Addendum_1.pdf

PDF 174 KB Posted

Attached to
File No. 751/17108. RAA-Gladstone-Proposed Cold Storage Bldg.
Solicitation number
RFQ-171-180000000503-2
Issued by
Delta County, Fruitport Village, Michigan

About this file

This is Addendum No. 1 issued by U.P. Engineers & Architects, Inc. for the Michigan Department of Natural Resources Escanaba Parks & Recreation Division's Cold Storage Building & Building Addition project in Gladstone, Michigan, dated April 20, 2018. The addendum modifies the original plans and specifications for construction work on two buildings, with a mandatory sign-in requirement and coordination needed with Law Enforcement Staff for building addition access. Work schedule parameters allow up to 10-hour workdays starting no earlier than 7 am unless approved by DNR Park & Rec staff, and both buildings can be worked on simultaneously.

The addendum stipulates a $3,000 electrical power company allowance must be included in the contractor's lump sum price for utility company line extension. It also specifies that the electrical service meter location should be positioned to the left side of the proposed garage door. The attached meeting attendance record from April 9, 2018, shows various contractors and representatives from companies including DTMB, construction firms, electrical contractors, and concrete companies who attended the mandatory meeting.

View the file

Other files

File Type Posted
BidSum.pdf PDF
Plans.pdf PDF
Advertisement.pdf PDF
Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100 Portage Street Houghton, MI 49931

906-482-4810 • 800-562-7684 • Fax: 906-482-9799

Offices also in:

Iron Mountain

Ishpeming Marinette

Sault Ste Marie

U.P. Engineers & Architects, Inc. www.UPEA.com

ADDENDUM NO. 1

File No.751/17108.RAA Index No. 52010

Michigan Department of Natural Resouces Escanaba Parks & Rec Division

Cold Storage Building & Building Addition Gladstone, Michigan

This ADDENDUM NO. 1, issued on April 20, 2018 is to clarify, modify and/or change the original plans and specifications issued by U.P. Engineers & Architects, Inc. and is hereby made a part of the bidding documents.

Bidders are required to acknowledge receipt of this ADDENDUM NO. 1 on the appropriate place on the Bid Form.

A. General

1. The Mandatory sign in sheet is attached.

2. Both buildings can be worked on at the same time.

3. Building addition work will require one week notice for access from Law

Enforcement Staff.

4. Work schedule can be up to ten (10) hours, but not starting prior to 7 am or approved through DNR Park & Rec staff.

5. Provide an electrical power company allowance of $3,000 in your lump sum price for utility company line extension.

6. Electrical service meter location shall be to the left side of the proposed garage door.

END OF ADDENDUM NO. 1