About this file
This document is an Addendum to an Invitation to Bid (ITB) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration for an HVAC Piping Replacement project at Western State Hospital in Hopkinsville, Kentucky. The Addendum extends the bid due date to December 6, 2022, and includes several revisions to the contract documents. Key changes include revised COVID-19 vaccination requirements for the contractor's unvaccinated employees, the addition of a new specification section on Mechanical Insulation, and clarification that wage rates do not apply to this project.
The Addendum also includes attachments for a Vaccine Exemption Form and the new Mechanical Insulation specification section. The project appears to be isolated from staff and patients, with unvaccinated contractor employees required to sign an exemption form, undergo daily temperature checks and weekly COVID testing provided by the hospital. This HVAC piping replacement project does not have any wage rate requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2.pdf | ||
| Final_RFB_785_2300000274_2_SO_FORM.PDF | ||
| Final_RFB_785_2300000274_3_SO_FORM.PDF | ||
| Final_RFB_785_2300000274_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-149-23
FOR: HVAC Piping Replacement Western State Hospital Hopkinsville, Kentucky
DATE: November 16, 2022
RFB-785-2300000274
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Bid Due Date has been extended to December 6, 2022, at 2:00 p.m., Eastern Time.
Item 2: The following Addendum Items shall be made part of the Contract Documents for the referenced project.
1.01 Reference Section “Advertisement for Bids” 10.K. Revise requirements for Contractor to have Covid-19 Vaccine. This project shall be isolated from staff and patients of the facility. The Contractor shall have individual unvaccinated employees sign an exemption form (refer to attached), submit to daily temperature checks and questionnaire, and once weekly Covid testing. Testing frequency is subject to change. Testing will be provided by Western State Hospital.
1.02 Refer to Specification Index. Add the attached Section 230700 “Mechanical Insulation” to the Specifications.
1.03 Refer to Section “Notice to Contractors”. Wage rates do NOT apply to this project.
Attachments:
1. Vaccine Exemption Form
2. Section 230700 Mechanical Insulation
END OF ADDENDUM
Invitation to Bid No. RFB-149-23 For: HVCA Piping Replacement Western State Hospital Hopkinsville, Kentucky
Kyla Satterly, Statewide Procurement Analyst II Division of Engineering and Contract Administration
HVAC PIPING REPLACEMENT
WESTERN STATE HOSPITAL
HOPKINSVILLE, KENTUCKY
MARCUM NO. 22614
ADDENDUM 1.00
NOVEMBER 16, 2022
The following Addendum Items shall be made part of the Contract Documents for the referenced project.
1.01 Reference Section “Advertisement for Bids” 10.K. Revise requirements for Contractor to have Covid-19 Vaccine. This project shall be isolated from staff and patients of the facility. The Contractor shall have individual unvaccinated employees sign an exemption form (refer to attached), submit to daily temperature checks and questionnaire, and once weekly Covid testing. Testing frequency is subject to change. Testing will be provided by Western State Hospital.
1.02 Refer to Specification Index. Add the attached Section 230700 “Mechanical Insulation” to the Specifications.
1.03 Refer to Section “Notice to Contractors”. Wage rates do NOT apply to this project.
Attachments:
1. Vaccine Exemption Form
2. Section 230700 Mechanical Insulation
END OF ADDENDUM 1.00
MECHANICAL INSULATION 230700 - 1
SECTION 230700 - MECHANICAL INSULATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Insulation Materials:
a. Flexible elastomeric.
b. Mineral fiber.
2. Adhesives.
3. Sealants.
4. Factory-applied jackets.
5. Tapes.
6. Securements.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings:
1. Detail application of protective shields, saddles, and inserts at hangers for each type of insulation and hanger.
2. Detail insulation application at pipe expansion joints for each type of insulation.
3. Detail insulation application at elbows, fittings, flanges, valves, and specialties for each type of insulation.
4. Detail removable insulation at piping specialties, equipment connections, and access panels.
5. Detail field application for each equipment type.
C. Field quality-control reports.
1.3 QUALITY ASSURANCE
A. Fire-Test-Response Characteristics: Insulation and related materials shall have fire-test-response characteristics indicated, as determined by testing identical products per ASTM E 84, by a testing and inspecting agency acceptable to authorities having jurisdiction. Factory label insulation and jacket materials and adhesive, mastic, tapes, and cement material containers, with appropriate markings of applicable testing and inspecting agency.
1. Insulation Installed Indoors: Flame-spread index of 25 or less, and smoke-developed index of 50 or less.
MECHANICAL INSULATION 230700 - 2
PART 2 - PRODUCTS
2.1 INSULATION MATERIALS
A. Comply with requirements in Part 3 schedule articles for where insulating materials shall be applied.
B. Products shall not contain asbestos, lead, mercury, or mercury compounds.
C. Foam insulation materials shall not use CFC or HCFC blowing agents in the manufacturing process.
D. Flexible Elastomeric: Closed-cell, sponge- or expanded-rubber materials. Comply with ASTM C 534, Type I for tubular materials.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Armacell LLC.
b. RBX Corporation.
c. Approved equal.
E. Mineral-Fiber, Preformed Pipe Insulation:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Johns Manville.
b. Knauf Insulation.
c. Owens Corning.
d. Approved equal.
2. Type I, 850 deg F Materials: Mineral or glass fibers bonded with a thermosetting resin.
Comply with ASTM C 547, Type I, Grade A, with factory-applied ASJ. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.
2.2 ADHESIVES
A. Materials shall be compatible with insulation materials, jackets, and substrates and for bonding insulation to it and to surfaces to be insulated, unless otherwise indicated.
B. Mineral-Fiber Adhesive: Comply with MIL-A-3316C, Class 2, Grade A.
C. ASJ Jacket Adhesive: Comply with MIL-A-3316C, Class 2, Grade A for bonding insulation jacket lap seams and joints.
2.3 SEALANTS
A. ASJ and PVC Flashing Sealants:
1. Materials shall be compatible with insulation materials, jackets, and substrates.
2. Fire- and water-resistant, flexible, elastomeric sealant.
MECHANICAL INSULATION 230700 - 3
3. Service Temperature Range: Minus 40 to plus 250 deg F.
4. Color: White.
2.4 FACTORY-APPLIED JACKETS
A. Insulation system schedules indicate factory-applied jackets on various applications. When factory-applied jackets are indicated, comply with the following:
1. ASJ: White, kraft-paper, fiberglass-reinforced scrim with aluminum-foil backing; complying with ASTM C 1136, Type I.
2.5 TAPES
A. ASJ and PVC Tape: White vapor-retarder tape matching factory-applied jacket with acrylic adhesive, complying with ASTM C 1136.
1. Width: 3 inches.
2. Thickness: 11.5 mils.
3. Adhesion: 90 ounces force/inch in width.
4. Elongation: 2 percent.
5. Tensile Strength: 40 lbf/inch in width.
6. ASJ Tape Disks and Squares: Precut disks or squares of ASJ tape.
PART 3 - EXECUTION
3.1 PREPARATION
A. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application.
B. Coordinate insulation installation with the trade installing heat tracing. Comply with requirements for heat tracing that apply to insulation.
3.2 GENERAL INSTALLATION REQUIREMENTS
A. Install insulation materials, accessories, and finishes with smooth, straight, and even surfaces; free of voids throughout the length of equipment, ducts and fittings, and piping including fittings, valves, and specialties.
B. Install insulation materials, forms, vapor barriers or retarders, jackets, and thicknesses required for each item of equipment, duct system, and pipe system as specified in insulation system schedules.
C. Install accessories compatible with insulation materials and suitable for the service. Install accessories that do not corrode, soften, or otherwise attack insulation or jacket in either wet or dry state.
D. Install insulation with longitudinal seams at top and bottom of horizontal runs.
E. Install multiple layers of insulation with longitudinal and end seams staggered.
MECHANICAL INSULATION 230700 - 4
F. Do not weld brackets, clips, or other attachment devices to piping, fittings, and specialties.
G. Keep insulation materials dry during application and finishing.
H. Install insulation with tight longitudinal seams and end joints. Bond seams and joints with mechanical staples and adhesive recommended by insulation material manufacturer.
I. Install insulation with least number of joints practical.
J. Where vapor barrier is indicated, seal joints, seams, and penetrations in insulation at hangers, supports, anchors, and other projections with vapor-barrier mastic.
1. Install insulation continuously through hangers and around anchor attachments.
2. For insulation application where vapor barriers are indicated, extend insulation on anchor legs from point of attachment to supported item to point of attachment to structure. Taper and seal ends at attachment to structure with vapor-barrier mastic.
3. Install insert materials and install insulation to tightly join the insert. Seal insulation to insulation inserts with adhesive or sealing compound recommended by insulation material manufacturer.
4. Cover inserts with jacket material matching adjacent pipe insulation. Install shields over jacket, arranged to protect jacket from tear or puncture by hanger, support, and shield.
K. Apply adhesives and sealants at manufacturer's recommended coverage rate and wet and dry film thicknesses.
L. Install insulation with factory-applied jackets as follows:
1. Draw jacket tight and smooth.
2. Cover circumferential joints with 3-inch- wide strips, of same material as insulation jacket.
Secure strips with adhesive and outward clinching staples along both edges of strip, spaced 4 inches o.c.
3. Overlap jacket longitudinal seams at least 1-1/2 inches. Install insulation with longitudinal seams at bottom. Clean and dry surface to receive self-sealing lap. Staple laps with outward clinching staples along edge at 4 inches o.c.
a. For below ambient services, apply vapor-barrier mastic over staples.
4. Cover joints and seams with tape as recommended by insulation material manufacturer to maintain vapor seal.
5. Where vapor barriers are indicated, apply vapor-barrier mastic on seams and joints and at ends.
M. Cut insulation in a manner to avoid compressing insulation more than 75 percent of its nominal thickness.
N. Finish installation with systems at operating conditions. Repair joint separations and cracking due to thermal movement.
O. Repair damaged insulation facings by applying same facing material over damaged areas. Extend patches at least 4 inches beyond damaged areas. Adhere, staple, and seal patches similar to butt joints.
MECHANICAL INSULATION 230700 - 5
3.3 PENETRATIONS
A. Insulation Installation at Roof, Floor, Interior Wall and Partition Penetrations (That Are Not Fire Rated): Install insulation continuously through penetrations.
3.4 PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES
A. Insulation Installation at Fire-Rated Wall and Partition Penetrations:
1. Pipe: Install insulation continuously through penetrations of fire-rated walls and partitions.
B. Insulation Installation at Floor Penetrations:
1. Pipe: Install insulation continuously through floor penetrations.
3.5 GENERAL PIPE INSULATION INSTALLATION
A. Requirements in this article generally apply to all insulation materials except where more specific requirements are specified in various pipe insulation material installation articles.
B. Insulation Installation on Fittings, Valves, Strainers, Flanges, and Unions:
1. Install insulation over fittings, valves, strainers, flanges, unions, and other specialties with continuous thermal and vapor-retarder integrity, unless otherwise indicated.
2. Insulate pipe elbows using preformed fitting insulation or mitered fittings made from same material and density as adjacent pipe insulation. Each piece shall be butted tightly against adjoining piece and bonded with adhesive. Fill joints, seams, voids, and irregular surfaces with insulating cement finished to a smooth, hard, and uniform contour that is uniform with adjoining pipe insulation.
3. Insulate tee fittings with preformed fitting insulation or sectional pipe insulation of same material and thickness as used for adjacent pipe. Cut sectional pipe insulation to fit. Butt each section closely to the next and hold in place with tie wire. Bond pieces with adhesive.
4. Insulate valves using preformed fitting insulation or sectional pipe insulation of same material, density, and thickness as used for adjacent pipe. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker. For valves, insulate up to and including the bonnets, valve stuffing-box studs, bolts, and nuts. Fill joints, seams, and irregular surfaces with insulating cement.
5. Insulate strainers using preformed fitting insulation or sectional pipe insulation of same material, density, and thickness as used for adjacent pipe. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker. Fill joints, seams, and irregular surfaces with insulating cement. Insulate strainers so strainer basket flange or plug can be easily removed and replaced without damaging the insulation and jacket. Provide a removable reusable insulation cover. For below ambient services, provide a design that maintains vapor barrier.
6. Insulate flanges and unions using a section of oversized preformed pipe insulation. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker.
7. For services not specified to receive a field-applied jacket except for flexible elastomeric, install fitted PVC cover over elbows, tees, strainers, valves, flanges, and unions.
MECHANICAL INSULATION 230700 - 6
Terminate ends with PVC end caps. Tape PVC covers to adjoining insulation facing using PVC tape.
C. Insulate instrument connections for thermometers, pressure gages, pressure temperature taps, test connections, flow meters, sensors, switches, and transmitters on insulated pipes, vessels, and equipment. Shape insulation at these connections by tapering it to and around the connection with insulating cement and finish with finishing cement, mastic, and flashing sealant.
D. Install removable insulation covers at in-line instruments, control valves, and unions. Installation shall conform to the following:
1. Make removable flange and union insulation from sectional pipe insulation of same thickness as that on adjoining pipe. Install same insulation jacket as adjoining pipe insulation.
2. When flange and union covers are made from sectional pipe insulation, extend insulation from flanges or union long at least two times the insulation thickness over adjacent pipe insulation on each side of flange or union. Secure flange cover in place with stainless-steel or aluminum bands. Select band material compatible with insulation and jacket.
3. Construct removable valve insulation covers in same manner as for flanges except divide the two-part section on the vertical center line of valve body.
4. When covers are made from block insulation, make two halves, each consisting of mitered blocks wired to stainless-steel fabric. Secure this wire frame, with its attached insulation, to flanges with tie wire. Extend insulation at least 2 inches over adjacent pipe insulation on each side of valve. Fill space between flange or union cover and pipe insulation with insulating cement. Finish cover assembly with insulating cement applied in two coats. After first coat is dry, apply and trowel second coat to a smooth finish.
3.6 FLEXIBLE ELASTOMERIC INSULATION INSTALLATION
A. Seal longitudinal seams and end joints with manufacturers recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.
B. Insulation Installation on Pipe Flanges:
1. Install pipe insulation to outer diameter of pipe flange.
2. Make width of insulation section same as overall width of flange and bolts, plus twice the thickness of pipe insulation.
3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent straight pipe segments with cut sections of sheet insulation of same thickness as pipe insulation.
4. Secure insulation to flanges and seal seams with manufacturers recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.
C. Insulation Installation on Pipe Fittings and Elbows:
1. Install mitered sections of pipe insulation.
2. Secure insulation materials and seal seams with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.
D. Insulation Installation on Valves and Pipe Specialties:
1. Install preformed valve covers manufactured of same material as pipe insulation when available.
MECHANICAL INSULATION 230700 - 7
2. When preformed valve covers are not available, install cut sections of pipe and sheet insulation to valve body. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.
3. Install insulation to flanges as specified for flange insulation application.
4. Secure insulation to valves and specialties and seal seams with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.
3.7 MINERAL-FIBER INSULATION INSTALLATION
A. Insulation Installation on Straight Pipes and Tubes:
1. Secure each layer of preformed pipe insulation to pipe with wire or bands and tighten bands without deforming insulation materials.
2. Where vapor barriers are indicated, seal longitudinal seams, end joints, and protrusions with vapor-barrier mastic and joint sealant.
3. For insulation with factory-applied jackets on above ambient surfaces, secure laps with outward clinched staples at 6 inches o.c.
4. For insulation with factory-applied jackets on below ambient surfaces, do not staple longitudinal tabs but secure tabs with additional adhesive as recommended by insulation material manufacturer and seal with vapor-barrier mastic and flashing sealant.
B. Insulation Installation on Pipe Flanges:
1. Install preformed pipe insulation to outer diameter of pipe flange.
2. Make width of insulation section same as overall width of flange and bolts, plus twice the thickness of pipe insulation.
3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent straight pipe segments with mineral-fiber blanket insulation.
4. Install jacket material with manufacturer's recommended adhesive, overlap seams at least 1 inch, and seal joints with flashing sealant.
C. Insulation Installation on Pipe Fittings and Elbows:
1. Install preformed sections of same material as straight segments of pipe insulation when available.
2. When preformed insulation elbows and fittings are not available, install mitered sections of pipe insulation, to a thickness equal to adjoining pipe insulation. Secure insulation materials with wire or bands.
D. Insulation Installation on Valves and Pipe Specialties:
1. Install preformed sections of same material as straight segments of pipe insulation when available.
2. When preformed sections are not available, install mitered sections of pipe insulation to valve body.
3. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.
4. Install insulation to flanges as specified for flange insulation application.
3.8 FIELD QUALITY CONTROL
A. Perform tests and inspections.
MECHANICAL INSULATION 230700 - 8
B. Tests and Inspections:
1. Inspect pipe, fittings, strainers, and valves, randomly selected by Engineer, by removing field-applied jacket and insulation in layers in reverse order of their installation. Extent of inspection shall be limited to two locations of straight pipe, two locations of threaded fittings, two locations of welded fittings, two locations of threaded strainers, two locations of welded strainers, two locations of threaded valves, and two locations of flanged valves for each pipe service defined in the "Piping Insulation Schedule, General" Article.
C. All insulation applications will be considered defective Work if sample inspection reveals noncompliance with requirements.
3.9 PIPING INSULATION SCHEDULE, GENERAL
A. Acceptable preformed pipe and tubular insulation materials and thicknesses are identified for each piping system and pipe size range. If more than one material is listed for a piping system, selection from materials listed is Contractor's option.
B. Piping and Components Requiring Insulation:
1. All hydronic piping.
3.10 INDOOR PIPING INSULATION SCHEDULE
A. Hydronic-Water Supply and Return: Insulation shall be the following:
1. Piping NPS 1 and Smaller: Contractor shall have the option of the following:
a. Mineral-Fiber, Preformed Pipe Insulation, Type I: 1-1/2 inch-thick with factory-applied
ASJ Jacket.
b. Flexible elastomeric, Type 1: 1 inch thick.
2. Piping NPS 1½ and Larger-Mineral Fiber, Preformed Pipe Insulation, Type I: 2 inches thick with factory-applied ASJ Jacket.
END OF SECTION 230700
Rev. 1.0 11/17/2021
CABINET FOR HEALTH AND FAMILY SERVICES COVID-19 RELIGIOUS EXEMPTION REQUEST FORM
In accordance with the Centers for Medicare and Medicaid Services (CMS) COVID-19 vaccinate mandate required under 42 CFR Part 483, a COVID-19 vaccination is a condition of employment.
Please complete this form if you believe you have a religious reason why you cannot obtain the COVID-19 vaccine and would like to request an exemption. Requests for a religious exemption will be considered upon receipt of a completed form.
Employee Name Date of Request
Position & Department and Facility
Contractor Employee’s Supervisor Contractor
Questions Please describe the nature of your objection to the COVID-19 vaccination requirement.
Would complying with the COVID-19 vaccination requirement substantially burden your religious exercise?
If so, please explain how?
How long have you held the religious belief underlying your objection?
Please describe whether, as an adult, you have received any vaccines against any other diseases (such as a flu vaccine or a tetanus vaccine) and, if so, what vaccine you most recently received and when, to the best of your recollection.
Request For A Religious Exception To The COVID-19 Vaccination Requirement
If you do not have a religious objection to the use of all vaccines, please explain why your objection is limited to particular vaccines.
If there are any other medicines or products that you do not use because of the religious belief underlying your objection, please identify them.
Please provide any additional information that you think may be helpful in reviewing your request.
I declare to the best of my knowledge and ability that the foregoing is true and correct.
Employee Signature Date
Printed Name
| Addendum 1 |