Addendum 1.pdf
PDF 176 KB Posted
- Attached to
- Airfield Lighting Rehabilitation
- Solicitation number
- PE-66389-NONST-2025-000000007
- Issued by
- Peach County, Georgia
About this file
This is Addendum #1 issued by Goodwyn Mills Cawood for the Airfield Lighting Rehabilitation project at Hawkinsville-Pulaski County Airport in Georgia (GMC Project No: TATL230007). The addendum announces a pre-bid meeting scheduled for Wednesday, February 5, 2025 at 10:00 a.m. EST via Microsoft Teams, with attendance being non-mandatory but encouraged. The meeting can be accessed through a provided Teams link with Meeting ID 257 406 556 022 and Passcode H6jx98og, or by phone at 1-334-245-5364 with conference ID 549 656 267#.
The addendum requires bidders to acknowledge receipt in writing on both the provided Transmittal Cover Sheet and the Proposal Form. Any revisions or additions called for in the Drawings or Project Manual must be coordinated across all applicable documents, including Civil, Landscaping, Architectural, Structural, Electrical, and other related documentation. The addendum contains no specific pricing terms, funding requirements, or other substantive changes to the original bid documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 51A_Lighting REQUESTS FOR BIDS 01_14_2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G o o d w y n M i l l s C a w o o d
1 9 0 6 E T h r e e N o t c h S t r e e t
A n d a l u s i a , A l a b a m a 3 6 4 2 1
T 3 3 4 . 2 2 2 . 2 6 9 9
T R A N S M I T T A L C O V E R S H E E T
DATE: FEBRUARY 3, 2025
TO: ALL PLAN HOLDERS
FROM: PATSY STINSON
PROJECT: AIRFIELD LIGHTING REHABILITATION
HAWKINSVILLE-PULASKI COUNTY AIRPORT
HAWKINSVILLE, GEORGIA
GMC PROJECT NO: TATL230007
RE: ADDENDUM #1
PLEASE COMPLETE BELOW AND RETURN IMMEDIATELY VIA FAX or EMAIL to:
PATSY STINSON
Email: patsy.stinson@gmcnetwork.com
I, the undersigned, hereby acknowledge receipt of this Addendum #1.
Authorized Representative Date
Company Name mailto:patsy.stinson@gmcnetwork.com
ADDENDUM NO. 1 – PAGE 1 of 1
ADDENDUM NUMBER 1
AIRFIELD LIGHTING REHABILITATION
HAWKINSVILLE-PULASKI COUNTY AIRPORT
GMC PROJECT NO: TATL230007
I. General
A. The following clarifications, revisions, additions are hereby made a part of same, and shall be incorporated in the Project Manual, Drawings, and Work of the Contract the same as if originally included in the Bid and Construction Documents.
B. Bidders shall acknowledge receipt of this Addendum in writing, as provided on the Transmittal Cover Sheet and the Proposal Form.
C. When a revision and/or addition is called for to the Drawings or Project Manual, they shall be fully coordinated with and carried through all applicable Drawings and portions of the Project Manual, including in part, all related Civil, Landscaping, Architectural, Structural, Electrical, and other Documents.
II. Pre-Bid Meeting
A. If you would like to attend the pre-bid meeting via Teams, please join the meeting at the scheduled time, Wednesday, February 5, 2025 at 10:00 a.m. EST. Attendance is non-mandatory, but encouraged.
Join the meeting now
Meeting ID: 257 406 556 022 Passcode: H6jx98og
Dial in by phone
1-334-245-5364, 549656267# United States, Montgomery Phone conference ID: 549 656 267#
III. Conclusion
A. This is the end of Addendum Number 1 https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2FiMWU3M2EtYmU3Ni00ZTU0LTk3MmUtNDU4ZjZjMzYxYThj%40thread.v2/0?context=%7b%22Tid%22%3a%227a7d72d5-2bb1-4907-a3ed-8f493dc327ae%22%2c%22Oid%22%3a%22c2d0b733-0e65-4df2-bd55-43de19d8d325%22%7d
| I. General |
| A. The following clarifications, revisions, additions are hereby made a part of same, and shall be incorporated in the Project Manual, Drawings, and Work of the Contract the same as if originally included in the Bid and Construction Documents. |
| B. Bidders shall acknowledge receipt of this Addendum in writing, as provided on the Transmittal Cover Sheet and the Proposal Form. |
| C. When a revision and/or addition is called for to the Drawings or Project Manual, they shall be fully coordinated with and carried through all applicable Drawings and portions of the Project Manual, including in part, all related Civil, Landscaping,... |
| II. Pre-Bid Meeting |
| III. Conclusion |
| A. This is the end of Addendum Number 1 |
| Acknowledgement.pdf |
| Goodwyn Mills Cawood |
| 1906 E Three Notch Street |
| Andalusia, Alabama 36421 |
| DATE: FEBRUARY 3, 2025 |
| Addendum 1.pdf |
| I. General |
| A. The following clarifications, revisions, additions are hereby made a part of same, and shall be incorporated in the Project Manual, Drawings, and Work of the Contract the same as if originally included in the Bid and Construction Documents. |
| B. Bidders shall acknowledge receipt of this Addendum in writing, as provided on the Transmittal Cover Sheet and the Proposal Form. |
| C. When a revision and/or addition is called for to the Drawings or Project Manual, they shall be fully coordinated with and carried through all applicable Drawings and portions of the Project Manual, including in part, all related Civil, Landscaping,... |
| II. Pre-Bid Meeting |
| III. Conclusion |
| A. This is the end of Addendum Number 1 |
File details come from the government source that posted it. Updated .