Addendum 1.docx
DOCX document 21 KB Posted
- Attached to
- Downtown Infrastructure Improvements
- Solicitation number
- PE-74452-NONST-2026-000000003
- Issued by
- Ware County, Georgia
About this file
This is Addendum #1 to a Request for Qualifications (RFQ#6-2-26) issued by the City of Blairsville, Georgia, dated June 6, 2026, for engineering and/or architectural services related to downtown infrastructure improvements. The addendum corrects submission instructions, requiring all questions, statements of qualifications, Section 3 certification form requests, proposal packages, and addendum receipts to be submitted to Kristen Bentley, Economic Development and Planning Consultant, at the City of Blairsville, 62 Blue Ridge Street, Blairsville, GA 30512, via phone at (706) 745-2000 or email at ecdev@downtownblairsvillega.com. The original RFQ solicitation calls for statements of qualifications and proposals from qualified engineering and architectural firms with demonstrated experience in federal and state grant programs. Proposals are due July 3, 2026, with a draft Preliminary Engineering Report due no later than September 4, 2026. The scope encompasses preliminary design services and potential implementation services if funding is secured through programs including the Appalachian Regional Commission (ARC), Community Development Block Grant (CDBG), Economic Development Administration (EDA), Georgia Environmental Finance Authority (GEFA), and U.S. Department of Agriculture (USDA).
The addendum emphasizes that receipt of Addendum #1 must be acknowledged and included with all proposals; failure to include the addendum will result in proposal disqualification. Respondents must demonstrate technical qualifications and possess valid Georgia licensure, provide proof of Errors and Omissions Insurance, and complete the required Statement of Qualifications Form addressing company history, experience with applicable federal and state grant programs, key personnel qualifications, current workload, proposed scope of services, relevant project experience with references, and fees or percentages for preliminary engineering report and design and construction management services. The project is subject to Build America, Buy America Act (BABA) requirements mandating that all iron, steel, manufactured products, and construction materials be produced in the United States. The solicitation encourages Section 3 Business Concerns to apply under Section 3 of the HUD Act of 1968, and the City reserves the right to accept or reject any and all proposals and waive informalities in the proposal process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF BLAIRSVILLE
Engineering and/or Architectural Services
ADDENDUM #1
Date: June 6, 2026
To: All Potential Proposers of RFQ#6-2-26
Subject: Engineering and/or Architectural Services for downtown Blairsville infrastructure improvements
Proposers are informed that the above subject solicitation is hereby modified, corrected, or supplemented as specified, described and set forth in this Addendum. This Addendum becomes part of the contract documents, modifies the original request for qualifications documents and shall be as binding as if contained therein.
Revision to Submission Instructions:
CORRECTION
Questions, Statement of Qualifications, and Section 3 Certification form requests (i.e., request for Section 3 preference), proposal packages, and Addendum #1 receipt should be submitted to the name and address listed below:
Kristen Bentley, Economic Development and Planning Consultant City of Blairsville 62 Blue Ridge Street Blairsville, GA 30512 Phone: (706) 745-2000 Email: ecdev@downtownblairsvillega.com
We apologize for any inconvenience this may cause in preparing your proposal.
Please note receipt of Addendum #1 and submit with your proposal. If addendum is not included in your proposal, your proposal will be disqualified.
All other information remains unchanged.
Engineer/Architect Date
Addendum #1 - RFQ#6-2-26 Page 1 of 1 Infrastructure Improvements
File details come from the government source that posted it. Updated .