Addendum #1.pdf
PDF 5 MB Posted
- Attached to
- HS Parking Lot Resurface
- Solicitation number
- RFP-BRSP-250000001391-3
- Issued by
- Berrien County, Michigan
About this file
This is Addendum No. 1 for a high school parking lot resurfacing project at Berrien Springs Public Schools in Michigan, dated February 20, 2025. The project involves resurfacing the high school parking lot, including sub-surface material preparation, asphalt paving, storm structures and piping, ADA tactile warning transitions, concrete walk repair, striping, and parking lot signage. Bids are due February 28, 2025 at 3:00 PM at the Admin Building Conference Room, with bid award scheduled for March 13, 2025 BOE meeting. A mandatory pre-bid meeting was held on February 18, 2025. Questions are due by February 21, 2025 at 12:00 noon. All work must be substantially complete by August 18, 2025.
The addendum includes several key requirements: contractors must use a revised bid form, product/material testing falls within the General Contractor's scope, and special care must be taken when excavating near a fiber run under the parking lot (hand digging required below 28" depth). An alternate bid item involves replacing 146 LF of existing 24" RCP storm pipe with HDPE pipe. The project requires a 5% bid bond and is not tax exempt. Six contractors attended the mandatory pre-bid meeting, representing companies including Arnt Asphalt, Rieth-Riley, Hollerbach Excavating, CPM Construction, and Pearson Construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum #2.pdf | ||
| Invitation to Bid Form.pdf | ||
| Drawings.pdf | ||
| Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1
High School Parking Lot Resurface Berrien Springs Public Schools
20 February 2025
This addendum forms a part of the Contract Documents and modifies the original Bidding Documents (PROJECT MANUAL dated 13 February 2025). Please acknowledge receipt of this Addendum when submitting your bid. This Addendum has been distributed to the plan holders of record only. It is the bidder’s responsibility to distribute Addendum information to subcontractors and material suppliers. This Addendum reflects modifications from the Owner, Architect, and Bidders.
ATTACHMENTS
• Pre-Bid Meeting Agenda
• Pre-Bid Sign-In Sheet
• Revised Bid Form
• REVISED DRAWINGS
GENERAL / CLARIFICATION
1. Please find the sign-in sheet attached from the Mandatory pre-bid meeting on Monday 2-18-2025.
2. Bidders are required to submit the revised Bid Form – see attached.
3. Please understand that product/ material testing is within the scope of the General Contractor
4. Please note that the depth of the fiber run under the parking lot is still a best-known depth, and the contractor must hand dig in this area for any disturbed materials below 28” to assure the fiber run is not disturbed or severed.
SPECIFICATIONS
• None
DRAWING SHEETS
1. Sheet C1.0, C2.0, C3.0
END OF ADDENDUM NO. 1
210 E. Main Street, Suite 200 PO Box 487, Niles, MI 49120
MA
Pre-Bid Meeting Agenda
Pre-Bid Meeting: High School Parking Lot Resurface
2.18.25 @ 3:00 PM at the High School Parking Lot
1. Introductions
• BSPS- Nick Schmidt, Project Manager
• Ron Bartz, Director of Facilities
2. Bidding Schedule
▪ Question Deadline 2/21/25 @ 12:00 Noon
▪ Addendum Release 2/21/25, end of day
▪ Bids Due: 2/28/25 @ 3:00 PM Admin Bldg; Conf Room
▪ Bid Award 3/13/25 BOE meeting
3. Construction Schedule
▪ Product procurement to begin upon notice to proceed
▪ All work to be substantially complete by: Aug 18, 2025
4. Summary of Work: High School Parking Lot Resurfacing
▪ Project will be constructed under a single contract:
▪ Scope: includes, sub-surface material preparation, asphalt paving, storm structures, and storm piping, ADA tactile warning transitions, and concrete walk repair, striping, and parking lot signage.
▪ Alternate One, as identified on drawings, replace additional storm line.
5. Instructions to Bidders
▪ Single contract
▪ Comparable experience and ability to adhere to schedule
▪ Project is NOT tax exempt
▪ Bid Bond
▪ Payment / Performance Bonds
▪ AIA contract and related documents
6. Owner Requirements
7. Document Distribution [Electronic]
High School Parking Lot Resurface
PRE-BID MEETING SIGN-IN SHEET
18 February 2025 @ 3:00- 3:45 PM
NAME COMPANY PHONE EMAIL
Nick Schmidt BSPS 269 921-9472 nschmidt@homeoftheshamrocks.org
Brian Huston Arnt Asphalt 269 208-4915 bkhuston@arntasphaltco.com
Adam Rochefort Rieth-Riley 269 266-2614 arochefort@rieth-riley.com
Mike Hollerbach Hollerbach excavating 269 465-6778 hollerbachexc@gmail.com
Chris Miller CPM Const. INC. 269 208-0117 cmiller@cpmconstruct.com
Rob Swem Pearson Construction 269 926-7281 rswem@pearsonconstruction.com
Bid Form - 1
BID FORM
PROJECT: High School Parking Lot
Resurface OWNER: Berrien Springs Public Schools
285 Sylvester Avenue Berrien Springs, MI 49103
PROPOSAL FROM: __________________________________________________________________ Company Name
Address
City, State, ZIP
CONTRACT NO. 1 – High School Parking Lot Resurface
Base Bid
___________________________________________________ $______________________ Base Bid Written Amount
Alternate No 1: Remove 146 LF of existing 24” RCP storm pipe and concrete sidewalk as needed to replace with 146 LF of 24” HDPE storm pipe and concrete sidewalk as noted on plan (refer to drawing C2.0)
$_______________________ for Alternate 1
Unit cost: Provide a unit cost for 350 cubic yards of MDOT 22A :
$_______________________ Unit Cost
Voluntary Alternate (if provided)
Description
_________________________________________________ $______________________ (Add/Deduct) Written Amount
Bid Form - 2
Additional items to be included with Bid Form:
5% BID BOND YES NO
List of warranted projects YES NO
List of subcontractors YES NO
Iran Economic Sanctions Act Certification YES NO
Familial Disclosure Statement YES NO
Written Narrative for Inclusions / Exclusions YES NO
Summary Schedule YES NO
Acknowledge Receipt of
ADDENDUM NO.: ONE TWO
SUBMITTED BY:
_____________________________________________________ Date:________________, 2025 Signature
Printed
Title
Phone Number
MIDDLE SCHOOL RD
SY
LV
ES
TE
R
AV
E
DATE
THE INFORMATION ON THIS SHEET IS
THE PROPERTY OF CARMI design group inc. AND MAY NOT BE REPRODUCED
WITHOUT WRITTEN CONSENT FROM
CARMI design group inc.
Copyright 2025 ©
PROJECT #
DRAWN BY
ISSUEDNO. DATE
CHECKED BY
NEF DGL
02-12-2025
BSPS HIGH
SCHOOL
BERRIEN SPRINGS, MI
2024.053
Byron Center, MI
(616) 277-2185
Kalamazoo, MI
(269) 697-7120 www.VKcivil.com
JTR CMF
BSPS HS
PARKING LOT
FOR BIDDING 02.12.251
JOB NO. 1435
ADDENDUM 1 02.21.252
BERRIEN SPRINGS PUBLIC SCHOOLS
BERRIEN COUNTY, MICHIGAN
HIGH SCHOOL PARKING LOT
SHEET NO. DESCRIPTION
P L A N I N D E X
TITLE
SHEET
C0.0
PROJECT LOCATION
LOCATION MAP
VILLAGE OF BERRIEN SPRINGS, BERRIEN COUNTY MICHIGAN
LV
ES
TE
R
AV
E
DATE
THE INFORMATION ON THIS SHEET IS
THE PROPERTY OF CARMI design group inc. AND MAY NOT BE REPRODUCED
WITHOUT WRITTEN CONSENT FROM
CARMI design group inc.
Copyright 2025 ©
PROJECT #
DRAWN BY
ISSUEDNO. DATE
CHECKED BY
NEF DGL
02-12-2025
BSPS HIGH
SCHOOL
BERRIEN SPRINGS, MI
2024.053
Byron Center, MI
(616) 277-2185
Kalamazoo, MI
(269) 697-7120 www.VKcivil.com
JTR CMF
BSPS HS
PARKING LOT
FOR BIDDING 02.12.251
JOB NO. 1435
ADDENDUM 1 02.21.252
EXISTING
CONDITIONS &
DEMOLITION
PLAN
C1.0
0' 15' 30' 45' 60'
SCALE: 1" = 30'
Know what's below.
before you dig.Call
LV
ES
TE
R
AV
E
DATE
THE INFORMATION ON THIS SHEET IS
THE PROPERTY OF CARMI design group inc. AND MAY NOT BE REPRODUCED
WITHOUT WRITTEN CONSENT FROM
CARMI design group inc.
Copyright 2025 ©
PROJECT #
DRAWN BY
ISSUEDNO. DATE
CHECKED BY
NEF DGL
02-12-2025
BSPS HIGH
SCHOOL
BERRIEN SPRINGS, MI
2024.053
Byron Center, MI
(616) 277-2185
Kalamazoo, MI
(269) 697-7120 www.VKcivil.com
JTR CMF
BSPS HS
PARKING LOT
FOR BIDDING 02.12.251
JOB NO. 1435
ADDENDUM 1 02.21.252
SITE &
UTILITIES
PLAN
C2.0
0' 15' 30' 45' 60'
SCALE: 1" = 30'
Know what's below.
before you dig.Call
LV
ES
TE
R
AV
E
DATE
THE INFORMATION ON THIS SHEET IS
THE PROPERTY OF CARMI design group inc. AND MAY NOT BE REPRODUCED
WITHOUT WRITTEN CONSENT FROM
CARMI design group inc.
Copyright 2025 ©
PROJECT #
DRAWN BY
ISSUEDNO. DATE
CHECKED BY
NEF DGL
02-12-2025
BSPS HIGH
SCHOOL
BERRIEN SPRINGS, MI
2024.053
Byron Center, MI
(616) 277-2185
Kalamazoo, MI
(269) 697-7120 www.VKcivil.com
JTR CMF
BSPS HS
PARKING LOT
FOR BIDDING 02.12.251
JOB NO. 1435
ADDENDUM 1 02.21.252
GRADING
PLAN
C3.0
0' 15' 30' 45' 60'
SCALE: 1" = 30'
Know what's below.
before you dig.Call
DATE
THE INFORMATION ON THIS SHEET IS
THE PROPERTY OF CARMI design group inc. AND MAY NOT BE REPRODUCED
WITHOUT WRITTEN CONSENT FROM
CARMI design group inc.
Copyright 2025 ©
PROJECT #
DRAWN BY
ISSUEDNO. DATE
CHECKED BY
NEF DGL
02-12-2025
BSPS HIGH
SCHOOL
BERRIEN SPRINGS, MI
2024.053
Byron Center, MI
(616) 277-2185
Kalamazoo, MI
(269) 697-7120 www.VKcivil.com
JTR CMF
BSPS HS
PARKING LOT
FOR BIDDING 02.12.251
JOB NO. 1435
ADDENDUM 1 02.21.252
PROJECT
DETAILS
C4.0
CONCRETE CURB & GUTTER
MDOT DETAIL F4
9"
3 4 "
1'
2"
6"
2'
5"
1 34"
4" 4"
5 12"
2"R 2"R
2" MDOT 13A TOP COURSE
OVER BOND COAT 2" MDOT 36A BASE COURSE
8" AGGREGATE BASE (MDOT
22A)
12" SAND SUBBASE
(MDOT CL II SAND)
PARKING LOT PAVING DETAIL
STREET
PROFILE
GRADE
B
SETBACK LENGTH
B ELE. 5
SIDEWALK EXPANSION JOINT
SIDEWALK EXPANSION JOINT
RETURN CURB
AS REQUIRED RAMP
A
RAMP LE
NGTH
CROSSWALK MARKINGS
U2
PEDESTRIAN
STREET
CROSSING
SIDEWALK EXPANSION JOINT
PAVEMENT
SETBACK LENGTH RAMP LENGTH SIDEWALK
2'-0"
MIN.
RAMP WIDTH
PAVEMENT
BUFFER
RAMP
WIDTH
A
SIDEWALK RAMP AT DRIVEWAYS DETAIL
NOT TO SCALE
6" MIN. SAND SUBBASE
(MDOT CI II SAND)
2%
6" THICK MIN. CONCRETE
NOTES:
1. 1/4" WIDE TOOLED CONTRACTION JOINTS TO 1"
DEPTH AT 5 FOOT INTERVALS.
2. WHERE SIDEWALK IS PLACED ADJACENT TO CURB
AND GUTTER, CONTRACTION JOINTS SHALL LINE
UP WITH CURB AND GUTTER JOINTS.
3. ISOLATION JOINTS WHERE PAVEMENT ABUTS
PROPOSED STRUCTURES OR OTHER PAVEMENTS.
4. EXPANSION JOINTS SHALL BE PLACED NO
FURTHER THAN 40' APART.
5. RUNNING SLOPE OF SIDEWALK TO BE LESS THAN
5% (EXCLUDING RAMPS AND LANDINGS)
CONCRETE SIDEWALK DETAIL
2'
SU
M P
4'
OR AS LABELED
ON PLANS
2'
6"
6" MIN. 12" MAX.
CONCRETE
ADJUSTING RINGS
OUTLET PIPE AS
SHOWN ON PLANS
PRECAST CONCRETE
SECTION
PRECAST CONCRETE
REINFORCED BASE
PLACE RUBBER BOOT
SEAL WITH GROUT
PLACE MANHOLE
STEPS CONFORMING
TO ASTM C-478 AT 16"
ON CENTER
CASTING TYPE AS INDICATED
ON GRADING PLAN
CATCH BASIN DETAIL
EXPANSION
RESTRAINT
1" REBAR FOR
SACK REMOVAL
BASIN GRATE
SILT SACK DETAIL
(10' O/C)
WOODEN STAKE
EX GROUND
24" HIGH SILT
FLOW
FENCE
INTO SOIL
FENCE FLAP
TOE SILT BURY MIN. 6"
SILT FENCE DETAIL
CONCRETE CURB & GUTTER
MDOT DETAIL F4 SPILL OUT
8"1 3 4 "
1'
4"
6"
2'
5"
1 34"
4" 4"
5 12"
2"R 2"R
File details come from the government source that posted it. Updated .