ADDENDUM 1.pdf

PDF 16 KB Posted

Attached to
OLYMPIC RING FOUNTAIN UPGRADE/REFURBISHMENT
Solicitation number
PE-92200-RFQ-2024-000000002
Issued by
Fulton County, Georgia

About this file

This document is an addendum to a Request for Qualifications (RFQ) issued by the Georgia World Congress Center Authority (GWCCA) for the Olympic Ring Fountain Upgrade/Refurbishment project, designated as RFQ GWCC-0919-DB. The addendum provides clarification on several aspects of the RFQ, including the availability of Exhibits A, B, and C in Word format, the location for submitting the Statement of Qualifications on October 3, 2023, the role of subcontractors, and the status of the meeting scheduled for October 6, 2023. The addendum also addresses the Georgia Peach Certification and the placement of the Female-Owned Business Certification within the Statement of Qualifications.

The document does not provide any information regarding pricing terms, set asides, incumbents, funding requirements and sources, or other salient financial details. The focus of this addendum is on clarifying procedural and administrative aspects of the RFQ process.

View the file

Other files

File Type Posted
Design Build RFQ RFP Olympic Fountain Ring.pdf PDF
Project GWCC.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM ONE

GEORGIA WORLD CONGRESS CENTER AUTHORITY

OLYMPIC RING FOUNTAIN UPGRADE/REFURBISHMENT

RFQ GWCC-0919-DB

Addendum Issue Date: September 27, 2023

From: Georgia World Congress Center Authority

Purchasing Office

285 International Boulevard NW

Atlanta, Georgia 30313

Addendum 1 is hereby issued to incorporate the following as requirements of the Request for Qualifications, GWCC-0919-DB:

1. Is it possible to get the Word Document of Exhibits A, B and C? Since the

Disclosure Document requests additional information to be added to those forms.

You can convert the PDF documents into a Word document to make needed changes.

2. Where exactly is the Conference Hall/Office/Room Number to drop off the

Statement of Qualifications required on October 3, 2023? Building B, Administration, Level 4. You may call 404-223-4036, Administration.

3. Most Fountain Companies that do Design Build projects normally hire subcontractors to do any of the mechanical and electrical site work based of the

Design Build Drawings. Do you need the names of these subcontractors and their

GA licenses during the Statement of Qualifications Exhibit B form? Or will

GEFCO be considered as the CM with our subs as participants? Sub-contractors are to be considered as participants and information gathered at a later date if needed.

4. If selected as a finalist, is the meeting on 10/6/23 at 11:30 am mandatory? One place says if applicable and the other is mandatory. We recommend that respondents hold this date. GWCCA will determine whether this meeting will be required depending on the responses received.

5. Please explain how the Georgia Peach Certification is going to be helpful with the

Fountain Renovations. When looking at the Georgia Peach Certifications is list ways to reduce water consumption with low flow bathroom fittings and is mostly when used when designing or renovating buildings over 10,000 sq ft. The only item that GEFCO would propose to reduce would be the energy to operate the proposed lighting fixtures. All the existing fountain equipment would not be changed unless deemed unfit. If any item is to be replaced, then the same pump would be reinstalled with no changes. Georgia Peach Certification will not be required for this project.

6. Where in the Statement of Qualifications can we placed the Female-Owned

Business Certification? You may add anywhere on the document and highlight the information being added.

This addendum will be a part of RFQ GWCC-0919-DB and modifies the original proposal documents dated September 20, 2023, as noted.

NOTE: A signed acknowledgement of this addendum should be received by this office prior to the due date or should be attached to your proposal. A signature on this addendum does not constitute your signature on the original proposal document.

Authorized Signature: ___________________________________ Date: ___________

(Blue ink)

Name (Typed or Printed) ____________________________________

File details come from the government source that posted it. Updated .