 2023
GRAVEL & ASPHALT PAVING
AutoCAD SHX Text
GRAVEL & ASPHALT PAVING
AutoCAD SHX Text
GRAVEL & ASPHALT PAVING
AutoCAD SHX Text
GRAVEL PAVING
AutoCAD SHX Text
GRAVEL PAVING
AutoCAD SHX Text
GRAVEL DRIVE
AutoCAD SHX Text
METAL STORAGE BUILDING
AutoCAD SHX Text
ONE STORY STORAGE BUILDING
AutoCAD SHX Text
ONE STORY STORAGE BUILDING
AutoCAD SHX Text
ONE STORY STORAGE BUILDING
AutoCAD SHX Text
LARGE STORAGE BUILDING
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
APPROXIMATE LOCATION OF EXISTING 24" STORM SEWER
AutoCAD SHX Text
PLUG & FILL EXISTING 42" STORM SEWER
AutoCAD SHX Text
PLUG & FILL EXISTING 42" STORM SEWER
AutoCAD SHX Text
CONC. PAVING
AutoCAD SHX Text
1220.08 FL 42'' CGMP
AutoCAD SHX Text 100 yr Floodplain
AutoCAD SHX Text 42"
AutoCAD SHX Text 42"
AutoCAD SHX Text 24"
AutoCAD SHX Text
HDPE 36"
AutoCAD SHX Text 36"
AutoCAD SHX Text 24"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
PLUG & FILL EXISTING 42" STORM SEWER
AutoCAD SHX Text
CONNECT TO EXISTING INLET.
AutoCAD SHX Text
PLUG & FILL EXISTING 42" STORM SEWER
AutoCAD SHX Text
CONNECT TO EXISTING MH..
AutoCAD SHX Text
TIE TO EXISTING MH.. END OF PROJECT
AutoCAD SHX Text
LINE "D"
AutoCAD SHX Text
LINE "B"
AutoCAD SHX Text
LINE "A"
AutoCAD SHX Text
LINE "C"
AutoCAD SHX Text
LINE "A"
AutoCAD SHX Text 36"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text 42"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text 42"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
LINE "A & B"
AutoCAD SHX Text
LINE "B"
AutoCAD SHX Text
LINE "A"
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Cad File:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Designed By:
AutoCAD SHX Text Approved By:
AutoCAD SHX Text Sheet:
AutoCAD SHX Text of
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text Number
AutoCAD SHX Text Date
AutoCAD SHX Text Description
AutoCAD SHX Text Project Number:
AutoCAD SHX Text Project Location:
AutoCAD SHX Text Engr. Seal:
AutoCAD SHX Text Sheet Title:
AutoCAD SHX Text Project Title:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOV. 2023
AutoCAD SHX Text 1" = 40'
AutoCAD SHX Text
LA
AutoCAD SHX Text
RH
AutoCAD SHX Text
JU
AutoCAD SHX Text Hwy 81 Storage Drainge
AutoCAD SHX Text Moore and Van Buren
AutoCAD SHX Text
ENID, OKLAHOMA
AutoCAD SHX Text F-2412C
AutoCAD SHX Text %%uContacts:
AutoCAD SHX Text Tele: (580) 234-0400 Fax: (580) 234-8946
AutoCAD SHX Text The City Of Enid
AutoCAD SHX Text Enid, Oklahoma 73702
AutoCAD SHX Text P.O. Box 1768
AutoCAD SHX Text 401 West Owen K. Garriott Road
AutoCAD SHX Text Christopher Gdanski, Director of Engineering Services
AutoCAD SHX Text Robert Hitt,P.E., City Engineer
AutoCAD SHX Text Lucky Airehrour Project Engineer
PLAN & PROFILE
M O
O
RE
A
VE
AutoCAD SHX Text
ASPH ST W/ CONC. CURB & GUTTERS
AutoCAD SHX Text
ASPH PARKING LOT
AutoCAD SHX Text
CONC. PARKING LOT
AutoCAD SHX Text
GRAVEL & ASPHALT PAVING
AutoCAD SHX Text
ASPH PARKING LOT
AutoCAD SHX Text
ASPH PARKING LOT
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ONE STORY BRICK BUILDING
AutoCAD SHX Text
ONE STORY FRAME BUILDING
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ONE STORY STORAGE BUILDING
AutoCAD SHX Text
ONE STORY STORAGE BUILDING
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONC. PAVING
AutoCAD SHX Text
HDPE 36"
AutoCAD SHX Text 24"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text 36"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
CONNECT TO EXISTING MH..
AutoCAD SHX Text
TIE TO EXISTING MH.. END OF PROJECT
AutoCAD SHX Text
PLUG & FILL EXISTING PIPE..
AutoCAD SHX Text
KEEP EXISTING 36" HDPE
AutoCAD SHX Text
PREVIUSLY PLUGGED STORM SEWER LINE
AutoCAD SHX Text
LINE "C"
AutoCAD SHX Text
LINE "A"
AutoCAD SHX Text
PROJECT END
AutoCAD SHX Text
KEEP EXISTING 36" HDPE
AutoCAD SHX Text 36"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text 36"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text 36"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
LINE "A"
AutoCAD SHX Text
KEEP EXISTING
AutoCAD SHX Text
LINE "A"
AutoCAD SHX Text
TIE TO EXISTING MH. END OF PROJECT
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Cad File:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Designed By:
AutoCAD SHX Text Approved By:
AutoCAD SHX Text Sheet:
AutoCAD SHX Text of
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text Number
AutoCAD SHX Text Date
AutoCAD SHX Text Description
AutoCAD SHX Text Project Number:
AutoCAD SHX Text Project Location:
AutoCAD SHX Text Engr. Seal:
AutoCAD SHX Text Sheet Title:
AutoCAD SHX Text Project Title:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 40'
AutoCAD SHX Text M-1403A
AutoCAD SHX Text
LA
AutoCAD SHX Text
RH
AutoCAD SHX Text
JU
AutoCAD SHX Text Moore and Van Buren
AutoCAD SHX Text
ENID, OKLAHOMA
AutoCAD SHX Text F-2412 C
AutoCAD SHX Text Drainage Improvments
AutoCAD SHX Text %%uContacts:
AutoCAD SHX Text Tele: (580) 234-0400 Fax: (580) 234-8946
AutoCAD SHX Text The City Of Enid
AutoCAD SHX Text Enid, Oklahoma 73702
AutoCAD SHX Text P.O. Box 1768
AutoCAD SHX Text 401 West Owen K. Garriott Road
AutoCAD SHX Text Christopher Gdanski, Director of Engineering Services
AutoCAD SHX Text Robert Hitt,P.E., City Engineer
AutoCAD SHX Text Lucky Airehrour Project Engineer
AutoCAD SHX Text
NOV. 2023
AutoCAD SHX Text
PLAN & PROFILE SHEET -2
Hwy 81 Storage Drainge
GRAVEL & ASPHALT PAVING
AutoCAD SHX Text
GRAVEL PAVING
AutoCAD SHX Text
GRAVEL PAVING
AutoCAD SHX Text
METAL STORAGE BUILDING
AutoCAD SHX Text
ONE STORY STORAGE BUILDING
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
PLUG & FILL EXISTING 42" STORM SEWER
AutoCAD SHX Text
PLUG & FILL EXISTING 42" STORM SEWER
AutoCAD SHX Text 100 yr Floodplain
AutoCAD SHX Text 42"
AutoCAD SHX Text 42"
AutoCAD SHX Text 24"
AutoCAD SHX Text 36"
AutoCAD SHX Text
PLUG & FILL EXISTING 42" STORM SEWER
AutoCAD SHX Text
CONNECT TO EXISTING INLET.
AutoCAD SHX Text
LINE "D"
AutoCAD SHX Text
LINE "B"
AutoCAD SHX Text 24"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
LINE "D"
AutoCAD SHX Text
GRAVEL & ASPHALT PAVING
AutoCAD SHX Text
ONE STORY STORAGE BUILDING
AutoCAD SHX Text
ONE STORY STORAGE BUILDING
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
APPROXIMATE LOCATION OF EXISTING 24" STORM SEWER
AutoCAD SHX Text
CONC. PAVING
AutoCAD SHX Text
HDPE 36"
AutoCAD SHX Text 24"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
PLUG & FILL EXISTING 42" STORM SEWER
AutoCAD SHX Text
CONNECT TO EXISTING MH..
AutoCAD SHX Text
TIE TO EXISTING MH.. END OF PROJECT
AutoCAD SHX Text
PLUG & FILL EXISTING PIPE..
AutoCAD SHX Text
LINE "A"
AutoCAD SHX Text
LINE "C"
AutoCAD SHX Text
LINE "A"
AutoCAD SHX Text 24"
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
LINE "C"
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Cad File:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Designed By:
AutoCAD SHX Text Approved By:
AutoCAD SHX Text Sheet:
AutoCAD SHX Text of
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text Number
AutoCAD SHX Text Date
AutoCAD SHX Text Description
AutoCAD SHX Text Project Number:
AutoCAD SHX Text Project Location:
AutoCAD SHX Text Engr. Seal:
AutoCAD SHX Text Sheet Title:
AutoCAD SHX Text Project Title:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 40'
AutoCAD SHX Text M-1403A
AutoCAD SHX Text
LA
AutoCAD SHX Text
RH
AutoCAD SHX Text
RH
AutoCAD SHX Text
PLAN & PROFILE
AutoCAD SHX Text Moore and Van Buren
AutoCAD SHX Text
ENID, OKLAHOMA
AutoCAD SHX Text F-1403A
AutoCAD SHX Text Drainage Improvments
AutoCAD SHX Text %%uContacts:
AutoCAD SHX Text Tele: (580) 234-0400 Fax: (580) 234-8946
AutoCAD SHX Text The City Of Enid
AutoCAD SHX Text Enid, Oklahoma 73702
AutoCAD SHX Text P.O. Box 1768
AutoCAD SHX Text 401 West Owen K. Garriott Road
AutoCAD SHX Text Christopher Gdanski, Director of Engineering Services
AutoCAD SHX Text Robert Hitt,P.E., City Engineer
AutoCAD SHX Text Lucky Airehrour Project Engineer
AutoCAD SHX Text
NOV. 2023
Hwy 81 Storage Drainge
| 2-F-2412- GENERAL NOTES.pdf |
| Sheets and Views |
| F-2412C-GENERAL NOTES) |
| Plans(North & South)-P&P-Sheet - 3.pdf |
| Sheets and Views |
| P&P-Sheet - 3 |
| Plans(North & South)-P&P -Sheet - 4.pdf |
| Sheets and Views |
| P&P -Sheet - 4 |
| Plans(North & South)-P&P - Sheet-5.pdf |
| Sheets and Views |
| P&P - Sheet-5 |
File details come from the government source that posted it. Updated .